Back to kitchen remodel contractors
Beauty Home Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Oct 2010 to Nov 2018
- Last 24 months
- 0 permits filed
21 permits since 2000: 19 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 9 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2018 | Completed final sign-off Apr 2019 | 5606 California St | revision to pa# 201810183591. remove an interior bearing wall at 3rd floor. between kitchen and dining.Details
revision to pa# 201810183591. remove an interior bearing wall at 3rd floor. between kitchen and dining. | $5,000 |
| Jul 30, 2013 | Completed final sign-off Dec 2015 | 101 Maple St | revision to pa# 2012-0221-4556/s1-modify interior partitins, interior stairs, bathroom & kitchen location. new accessible roof deck. modifications of structural design.Details
revision to pa# 2012-0221-4556/s1-modify interior partitins, interior stairs, bathroom & kitchen location. new accessible roof deck. modifications of structural design. | $90,000 |
| May 2, 2013 | Completed final sign-off Jun 2013 | 700 Moraga St | kitchen remodeling, new cabinets and countertop. bathroom remodel, new tile and fixtures.Details
kitchen remodeling, new cabinets and countertop. bathroom remodel, new tile and fixtures. | $8,000 |
| Jul 18, 2012 | Completed final sign-off May 2013 | 719 18th Av | new stairs between 1st, 2nd, and 3rd flr. removal of kitchenette at 1st flr. removal of wood framed flr at 1st level down to slab. remodel of kitchen and all baths. (e) windows to be replaced. new front doors. trim replaced in kind. new paint. new eye brow roof comply with nov #201169273.Details
new stairs between 1st, 2nd, and 3rd flr. removal of kitchenette at 1st flr. removal of wood framed flr at 1st level down to slab. remodel of kitchen and all baths. (e) windows to be replaced. new front doors. trim replaced in kind. new paint. new eye brow roof comply with nov #201169273. | $140,000 |
| Oct 27, 2011 | Completed final sign-off Feb 2013 | 2975 Lake St | convert basement into habitable space incl windows at front bay & new lightwells remodel kitchen and all bathrooms at upper 2 floors provide roof deck, seismic upgrade of building.Details
convert basement into habitable space incl windows at front bay & new lightwells remodel kitchen and all bathrooms at upper 2 floors provide roof deck, seismic upgrade of building. | $550,000 |
| Sep 22, 2011 | Completed final sign-off Nov 2012 | 1046 Anza St | interior remodel- 1st floor in-fill(128 sq.ft)-(n) family/media room,(n)bedroom,(n)bathroom. 2nd floor- remodel kitchen & (n) half bath,(n) gas insert @ existing fireplace. 3rd floor-enlarge (e) bathroom, remodel(e) bathroom #3, add (n) masterbath, walk-in closet and (n) laundry room.Details
interior remodel- 1st floor in-fill(128 sq.ft)-(n) family/media room,(n)bedroom,(n)bathroom. 2nd floor- remodel kitchen & (n) half bath,(n) gas insert @ existing fireplace. 3rd floor-enlarge (e) bathroom, remodel(e) bathroom #3, add (n) masterbath, walk-in closet and (n) laundry room. | $60,000 |
| Oct 28, 2010 | Completed final sign-off Apr 2011 | 231 12th Av | renovate (e) sfd-repl windows in (e) locations, repair/repl (e) kitchen floor, remodel kitchen, add 1/2 bath, remodel (e) bathrms, add master bath, upgrd stairs between 1st & 2nd flrs, in-fill @rear on 1st fl. legalize room on garage level/1st floorDetails
renovate (e) sfd-repl windows in (e) locations, repair/repl (e) kitchen floor, remodel kitchen, add 1/2 bath, remodel (e) bathrms, add master bath, upgrd stairs between 1st & 2nd flrs, in-fill @rear on 1st fl. legalize room on garage level/1st floor | $100,000 |