Beauty Home Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Oct 2010 to Nov 2018
- Last 24 months
- 0 permits filed
21 permits since 2000: 19 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2018 | Completed final sign-off Apr 2019 | 5606 California St | revision to pa# 201810183591. remove an interior bearing wall at 3rd floor. between kitchen and dining.Details
revision to pa# 201810183591. remove an interior bearing wall at 3rd floor. between kitchen and dining. | $5,000 |
| Nov 9, 2018 | Completed final sign-off Apr 2019 | 5606 California St | replace existing 21 windows existing aluminum, (9)front windows will be replace with fiberglass windows, all (12) back facing windows to be vinyl. all windows replaced within the existing openings in this case.Details
replace existing 21 windows existing aluminum, (9)front windows will be replace with fiberglass windows, all (12) back facing windows to be vinyl. all windows replaced within the existing openings in this case. | $20,000 |
| Mar 31, 2015 | Completed final sign-off Feb 2016 | 3323 Clay St | new retaining walls @ rear yard. maher - not req'dDetails
new retaining walls @ rear yard. maher - not req'd | $10,000 |
| Dec 30, 2013 | Completed final sign-off Oct 2015 | 3323 Clay St | add 3 dormers, replace window with new same size windows in extg location. add egress window as req. repair extg inkind exterior surfaces. install new elevator. 1st floor:1)convert extg unfinished space, storage, mech to a new 2 bdrms/2 bath unit. 2)2nd floor convert rear 2 bedrooms toDetails
add 3 dormers, replace window with new same size windows in extg location. add egress window as req. repair extg inkind exterior surfaces. install new elevator. 1st floor:1)convert extg unfinished space, storage, mech to a new 2 bdrms/2 bath unit. 2)2nd floor convert rear 2 bedrooms to | $350,000 |
| Jul 30, 2013 | Completed final sign-off Dec 2015 | 101 Maple St | revision to pa# 2012-0221-4556/s1-modify interior partitins, interior stairs, bathroom & kitchen location. new accessible roof deck. modifications of structural design.Details
revision to pa# 2012-0221-4556/s1-modify interior partitins, interior stairs, bathroom & kitchen location. new accessible roof deck. modifications of structural design. | $90,000 |
| Jul 29, 2013 | Completed final sign-off Dec 2015 | 101 Maple St | revision to 201202214556. foundation replacement detailsDetails
revision to 201202214556. foundation replacement details | $150,000 |
| Jul 18, 2013 | Completed final sign-off Dec 2015 | 101 Maple St | temporary shoring for (e) pa# 2012-0221-4556-s1Details
temporary shoring for (e) pa# 2012-0221-4556-s1 | |
| May 2, 2013 | Completed final sign-off Jun 2013 | 700 Moraga St | kitchen remodeling, new cabinets and countertop. bathroom remodel, new tile and fixtures.Details
kitchen remodeling, new cabinets and countertop. bathroom remodel, new tile and fixtures. | $8,000 |
| Oct 16, 2012 | Completed final sign-off May 2013 | 719 18th Av | revision to existing on going permit #201207185174. opening up of great room at 2nd & 3rd floors. powder rooms at 2nd & 3rd floor. new windows at rear at 1st floor, relocation of bath at 1st floor. relocation utility room at 1/f.Details
revision to existing on going permit #201207185174. opening up of great room at 2nd & 3rd floors. powder rooms at 2nd & 3rd floor. new windows at rear at 1st floor, relocation of bath at 1st floor. relocation utility room at 1/f. | $20,000 |
| Sep 26, 2012 | Completed final sign-off Jun 2013 | 700 Moraga St | new waterproof membrane. replace concrete slab at existing porch in kindDetails
new waterproof membrane. replace concrete slab at existing porch in kind | $3,000 |
| Jul 18, 2012 | Completed final sign-off May 2013 | 719 18th Av | new stairs between 1st, 2nd, and 3rd flr. removal of kitchenette at 1st flr. removal of wood framed flr at 1st level down to slab. remodel of kitchen and all baths. (e) windows to be replaced. new front doors. trim replaced in kind. new paint. new eye brow roof comply with nov #201169273.Details
new stairs between 1st, 2nd, and 3rd flr. removal of kitchenette at 1st flr. removal of wood framed flr at 1st level down to slab. remodel of kitchen and all baths. (e) windows to be replaced. new front doors. trim replaced in kind. new paint. new eye brow roof comply with nov #201169273. | $140,000 |
