Back to kitchen remodel contractors
Bayside Builders Group Inc
- Based in
- Alameda
- On San Francisco permits
- Dec 2021 to Sep 2026
- Last 24 months
- 23 permits filed
50 permits since 2000: 40 completed, 5 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 in progress. Typically 0 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress issued Jun 2026 | 12 Mabrey Ct | kitchen remodel like for like, no structural changes, replace cabinets, countertops, fixtures, appliances and upgrade mep to code as needed, replace stove, hood range fan/vent (120 sq ft)Details
kitchen remodel like for like, no structural changes, replace cabinets, countertops, fixtures, appliances and upgrade mep to code as needed, replace stove, hood range fan/vent (120 sq ft) | $26,000 |
| Aug 15, 2025 | Completed final sign-off Apr 2026 | 638 Edinburgh St | kitchen remodel like for like no structual changes. 150 sq ft. 3 window being replaced. 1 window street facing. all vinyl windows. front window replaced with vinyl picture/fixed.Details
kitchen remodel like for like no structual changes. 150 sq ft. 3 window being replaced. 1 window street facing. all vinyl windows. front window replaced with vinyl picture/fixed. | $20,000 |
| Dec 20, 2024 | Completed final sign-off Sep 2025 | 163 Paris St | kitchen remodel like for like rip and replace demo 2 non bearing walls,Details
kitchen remodel like for like rip and replace demo 2 non bearing walls, | $25,000 |
| Apr 4, 2024 | Completed final sign-off Jun 2024 | 570 Page St | unit#4: kitchen remodel.Details
unit#4: kitchen remodel. | $30,000 |
| Oct 11, 2022 | Completed final sign-off May 2023 | 1001 Pine St | unit #1305: 1 kitchen remodel like for like. 1 bathroom remodel like for like. plus floors. no removal of wallsDetails
unit #1305: 1 kitchen remodel like for like. 1 bathroom remodel like for like. plus floors. no removal of walls | $22,000 |
| Sep 19, 2022 | Completed final sign-off Apr 2024 | 62 Mullen Av | bathroom remodel and kitchen remodel/like for like. non-structuralDetails
bathroom remodel and kitchen remodel/like for like. non-structural | $30,000 |