Bayview Renovation & Development, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Aug 2026
- Last 24 months
- 6 permits filed
15 permits since 2000: 9 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 in progress. Typically 1086 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2021 | In progress issued Aug 2024 | 260 Theresa St | unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndwDetails
unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndw | $100,000 |