| Apr 4, 2012 | Completed final sign-off Jul 2012 | 3200 Buchanan St | new uni-sex, ada compliant toilet added to (e) commercial space, new hair salon related amenities & fixtures.Details
new uni-sex, ada compliant toilet added to (e) commercial space, new hair salon related amenities & fixtures. | $21,700 |
| Jan 25, 2012 | Expired or cancelled expired Feb 2013 | 1020 Union St | extend master bedroom closet up to 84" inside.Details
extend master bedroom closet up to 84" inside. | $1,200 |
| Dec 7, 2011 | Completed final sign-off Jan 2012 | 152 Yerba Buena Av | replace garage door header with new header in kind, same lumber grade.Details
replace garage door header with new header in kind, same lumber grade. | $3,750 |
| Dec 6, 2011 | Completed final sign-off Nov 2012 | 147 14th Av | repair & upgrade (e) rear deck, handrails,guardrails, replace(e) windows w/new same size, in-kind, ext surface finis,1st flr:new fam/media rm, new bedrm, new bath, relocate int. stair. 2nd flr: remodel ktichen & add half bath,gas fireplace insert. 3rd flr: remodel (e)baths, bedrms, add new bath.Details
repair & upgrade (e) rear deck, handrails,guardrails, replace(e) windows w/new same size, in-kind, ext surface finis,1st flr:new fam/media rm, new bedrm, new bath, relocate int. stair. 2nd flr: remodel ktichen & add half bath,gas fireplace insert. 3rd flr: remodel (e)baths, bedrms, add new bath. | $200,000 |
| Oct 27, 2011 | Completed final sign-off Feb 2013 | 2975 Lake St | convert basement into habitable space incl windows at front bay & new lightwells remodel kitchen and all bathrooms at upper 2 floors provide roof deck, seismic upgrade of building.Details
convert basement into habitable space incl windows at front bay & new lightwells remodel kitchen and all bathrooms at upper 2 floors provide roof deck, seismic upgrade of building. | $550,000 |
| Sep 22, 2011 | Completed final sign-off Nov 2012 | 1046 Anza St | interior remodel- 1st floor in-fill(128 sq.ft)-(n) family/media room,(n)bedroom,(n)bathroom. 2nd floor- remodel kitchen & (n) half bath,(n) gas insert @ existing fireplace. 3rd floor-enlarge (e) bathroom, remodel(e) bathroom #3, add (n) masterbath, walk-in closet and (n) laundry room.Details
interior remodel- 1st floor in-fill(128 sq.ft)-(n) family/media room,(n)bedroom,(n)bathroom. 2nd floor- remodel kitchen & (n) half bath,(n) gas insert @ existing fireplace. 3rd floor-enlarge (e) bathroom, remodel(e) bathroom #3, add (n) masterbath, walk-in closet and (n) laundry room. | $60,000 |
| Aug 26, 2011 | Completed final sign-off Nov 2012 | 1046 Anza St | remodel (e) 2nd fl bath. add bedroom on 2nd fl. no work on garage levelDetails
remodel (e) 2nd fl bath. add bedroom on 2nd fl. no work on garage level | $15,000 |
| Jul 19, 2011 | Expired or cancelled expired Jul 2021 | 1600 Lake St | legalize (e) dormers in attic (e).unconditioned and skylights (3) in atticDetails
legalize (e) dormers in attic (e).unconditioned and skylights (3) in attic | $5,000 |
| Jan 21, 2011 | Completed final sign-off Dec 2011 | 132 25th Av | interior remodel on all floors. new foundation for entire building to lower floor. new family/media room bldg infill below (e) 2nd story at rear. convert stor/laundry/study to bedrm,bath; add 1/2 bath; create 2 bedrooms; rebuild balcony.add bay at rear.replace windows in kind.rear stairs,Details
interior remodel on all floors. new foundation for entire building to lower floor. new family/media room bldg infill below (e) 2nd story at rear. convert stor/laundry/study to bedrm,bath; add 1/2 bath; create 2 bedrooms; rebuild balcony.add bay at rear.replace windows in kind.rear stairs, | $200,000 |
| Oct 28, 2010 | Completed final sign-off Apr 2011 | 231 12th Av | renovate (e) sfd-repl windows in (e) locations, repair/repl (e) kitchen floor, remodel kitchen, add 1/2 bath, remodel (e) bathrms, add master bath, upgrd stairs between 1st & 2nd flrs, in-fill @rear on 1st fl. legalize room on garage level/1st floorDetails
renovate (e) sfd-repl windows in (e) locations, repair/repl (e) kitchen floor, remodel kitchen, add 1/2 bath, remodel (e) bathrms, add master bath, upgrd stairs between 1st & 2nd flrs, in-fill @rear on 1st fl. legalize room on garage level/1st floor | $100,000 |