Permit GraphShortlistSan Francisco building permits since 2000

Bayview Renovation & Development, Inc.

Contractor license
1052459
State license record
Based in
San Francisco
On San Francisco permits
Aug 2017 to Aug 2026
Last 24 months
6 permits filed

15 permits since 2000: 9 completed, 6 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllRoof deck 1Deck 1Stairs 3Kitchen remodel 5Bathroom remodel 5

3 stairs permits: 1 completed, 2 in progress. Typically 116 days from filing to permit and 8 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 12, 2025In progress
issued Nov 2025
256 Sweeny St(n) 2-story horizontal addition at rear yard: add a 2 bedrooms, 2 bathrooms state program adu with family room, kitchen and deck. on the 2nd level remodel 2 bedrooms and 1 bathroom,add garage, staircase and deck. no exterior work visible from street.
Details
Permit
202506118403
Status
issued
Filed
Jul 12, 2025
Permit issued
Nov 5, 2025
Declared cost
$150,000
Address
256 Sweeny St

(n) 2-story horizontal addition at rear yard: add a 2 bedrooms, 2 bathrooms state program adu with family room, kitchen and deck. on the 2nd level remodel 2 bedrooms and 1 bathroom,add garage, staircase and deck. no exterior work visible from street.

Open the permit page

$150,000
Jan 29, 2024Completed
final sign-off Feb 2024
67 Prentiss Stcomplying with nov# 202309309, permit to document demolition of an existing non-conforming stair in the rear yard.
Details
Permit
202401294820
Status
complete
Filed
Jan 29, 2024
Permit issued
Feb 6, 2024
Final sign-off
Feb 14, 2024
Declared cost
$4,250
Address
67 Prentiss St

complying with nov# 202309309, permit to document demolition of an existing non-conforming stair in the rear yard.

Open the permit page

$4,250
Aug 17, 2021In progress
issued Aug 2024
260 Theresa Stunit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndw
Details
Permit
202108176601
Status
reinstated
Filed
Aug 17, 2021
Permit issued
Aug 7, 2024
Final sign-off
Jul 14, 2026
Declared cost
$100,000
Address
260 Theresa St

unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndw

Open the permit page

$100,000