Back to bathroom remodel contractors
Bayside Builders Group Inc
- Based in
- Alameda
- On San Francisco permits
- Dec 2021 to Sep 2026
- Last 24 months
- 23 permits filed
50 permits since 2000: 40 completed, 5 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 17 completed, 2 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Aug 2026 | 3468 16th St | partial bathroom remodel in kind - convert tub to shower, no change to vanity or toilet, no layout change. no curbless shower. no chang to floor layout. no change to wall layout. no structural work.Details
partial bathroom remodel in kind - convert tub to shower, no change to vanity or toilet, no layout change. no curbless shower. no chang to floor layout. no change to wall layout. no structural work. | $10,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 1 Topaz Wy | replace only the bath tub in the guest bathroom (bathtub to bathtub), replace (e) fan upgrade m-e-p as needed to code.Details
replace only the bath tub in the guest bathroom (bathtub to bathtub), replace (e) fan upgrade m-e-p as needed to code. | $8,000 |
| Jun 22, 2026 | Expired or cancelled cancelled Jul 2026 | 1 Topaz Wy | remodel bathroom, change out counter top. upgrade house electrical.Details
remodel bathroom, change out counter top. upgrade house electrical. | $41,000 |
| Feb 27, 2026 | Completed final sign-off Sep 2026 | 2750 Market St | apt 302: full bathroom remodel. convert tub to shower. replace toilet, sink, vanity, fan. upgrade mep to code. add washer and dryer behind shower wall in hallway closet.Details
apt 302: full bathroom remodel. convert tub to shower. replace toilet, sink, vanity, fan. upgrade mep to code. add washer and dryer behind shower wall in hallway closet. | $20,000 |
| Oct 24, 2025 | Completed final sign-off Apr 2026 | 220 Lombard St | unit #118: bathroom remodel like for like no structural. changes 52sqft. showerDetails
unit #118: bathroom remodel like for like no structural. changes 52sqft. shower | $13,000 |
| Jun 10, 2025 | Completed final sign-off Jul 2025 | 1624 Filbert St | apt 3: bathroom remodel. like for like. 42sq ftDetails
apt 3: bathroom remodel. like for like. 42sq ft | $25,000 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 121 Fair Oaks St | remodel the (e) common bathroom to add enclosed washer and dryer relocate existing door a per planDetails
remodel the (e) common bathroom to add enclosed washer and dryer relocate existing door a per plan | $30,000 |
| Mar 6, 2025 | Completed final sign-off May 2025 | 768 Church St | unit #4: bathroom remodeling including the change of a tub to walking shower, 35 sqft.Details
unit #4: bathroom remodeling including the change of a tub to walking shower, 35 sqft. | $25,000 |
| Mar 6, 2025 | Completed final sign-off Sep 2025 | 638 Edinburgh St | bathroom remodel like for like 56 sqft.Details
bathroom remodel like for like 56 sqft. | $30,000 |
| Nov 27, 2024 | Completed final sign-off Feb 2025 | 163 Paris St | 1 bathroom remodel like for like, convert tub to shower (same location).Details
1 bathroom remodel like for like, convert tub to shower (same location). | $30,000 |
| Oct 25, 2024 | Completed final sign-off Mar 2025 | 1628 Page St | non-structural interior remodel to (e) half bath. adding 1 shower. replace toilet. replace sink.Details
non-structural interior remodel to (e) half bath. adding 1 shower. replace toilet. replace sink. | $25,000 |
| Jul 18, 2024 | Completed final sign-off Jul 2024 | 165 Shakespeare St | vinly sliding door at the back of the house. vinyl sliding door at the back 2nd floor. vinyl window guest bathroom. vinyl window side of the house facing the neighbor. u=0.3 max. all are replacement with same size same location of original. all items not visible from streetDetails
vinly sliding door at the back of the house. vinyl sliding door at the back 2nd floor. vinyl window guest bathroom. vinyl window side of the house facing the neighbor. u=0.3 max. all are replacement with same size same location of original. all items not visible from street | $20,000 |
| Jun 27, 2024 | Completed final sign-off Sep 2024 | 165 Shakespeare St | 2 bathrooms remodel, like for like. appox 100 sq feet totalDetails
2 bathrooms remodel, like for like. appox 100 sq feet total | $30,000 |
| Apr 4, 2024 | Completed final sign-off Sep 2024 | 2238 46th Av | master bathroom remodel. relocate toilet, shower and vanity. update mep as needed. new tub, 4 new can lights.Details
master bathroom remodel. relocate toilet, shower and vanity. update mep as needed. new tub, 4 new can lights. | $25,000 |
| Aug 1, 2023 | Never finaled issued Aug 2023, no final | 345 Upper Tr | bathroom remodel, like for like. install new vanity. install new tiling. install new fixtures.Details
bathroom remodel, like for like. install new vanity. install new tiling. install new fixtures. | $15,000 |
| Jun 27, 2023 | Completed final sign-off Dec 2023 | 81 Frank Norris St | remodel (1) bathroom like for like 60 sq ft. replace tub, vanity, plumbing fixtures and 5 new recessed lights. lighting shall comply with cec 150.0(k).Details
remodel (1) bathroom like for like 60 sq ft. replace tub, vanity, plumbing fixtures and 5 new recessed lights. lighting shall comply with cec 150.0(k). | $15,000 |
| Jan 17, 2023 | Completed final sign-off Feb 2023 | 447 Nevada St | remove (e) bath tub and build shower.Details
remove (e) bath tub and build shower. | $10,000 |
| Dec 7, 2022 | Completed final sign-off Jul 2023 | 550 South Van Ness Av | unit #103: bathroom remodel like for like. tub to walk-in shower.Details
unit #103: bathroom remodel like for like. tub to walk-in shower. | $11,000 |
| Oct 11, 2022 | Completed final sign-off May 2023 | 1001 Pine St | unit #1305: 1 kitchen remodel like for like. 1 bathroom remodel like for like. plus floors. no removal of wallsDetails
unit #1305: 1 kitchen remodel like for like. 1 bathroom remodel like for like. plus floors. no removal of walls | $22,000 |
| Sep 19, 2022 | Completed final sign-off Apr 2024 | 62 Mullen Av | bathroom remodel and kitchen remodel/like for like. non-structuralDetails
bathroom remodel and kitchen remodel/like for like. non-structural | $30,000 |
| Sep 19, 2022 | Never finaled issued Sep 2022, no final | 60 Rausch St | unit 208: master bathroom remodel like for like, adding 2 recessed lights.Details
unit 208: master bathroom remodel like for like, adding 2 recessed lights. | $12,000 |
| Sep 13, 2022 | Completed final sign-off Nov 2022 | 5549 Anza St | 1 bathroom like for like. replace plumbing. fixtures, update electrical up to code, 2 new r.l. new shower, and replace fan.Details
1 bathroom like for like. replace plumbing. fixtures, update electrical up to code, 2 new r.l. new shower, and replace fan. | $16,000 |
| May 27, 2022 | Expired or cancelled cancelled Oct 2022 | 338 Spear St | bathroom remodel like for like. replacing all plumbing fixtures, convert tub to shower. update e/m/p up to code, replace light.Details
bathroom remodel like for like. replacing all plumbing fixtures, convert tub to shower. update e/m/p up to code, replace light. | $15,000 |