Becca Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Aug 2010
- Last 24 months
- 0 permits filed
44 permits since 2000: 33 completed, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 never finaled. Typically 1 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2010 | Completed final sign-off Apr 2011 | 390 Bay Shore Bl | t.i. to create new gym facility.new dbl dr entries at frt facade. new womens&mens restrms at 1/fl.new stairs to connect 1st&2nd fls.2 new pits ecavated at 1/fl.new lighting,finishes,mech wk provided.new windows&doors.public assembly permit is req fr sffd,sprinkler/fy under sep permit.Details
t.i. to create new gym facility.new dbl dr entries at frt facade. new womens&mens restrms at 1/fl.new stairs to connect 1st&2nd fls.2 new pits ecavated at 1/fl.new lighting,finishes,mech wk provided.new windows&doors.public assembly permit is req fr sffd,sprinkler/fy under sep permit. | $247,000 |
| Nov 6, 2009 | Completed final sign-off Oct 2011 | 35 Liberty St | 2 story addition to the upper and lower units into the rear yard 7'6" (330sf). 2 new full bathrooms, 2 new laundr rooms. new roof deck eith a new stair penthouse to access it on the upper level. moving (e) spiral metal stair to the center of the rear facade.Details
2 story addition to the upper and lower units into the rear yard 7'6" (330sf). 2 new full bathrooms, 2 new laundr rooms. new roof deck eith a new stair penthouse to access it on the upper level. moving (e) spiral metal stair to the center of the rear facade. | $200,000 |
| Dec 28, 2007 | Completed final sign-off Sep 2012 | 37 Miguel St | rev to#200206179149.to comply nov 200339477,200453765.remodel 3 unit apt bldg.,prevly apprv under #200206179149.incl design chges fr prev permit (which weren't built).(n)partitions,(n)inter stairs in 3 stry lower unit,(n)occupied space fr(e)crawlspace.expansion/reduction of(e)deck.Details
rev to#200206179149.to comply nov 200339477,200453765.remodel 3 unit apt bldg.,prevly apprv under #200206179149.incl design chges fr prev permit (which weren't built).(n)partitions,(n)inter stairs in 3 stry lower unit,(n)occupied space fr(e)crawlspace.expansion/reduction of(e)deck. | $275,000 |
| Sep 11, 2007 | Completed final sign-off Mar 2008 | 861 Elizabeth St | bathroom remodel to existing 1st floor bath, remodel 2nd floor kitchen, repair / replace two front stairs+ two front doors, two landings on front in kind less than 50%. replace 5 window, visable from street, same size and locationDetails
bathroom remodel to existing 1st floor bath, remodel 2nd floor kitchen, repair / replace two front stairs+ two front doors, two landings on front in kind less than 50%. replace 5 window, visable from street, same size and location | $65,000 |
| Apr 20, 2007 | Completed final sign-off Jan 2008 | 767 Marina Bl | revision to existing appl#200703287443 various structural revision per inspectors at stairs, family & roof areas.Details
revision to existing appl#200703287443 various structural revision per inspectors at stairs, family & roof areas. | $5,000 |
| Jul 19, 2006 | Completed final sign-off Oct 2006 | 645 Congo St | revision to pa# 2004/07/09/8397 to revise design of entry stair rail to slat fence. replace portions of sideyard walkway.Details
revision to pa# 2004/07/09/8397 to revise design of entry stair rail to slat fence. replace portions of sideyard walkway. | |
| Jul 10, 2006 | Never finaled issued Jul 2006, no final | 521 Liberty St | interior renovations: remodel kitchen & bathroom. (replace cabinets, fixtures, appliance). addtional work-repair/replace plaster (30% of walls) repair/replace hardwood floors, painting, repair entry stairs treads less than 50%.Details
interior renovations: remodel kitchen & bathroom. (replace cabinets, fixtures, appliance). addtional work-repair/replace plaster (30% of walls) repair/replace hardwood floors, painting, repair entry stairs treads less than 50%. | $65,000 |