Beauty Home Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Oct 2010 to Nov 2018
- Last 24 months
- 0 permits filed
21 permits since 2000: 19 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 13 days from filing to permit and 330 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2013 | Completed final sign-off Dec 2015 | 101 Maple St | revision to pa# 2012-0221-4556/s1-modify interior partitins, interior stairs, bathroom & kitchen location. new accessible roof deck. modifications of structural design.Details
revision to pa# 2012-0221-4556/s1-modify interior partitins, interior stairs, bathroom & kitchen location. new accessible roof deck. modifications of structural design. | $90,000 |
| Jul 18, 2012 | Completed final sign-off May 2013 | 719 18th Av | new stairs between 1st, 2nd, and 3rd flr. removal of kitchenette at 1st flr. removal of wood framed flr at 1st level down to slab. remodel of kitchen and all baths. (e) windows to be replaced. new front doors. trim replaced in kind. new paint. new eye brow roof comply with nov #201169273.Details
new stairs between 1st, 2nd, and 3rd flr. removal of kitchenette at 1st flr. removal of wood framed flr at 1st level down to slab. remodel of kitchen and all baths. (e) windows to be replaced. new front doors. trim replaced in kind. new paint. new eye brow roof comply with nov #201169273. | $140,000 |
| Dec 6, 2011 | Completed final sign-off Nov 2012 | 147 14th Av | repair & upgrade (e) rear deck, handrails,guardrails, replace(e) windows w/new same size, in-kind, ext surface finis,1st flr:new fam/media rm, new bedrm, new bath, relocate int. stair. 2nd flr: remodel ktichen & add half bath,gas fireplace insert. 3rd flr: remodel (e)baths, bedrms, add new bath.Details
repair & upgrade (e) rear deck, handrails,guardrails, replace(e) windows w/new same size, in-kind, ext surface finis,1st flr:new fam/media rm, new bedrm, new bath, relocate int. stair. 2nd flr: remodel ktichen & add half bath,gas fireplace insert. 3rd flr: remodel (e)baths, bedrms, add new bath. | $200,000 |
| Jan 21, 2011 | Completed final sign-off Dec 2011 | 132 25th Av | interior remodel on all floors. new foundation for entire building to lower floor. new family/media room bldg infill below (e) 2nd story at rear. convert stor/laundry/study to bedrm,bath; add 1/2 bath; create 2 bedrooms; rebuild balcony.add bay at rear.replace windows in kind.rear stairs,Details
interior remodel on all floors. new foundation for entire building to lower floor. new family/media room bldg infill below (e) 2nd story at rear. convert stor/laundry/study to bedrm,bath; add 1/2 bath; create 2 bedrooms; rebuild balcony.add bay at rear.replace windows in kind.rear stairs, | $200,000 |
| Oct 28, 2010 | Completed final sign-off Apr 2011 | 231 12th Av | renovate (e) sfd-repl windows in (e) locations, repair/repl (e) kitchen floor, remodel kitchen, add 1/2 bath, remodel (e) bathrms, add master bath, upgrd stairs between 1st & 2nd flrs, in-fill @rear on 1st fl. legalize room on garage level/1st floorDetails
renovate (e) sfd-repl windows in (e) locations, repair/repl (e) kitchen floor, remodel kitchen, add 1/2 bath, remodel (e) bathrms, add master bath, upgrd stairs between 1st & 2nd flrs, in-fill @rear on 1st fl. legalize room on garage level/1st floor | $100,000 |