Back to kitchen remodel contractors
Behan Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Oct 2025
- Last 24 months
- 12 permits filed
75 permits since 2000: 63 completed, 1 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 11 completed, 1 in progress, 1 expired or cancelled. Typically 10 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2025 | In progress issued Oct 2025 | 46 Putnam St | retile bathtub in upstairs bathroom, change countertop, existing kitchen to remain.Details
retile bathtub in upstairs bathroom, change countertop, existing kitchen to remain. | $10,000 |
| Sep 30, 2025 | Completed final sign-off Mar 2026 | 1242 Palou Av | remodel kitchen same location for allDetails
remodel kitchen same location for all | $10,000 |
| Dec 5, 2022 | Completed final sign-off Jul 2023 | 1319 03rd Av | interior remodel-change counter and cabinets of (e) kitchen. add (n) powder rm @ 1st level, add (n) bathrm @ 2nd level. remodel (e) bathrm @ 2nd level. widen opening between (e) kitchen & dining rm.Details
interior remodel-change counter and cabinets of (e) kitchen. add (n) powder rm @ 1st level, add (n) bathrm @ 2nd level. remodel (e) bathrm @ 2nd level. widen opening between (e) kitchen & dining rm. | $60,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2022 | 2844 Gough St | new tile in bathroom and shower, tube to remain toilet to remain. new kitchen cabinets and counter top, tile to remain. same layout and add floating shelves new. reuse existing appliances.Details
new tile in bathroom and shower, tube to remain toilet to remain. new kitchen cabinets and counter top, tile to remain. same layout and add floating shelves new. reuse existing appliances. | $35,000 |
| Apr 12, 2019 | Completed final sign-off Aug 2019 | 680 Los Palmos Dr | remove old kitchen cabinets and install new cabinets, flooring, and counter top. remodel bathroom.Details
remove old kitchen cabinets and install new cabinets, flooring, and counter top. remodel bathroom. | $60,000 |
| Dec 20, 2018 | Completed final sign-off Apr 2019 | 1817 Stockton St | remove interior wall to open up living room & kitchen by installing structural beamDetails
remove interior wall to open up living room & kitchen by installing structural beam | $8,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2019 | 1119 Noe St | interior remodel . create new bathroom, move kitchen, reverse living and sleeping areas, no structural workDetails
interior remodel . create new bathroom, move kitchen, reverse living and sleeping areas, no structural work | $120,000 |
| Oct 3, 2018 | Completed final sign-off Jun 2019 | 211 Genebern Wy | remodel existing interior house, first fl: relocate furnace and stairs, change garage door, 2nd fl: make a master bedroom with bath, new laundry, home office and relocate kitchen.Details
remodel existing interior house, first fl: relocate furnace and stairs, change garage door, 2nd fl: make a master bedroom with bath, new laundry, home office and relocate kitchen. | $80,000 |
| Oct 2, 2017 | Completed final sign-off May 2018 | 734 Clayton St | add habitable space at garage area. to remodel (e) kitchen, (e) family rm & (e) dining rm. to change sunroom to (n) deck. remodel (e) bathroom & add bedroom #4 at second fl.Details
add habitable space at garage area. to remodel (e) kitchen, (e) family rm & (e) dining rm. to change sunroom to (n) deck. remodel (e) bathroom & add bedroom #4 at second fl. | $160,000 |
| Sep 8, 2017 | Completed final sign-off Feb 2018 | 95 26th Av | unit a - to switch existing dining and kitchen areas; lower existing chimney and change it to gas; to change tile at 2 existing bathrooms; no exterior work to be doneDetails
unit a - to switch existing dining and kitchen areas; lower existing chimney and change it to gas; to change tile at 2 existing bathrooms; no exterior work to be done | $20,000 |
| Apr 18, 2017 | Completed final sign-off Mar 2018 | 35 Noe St | convert existing bedroom to new bath & closet, remodel (e) bath & portion of kitchen, remove one load bearing wall.Details
convert existing bedroom to new bath & closet, remodel (e) bath & portion of kitchen, remove one load bearing wall. | $35,000 |
| Sep 29, 2016 | Completed final sign-off Sep 2017 | 33 Retiro Wy | upgrade existing stairs to the garage with new stairs dimensions. change bathroom tiles, change counter @ kitchen. bolt existing foundation, no exterior work to be done.Details
upgrade existing stairs to the garage with new stairs dimensions. change bathroom tiles, change counter @ kitchen. bolt existing foundation, no exterior work to be done. | $40,000 |
| Nov 19, 2015 | Expired or cancelled cancelled Jan 2026 | 450 Mission St | office #501: 1)to change extg kitchen cabinets in kind. 2)kitchen area 351. 3)no framing work to be done. n/a for maherDetails
office #501: 1)to change extg kitchen cabinets in kind. 2)kitchen area 351. 3)no framing work to be done. n/a for maher | $15,000 |