Behan Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Oct 2025
- Last 24 months
- 12 permits filed
75 permits since 2000: 63 completed, 1 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 15 completed, 1 in progress, 2 never finaled. Typically 11 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2025 | In progress issued Oct 2025 | 46 Putnam St | retile bathtub in upstairs bathroom, change countertop, existing kitchen to remain.Details
retile bathtub in upstairs bathroom, change countertop, existing kitchen to remain. | $10,000 |
| Dec 2, 2024 | Completed final sign-off Jul 2025 | 3624 17th St | rehab lwr unit, 2 bed & 2 bath after sesmic upgrade was completed. new flooring, baseboard, trim, sheetrocking & insulation patching where needed. no wall demolition or construction, no change in plumbing fixture count. refer to 1st floor plan on sheet a2 of p/a 2024-0205-5214 dwgs for floor plan.Details
rehab lwr unit, 2 bed & 2 bath after sesmic upgrade was completed. new flooring, baseboard, trim, sheetrocking & insulation patching where needed. no wall demolition or construction, no change in plumbing fixture count. refer to 1st floor plan on sheet a2 of p/a 2024-0205-5214 dwgs for floor plan. | $150,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2022 | 2844 Gough St | new tile in bathroom and shower, tube to remain toilet to remain. new kitchen cabinets and counter top, tile to remain. same layout and add floating shelves new. reuse existing appliances.Details
new tile in bathroom and shower, tube to remain toilet to remain. new kitchen cabinets and counter top, tile to remain. same layout and add floating shelves new. reuse existing appliances. | $35,000 |
| Jul 11, 2022 | Completed final sign-off Dec 2023 | 1027 Felton St | addition to back side of single family residence to include new bedrooms with 2nd floor deck above. remodel at 1st floor to include media room and bathrooms.Details
addition to back side of single family residence to include new bedrooms with 2nd floor deck above. remodel at 1st floor to include media room and bathrooms. | $32,300 |
| Sep 28, 2020 | Completed final sign-off Nov 2020 | 454 Gates St | retile exisitng bathroom floor, walls. re-install existing bathroom fixture & tub. patch sheetrock & water proofDetails
retile exisitng bathroom floor, walls. re-install existing bathroom fixture & tub. patch sheetrock & water proof | $4,000 |
| Aug 28, 2019 | Completed final sign-off Oct 2019 | 571 34th Av | reside rear of building after abestos siding is removed by specialist. remoedl 1 bathroom, tub & sink, tiling.Details
reside rear of building after abestos siding is removed by specialist. remoedl 1 bathroom, tub & sink, tiling. | $20,000 |
| Aug 16, 2019 | Completed final sign-off Mar 2020 | 385 Justin Dr | the scope of work includes relocation of the (e) interior stair and addition of a (n) bedroom, home office, bath, laundry room and media room @ the (e) 1st floor level. (n) exterior windows/doors and siding to be installed @ the rear elevation and west lightwellDetails
the scope of work includes relocation of the (e) interior stair and addition of a (n) bedroom, home office, bath, laundry room and media room @ the (e) 1st floor level. (n) exterior windows/doors and siding to be installed @ the rear elevation and west lightwell | $125,000 |
| Apr 12, 2019 | Completed final sign-off Aug 2019 | 680 Los Palmos Dr | remove old kitchen cabinets and install new cabinets, flooring, and counter top. remodel bathroom.Details
remove old kitchen cabinets and install new cabinets, flooring, and counter top. remodel bathroom. | $60,000 |
| Jan 15, 2019 | Completed final sign-off May 2019 | 379 Nevada St | add additional 1 bedrooms & 1 bathrooms at staraoage area in garage area with 2 additional closets in hallway.Details
add additional 1 bedrooms & 1 bathrooms at staraoage area in garage area with 2 additional closets in hallway. | $80,000 |
| Nov 19, 2018 | Never finaled issued Feb 2019, no final | 16 Putnam St | revision to 201702240120 add master bedroom and bath at attic area. roof is going to be risen. remodel (e) bath at second floorDetails
revision to 201702240120 add master bedroom and bath at attic area. roof is going to be risen. remodel (e) bath at second floor | $50,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2019 | 1119 Noe St | interior remodel . create new bathroom, move kitchen, reverse living and sleeping areas, no structural workDetails
interior remodel . create new bathroom, move kitchen, reverse living and sleeping areas, no structural work | $120,000 |
| Oct 3, 2018 | Completed final sign-off Jun 2019 | 211 Genebern Wy | remodel existing interior house, first fl: relocate furnace and stairs, change garage door, 2nd fl: make a master bedroom with bath, new laundry, home office and relocate kitchen.Details
remodel existing interior house, first fl: relocate furnace and stairs, change garage door, 2nd fl: make a master bedroom with bath, new laundry, home office and relocate kitchen. | $80,000 |
| Oct 2, 2017 | Completed final sign-off May 2018 | 734 Clayton St | add habitable space at garage area. to remodel (e) kitchen, (e) family rm & (e) dining rm. to change sunroom to (n) deck. remodel (e) bathroom & add bedroom #4 at second fl.Details
add habitable space at garage area. to remodel (e) kitchen, (e) family rm & (e) dining rm. to change sunroom to (n) deck. remodel (e) bathroom & add bedroom #4 at second fl. | $160,000 |
| Sep 8, 2017 | Completed final sign-off Feb 2018 | 95 26th Av | unit a - to switch existing dining and kitchen areas; lower existing chimney and change it to gas; to change tile at 2 existing bathrooms; no exterior work to be doneDetails
unit a - to switch existing dining and kitchen areas; lower existing chimney and change it to gas; to change tile at 2 existing bathrooms; no exterior work to be done | $20,000 |
| Apr 18, 2017 | Completed final sign-off Mar 2018 | 35 Noe St | convert existing bedroom to new bath & closet, remodel (e) bath & portion of kitchen, remove one load bearing wall.Details
convert existing bedroom to new bath & closet, remodel (e) bath & portion of kitchen, remove one load bearing wall. | $35,000 |
| Feb 24, 2017 | Never finaled issued Nov 2018, no final | 16 Putnam St | vertical addition.add 1 mstr bedroom & bath@attic area.raised roof.remodel (e)bath 1/fl.add frt window at bsmt.Details
vertical addition.add 1 mstr bedroom & bath@attic area.raised roof.remodel (e)bath 1/fl.add frt window at bsmt. | $50,000 |
| Sep 29, 2016 | Completed final sign-off Sep 2017 | 33 Retiro Wy | upgrade existing stairs to the garage with new stairs dimensions. change bathroom tiles, change counter @ kitchen. bolt existing foundation, no exterior work to be done.Details
upgrade existing stairs to the garage with new stairs dimensions. change bathroom tiles, change counter @ kitchen. bolt existing foundation, no exterior work to be done. | $40,000 |
| Nov 10, 2015 | Completed final sign-off Mar 2017 | 16 Putnam St | at (e) basement to add gym area and small computer room with half bath and storage, new stairs at existing laundry area and move laundry to (e) pantry. no exterior work to be done.Details
at (e) basement to add gym area and small computer room with half bath and storage, new stairs at existing laundry area and move laundry to (e) pantry. no exterior work to be done. | $50,000 |