Bel Construction Company
- Based in
- San Mateo
- On San Francisco permits
- Jul 2000 to Nov 2025
- Last 24 months
- 1 permit filed
52 permits since 2000: 42 completed, 3 never finaled, 7 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 1 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2019 | Completed final sign-off Apr 2022 | 482 Flood Av | comply nov 200667882.demo (e) grd flr rear laundry encl deck,deck stair,& awning.int remodel&minor rear horizotal addition. grd flr: remodel bathrm,new wet bar&int stair to upper flr; upper flr: remodel kitchen, bathrm,bedrms,dining&living areas,add bathrm.int wall frame demo<75%total.Details
comply nov 200667882.demo (e) grd flr rear laundry encl deck,deck stair,& awning.int remodel&minor rear horizotal addition. grd flr: remodel bathrm,new wet bar&int stair to upper flr; upper flr: remodel kitchen, bathrm,bedrms,dining&living areas,add bathrm.int wall frame demo<75%total. | $200,000 |
| Jun 19, 2017 | Completed final sign-off Jul 2017 | 1822 21st Av | dry rot repair of extg rear yard stairway in kind.Details
dry rot repair of extg rear yard stairway in kind. | $2,000 |
| Jul 24, 2015 | Completed final sign-off May 2016 | 1336 Shotwell St | kitchen remodel: replace (e) cabinets, appliances, new flooring, 12'x14'. repair existing front stairs for dry rott components, less than 50%Details
kitchen remodel: replace (e) cabinets, appliances, new flooring, 12'x14'. repair existing front stairs for dry rott components, less than 50% | $8,900 |
| Feb 17, 2015 | Completed final sign-off Nov 2015 | 151 Howth St | add new bedrm, family rm, study, half bath, laundry at ground flr. infill at rear ground flr. remodel (e) kitchen, relocate (e) bath. add (n) bath at 2nd flr. install new handrail at rear stairs.Details
add new bedrm, family rm, study, half bath, laundry at ground flr. infill at rear ground flr. remodel (e) kitchen, relocate (e) bath. add (n) bath at 2nd flr. install new handrail at rear stairs. | $80,000 |
| Nov 9, 2011 | Completed final sign-off Jan 2013 | 2965 25th Av | 1. repair damaged front stair way. repour concrete steps. 2. (n) bedrooms & 2 bathrooms, 1 new family & storage to be constructed at ground foor level.Details
1. repair damaged front stair way. repour concrete steps. 2. (n) bedrooms & 2 bathrooms, 1 new family & storage to be constructed at ground foor level. | $38,000 |