Back to bathroom remodel contractors
Becca Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Aug 2010
- Last 24 months
- 0 permits filed
44 permits since 2000: 33 completed, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 5 completed, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 6, 2009 | Completed final sign-off Oct 2011 | 35 Liberty St | 2 story addition to the upper and lower units into the rear yard 7'6" (330sf). 2 new full bathrooms, 2 new laundr rooms. new roof deck eith a new stair penthouse to access it on the upper level. moving (e) spiral metal stair to the center of the rear facade.Details
2 story addition to the upper and lower units into the rear yard 7'6" (330sf). 2 new full bathrooms, 2 new laundr rooms. new roof deck eith a new stair penthouse to access it on the upper level. moving (e) spiral metal stair to the center of the rear facade. | $200,000 |
| Sep 11, 2007 | Completed final sign-off Mar 2008 | 861 Elizabeth St | bathroom remodel to existing 1st floor bath, remodel 2nd floor kitchen, repair / replace two front stairs+ two front doors, two landings on front in kind less than 50%. replace 5 window, visable from street, same size and locationDetails
bathroom remodel to existing 1st floor bath, remodel 2nd floor kitchen, repair / replace two front stairs+ two front doors, two landings on front in kind less than 50%. replace 5 window, visable from street, same size and location | $65,000 |
| Jun 27, 2007 | Completed final sign-off Sep 2007 | 3439 Scott St | revision to (e) permit #2007052220020-additional work to interior bathroom remodelDetails
revision to (e) permit #2007052220020-additional work to interior bathroom remodel | $6,000 |
| May 22, 2007 | Never finaled issued May 2007, no final | 3439 Scott St | remodel bathroom & laundry room. replace (e) fixtures, floor & wall coverings, cabinetry.Details
remodel bathroom & laundry room. replace (e) fixtures, floor & wall coverings, cabinetry. | $32,000 |
| Mar 5, 2007 | Expired or cancelled expired Jan 2008 | 767 Marina Bl | ineterior renovatoin to residence consisting of paiting and refinishing wood flloors. remodel bathroom replace in kind no stuctural work . fluorescent or control by motion sensorDetails
ineterior renovatoin to residence consisting of paiting and refinishing wood flloors. remodel bathroom replace in kind no stuctural work . fluorescent or control by motion sensor | $20,000 |
| Aug 31, 2006 | Expired or cancelled expired Mar 2007 | 521 Liberty St | revision to existing permit 200607106128 new bath @ (e) bedroomn 2nd & half bth @ 1st floor removal of existing ealk conersions throughout to upgrade plumbing & electrical no more than 50% of (e) lath & plaster to be removedDetails
revision to existing permit 200607106128 new bath @ (e) bedroomn 2nd & half bth @ 1st floor removal of existing ealk conersions throughout to upgrade plumbing & electrical no more than 50% of (e) lath & plaster to be removed | $20,000 |
| Jul 10, 2006 | Never finaled issued Jul 2006, no final | 521 Liberty St | interior renovations: remodel kitchen & bathroom. (replace cabinets, fixtures, appliance). addtional work-repair/replace plaster (30% of walls) repair/replace hardwood floors, painting, repair entry stairs treads less than 50%.Details
interior renovations: remodel kitchen & bathroom. (replace cabinets, fixtures, appliance). addtional work-repair/replace plaster (30% of walls) repair/replace hardwood floors, painting, repair entry stairs treads less than 50%. | $65,000 |
| Mar 22, 2006 | Completed final sign-off Jul 2006 | 89 Castenada Av | remove existing kitchen cabinets and appliances. new cabinets, appliances, sinks, wall up door from kitchen to hall. new lighting. renovate bathroom replacing sink, toilet, tub in same place. existing lightingDetails
remove existing kitchen cabinets and appliances. new cabinets, appliances, sinks, wall up door from kitchen to hall. new lighting. renovate bathroom replacing sink, toilet, tub in same place. existing lighting | $50,000 |
| May 11, 2005 | Never finaled issued May 2005, no final | 357 Tehama St | remodel (e) 1 bedroom, 2 bathroom. add new bath / bedroom. kitchen remodel.Details
remodel (e) 1 bedroom, 2 bathroom. add new bath / bedroom. kitchen remodel. | $40,000 |
| Dec 10, 2004 | Completed final sign-off Jun 2005 | 1418 Jackson St | remodel bathroom,replace plumbing fix. in same location,add lighting,replace exhaust fan,wall,floorDetails
remodel bathroom,replace plumbing fix. in same location,add lighting,replace exhaust fan,wall,floor | $8,500 |