15 permits since 2000: 9 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 in progress. Typically 15 days from filing to permit and 283 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Aug 2026 | 256 Sweeny St | revision to permit 202506118403. change 2nd floor walk-in closet to full bath. non-structural interior work only.Details
revision to permit 202506118403. change 2nd floor walk-in closet to full bath. non-structural interior work only. | $22,000 |
| Jul 12, 2025 | In progress issued Nov 2025 | 256 Sweeny St | (n) 2-story horizontal addition at rear yard: add a 2 bedrooms, 2 bathrooms state program adu with family room, kitchen and deck. on the 2nd level remodel 2 bedrooms and 1 bathroom,add garage, staircase and deck. no exterior work visible from street.Details
(n) 2-story horizontal addition at rear yard: add a 2 bedrooms, 2 bathrooms state program adu with family room, kitchen and deck. on the 2nd level remodel 2 bedrooms and 1 bathroom,add garage, staircase and deck. no exterior work visible from street. | $150,000 |
| Oct 30, 2024 | Completed final sign-off Nov 2025 | 258 Richland Av | remodel e) pantry/laundry/half bath at 2nd fl bump-out in the rear yard. n) windows at rear not visible from st. no expansion of bldg envelopeDetails
remodel e) pantry/laundry/half bath at 2nd fl bump-out in the rear yard. n) windows at rear not visible from st. no expansion of bldg envelope | $75,000 |
| Oct 25, 2023 | Completed final sign-off Aug 2024 | 287 Yerba Buena Av | provide wheelchair accessibility and develop ground floor access rooms - include 2 bedrooms, 1 bath, 1 multipurpose room, kitchenette, laundry and closets. extend (e) column and perimeter footings. reinfornce (e) footings as needed. add grade beams as needed. relocate (e) furance. replace w/h with..Details
provide wheelchair accessibility and develop ground floor access rooms - include 2 bedrooms, 1 bath, 1 multipurpose room, kitchenette, laundry and closets. extend (e) column and perimeter footings. reinfornce (e) footings as needed. add grade beams as needed. relocate (e) furance. replace w/h with.. | $189,366 |
| Jun 20, 2019 | Completed final sign-off Oct 2019 | 1430 Silliman St | 1) renovate kitchen & bathroom in kind (approx) 40 sqft & 120 sqft) 2) replace sheetrock in kind on 2nd level of house. 3) replace two rear windows in kind on 2nd level of house 4) replace furnace in kind, new ducts for 2nd level of house.Details
1) renovate kitchen & bathroom in kind (approx) 40 sqft & 120 sqft) 2) replace sheetrock in kind on 2nd level of house. 3) replace two rear windows in kind on 2nd level of house 4) replace furnace in kind, new ducts for 2nd level of house. | $42,000 |