Bayside Builders Group Inc
- Based in
- Alameda
- On San Francisco permits
- Dec 2021 to Sep 2026
- Last 24 months
- 23 permits filed
50 permits since 2000: 40 completed, 5 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 7 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2026 | Completed final sign-off Jul 2026 | 124 Panorama Dr | replace existing tiles and waterproof front stairs, less than 50% repairs. street facing.Details
replace existing tiles and waterproof front stairs, less than 50% repairs. street facing. | $3,000 |
| Sep 6, 2024 | In progress issued Sep 2024 | 2238 46th Av | rip and replace front stairs to entry. replace conc. treads in kind no structural work.Details
rip and replace front stairs to entry. replace conc. treads in kind no structural work. | $20,000 |
| Dec 14, 2023 | Completed final sign-off Dec 2024 | 179 Concord St | replace extg front stair like for like. no variances or notice is requried as this is the demo and reconstruction of the front required means of egress in this case. per za bulletin no 4.Details
replace extg front stair like for like. no variances or notice is requried as this is the demo and reconstruction of the front required means of egress in this case. per za bulletin no 4. | $24,000 |