Back to kitchen remodel contractors
Bel Construction Company
- Based in
- San Mateo
- On San Francisco permits
- Jul 2000 to Nov 2025
- Last 24 months
- 1 permit filed
52 permits since 2000: 42 completed, 3 never finaled, 7 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 13 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2019 | Completed final sign-off Sep 2019 | 155 04th St | tenant improvement (interior remodel) no structure alteration: install kitchen equipment replace (replace/sink, add 1 hand sink) install new finishes (wall/floor/ceiling alter lightingDetails
tenant improvement (interior remodel) no structure alteration: install kitchen equipment replace (replace/sink, add 1 hand sink) install new finishes (wall/floor/ceiling alter lighting | $90,000 |
| Mar 21, 2019 | Completed final sign-off Apr 2022 | 482 Flood Av | comply nov 200667882.demo (e) grd flr rear laundry encl deck,deck stair,& awning.int remodel&minor rear horizotal addition. grd flr: remodel bathrm,new wet bar&int stair to upper flr; upper flr: remodel kitchen, bathrm,bedrms,dining&living areas,add bathrm.int wall frame demo<75%total.Details
comply nov 200667882.demo (e) grd flr rear laundry encl deck,deck stair,& awning.int remodel&minor rear horizotal addition. grd flr: remodel bathrm,new wet bar&int stair to upper flr; upper flr: remodel kitchen, bathrm,bedrms,dining&living areas,add bathrm.int wall frame demo<75%total. | $200,000 |
| Jul 24, 2015 | Completed final sign-off May 2016 | 1336 Shotwell St | kitchen remodel: replace (e) cabinets, appliances, new flooring, 12'x14'. repair existing front stairs for dry rott components, less than 50%Details
kitchen remodel: replace (e) cabinets, appliances, new flooring, 12'x14'. repair existing front stairs for dry rott components, less than 50% | $8,900 |
| Feb 17, 2015 | Completed final sign-off Nov 2015 | 151 Howth St | add new bedrm, family rm, study, half bath, laundry at ground flr. infill at rear ground flr. remodel (e) kitchen, relocate (e) bath. add (n) bath at 2nd flr. install new handrail at rear stairs.Details
add new bedrm, family rm, study, half bath, laundry at ground flr. infill at rear ground flr. remodel (e) kitchen, relocate (e) bath. add (n) bath at 2nd flr. install new handrail at rear stairs. | $80,000 |
| May 21, 2014 | Completed final sign-off Dec 2014 | 123 Duncan St | general kitchen remodel; replace kit. cabinet, flooring, new lighting, appliance, sink. (n) laundry room hookup. sheetrock/ painting. comply with cec150(k) 8Details
general kitchen remodel; replace kit. cabinet, flooring, new lighting, appliance, sink. (n) laundry room hookup. sheetrock/ painting. comply with cec150(k) 8 | $13,500 |
| Feb 17, 2012 | Completed final sign-off Jul 2012 | 722 43rd Av | remodel existing kitchen on 1st flr, 2nd flr rep (e) cabinets & counter top, tile flr, remodel (e) bathrm on 2nd level, rep all (e) fixtures, lights,fan, tile flr, upgrade elec to gfi, add dedicated circuits sheetrock in bathrmDetails
remodel existing kitchen on 1st flr, 2nd flr rep (e) cabinets & counter top, tile flr, remodel (e) bathrm on 2nd level, rep all (e) fixtures, lights,fan, tile flr, upgrade elec to gfi, add dedicated circuits sheetrock in bathrm | $18,500 |
| Nov 9, 2011 | Completed final sign-off Jul 2012 | 1374 Broadway | remodel of (e) kitchen & bathroom. replace all cabinets & plumbing fixts, appliances. install new recess lightings through out unit 1378.Details
remodel of (e) kitchen & bathroom. replace all cabinets & plumbing fixts, appliances. install new recess lightings through out unit 1378. | $38,000 |
| Feb 18, 2011 | Completed final sign-off May 2011 | 3136 Broderick St | #2- replace (e) kitchen cabinets & counter top, (n) sink, cab., (n) countertop, (n) recess lites, (n) tile floor, (n) sub-panel, (n) hood range, rep. appliances. replace (e) bath tub, wall tiles, floor tiles, vanity, fan, toilet. provide high efficency lights per cec150(k)Details
#2- replace (e) kitchen cabinets & counter top, (n) sink, cab., (n) countertop, (n) recess lites, (n) tile floor, (n) sub-panel, (n) hood range, rep. appliances. replace (e) bath tub, wall tiles, floor tiles, vanity, fan, toilet. provide high efficency lights per cec150(k) | $10,000 |
| Jun 5, 2009 | Completed final sign-off Feb 2010 | 1969 Jefferson St | remove & replace (e) kitchen cabinets, plumbing fixtures, lights, hood fan. remove & replace (e) bathroom plumbing fixtures, lightings, fans, windows, floor tiles, tub, shower. (2 bathrooms) no structural work. windows not viewable from street. 5 windows.Details
remove & replace (e) kitchen cabinets, plumbing fixtures, lights, hood fan. remove & replace (e) bathroom plumbing fixtures, lightings, fans, windows, floor tiles, tub, shower. (2 bathrooms) no structural work. windows not viewable from street. 5 windows. | $30,000 |
| Mar 13, 2009 | Completed final sign-off Aug 2009 | 430 02nd Av | remodel bathroom. r/r all plumbing fixtures, replace kitchen cabinets & counter. install new i.c. cans recessed lighting. replace (e) windows with new vinyl windows & door. replace kitchen / bath tile floor. (total of 4 kitchen / baths).Details
remodel bathroom. r/r all plumbing fixtures, replace kitchen cabinets & counter. install new i.c. cans recessed lighting. replace (e) windows with new vinyl windows & door. replace kitchen / bath tile floor. (total of 4 kitchen / baths). | $50,000 |
| Jan 16, 2008 | Completed final sign-off May 2008 | 841 Darien Wy | bathrm and kitchen remodel-new sub panel, replace plumbing fixtures, new kitchen cabinets, countertops, new flooring and lighting. new lightings (n) hood fan/bath fan. no structural work. comply with energy code.title 24.Details
bathrm and kitchen remodel-new sub panel, replace plumbing fixtures, new kitchen cabinets, countertops, new flooring and lighting. new lightings (n) hood fan/bath fan. no structural work. comply with energy code.title 24. | $15,000 |
| Aug 18, 2004 | Completed final sign-off Feb 2005 | 69 Rockaway Av | build new deck 4' high.remodel kitchen.repl all cabinets.install door&1 window facing backyd.no struDetails
build new deck 4' high.remodel kitchen.repl all cabinets.install door&1 window facing backyd.no stru | $20,000 |
| Sep 12, 2003 | Completed final sign-off Feb 2004 | 2475 15th Av | remodel existing kitchen. (r&r) cabs/relocate plumbing & (n) electrical, existing window in kitchenDetails
remodel existing kitchen. (r&r) cabs/relocate plumbing & (n) electrical, existing window in kitchen | $12,000 |
| Jan 28, 2002 | Expired or cancelled expired Jul 2002 | 425 Bella Vista Wy | remodel exist kitchen-new cabinets, countertops, appliances, sink,window, door&vinyl floor.Details
remodel exist kitchen-new cabinets, countertops, appliances, sink,window, door&vinyl floor. | $16,000 |