Block 5596, lot 013
390 Bay Shore Blvd
- City’s use
- Industrial
- Built
- 1937
- Stories
- 2
- Rooms
- 3 bathrooms
- Building
- 11,730 sq ft
- Lot
- 10,735 sq ft
- Zoning
- M1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2015 | Completed final sign-off Feb 2016 | 390 Bay Shore Bl | Bigham Taylor Roofing Co | reroofingDetails
reroofing | $25,000 |
| Mar 10, 2011 | Completed final sign-off Apr 2011 | 390 Bay Shore Bl | G C Electric | install 1 fire sprinkler monitoring system. ti permit application # 2010.08.09.8411 issued( not completed yet) for referenceDetails
install 1 fire sprinkler monitoring system. ti permit application # 2010.08.09.8411 issued( not completed yet) for reference | $3,500 |
| Feb 17, 2011 | Completed final sign-off Apr 2011 | 390 Bay Shore Bl | Michael Mc Nulty Construction***Ask Id | as-built revision to extg app #201008098411. additional waterproofing & drainage details for gymnastic pits. revise/modify first floor & 2nd floor accessible entry and ramps. various clarifications to plans.Details
as-built revision to extg app #201008098411. additional waterproofing & drainage details for gymnastic pits. revise/modify first floor & 2nd floor accessible entry and ramps. various clarifications to plans. | $20,000 |
| Jan 20, 2011 | Never finaled issued Jan 2011, no final | 390 Bay Shore Bl | street space permit (201012206988)Details
street space permit (201012206988) | ||
| Dec 20, 2010 | Completed final sign-off Apr 2011 | 390 Bay Shore Bl | Bay Cities Fire Protection | 1st fl replace a few paint sprinkelrs. relocate heads to be in center of lights. 2nd fl add 1 heads on corner by exercise room, all bracing and hanger in correct positionDetails
1st fl replace a few paint sprinkelrs. relocate heads to be in center of lights. 2nd fl add 1 heads on corner by exercise room, all bracing and hanger in correct position | $3,500 |
| Dec 14, 2010 | Never finaled issued Dec 2010, no final | 390 Bay Shore Bl | Stanley Nicholas Grgich | amendment to permit #201008098411. retain (e) curb cut.Details
amendment to permit #201008098411. retain (e) curb cut. | |
| Aug 17, 2010 | Completed final sign-off Aug 2010 | 390 Bay Shore Bl | Becca Construction Inc | to obtain final inspection for work approved under pa 09010149; all work is completeDetails
to obtain final inspection for work approved under pa 09010149; all work is complete | |
| Aug 9, 2010 | Completed final sign-off Apr 2011 | 390 Bay Shore Bl | Becca Construction Inc | t.i. to create new gym facility.new dbl dr entries at frt facade. new womens&mens restrms at 1/fl.new stairs to connect 1st&2nd fls.2 new pits ecavated at 1/fl.new lighting,finishes,mech wk provided.new windows&doors.public assembly permit is req fr sffd,sprinkler/fy under sep permit.Details
t.i. to create new gym facility.new dbl dr entries at frt facade. new womens&mens restrms at 1/fl.new stairs to connect 1st&2nd fls.2 new pits ecavated at 1/fl.new lighting,finishes,mech wk provided.new windows&doors.public assembly permit is req fr sffd,sprinkler/fy under sep permit. | $247,000 |
| Mar 24, 2010 | Completed final sign-off May 2010 | 390 Bay Shore Bl | Stanley Nicholas Grgich | replace front windows in kind (total of 37) aluminum frames. windows overall size 42"wd x 68 tall. exposer to glass. all sides. overall quantity dimensions and location to be replaced in kind. u-0.77 for conditioned space windows.Details
replace front windows in kind (total of 37) aluminum frames. windows overall size 42"wd x 68 tall. exposer to glass. all sides. overall quantity dimensions and location to be replaced in kind. u-0.77 for conditioned space windows. | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Becca Construction Inc (2), Stanley Nicholas Grgich (2), Bay Cities Fire Protection, Bigham Taylor Roofing Co, G C Electric, Michael Mc Nulty Construction***Ask Id
- Architects
- Baukunst Architecture, Jace Garth Levinson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.