Bayshore Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2007 to Nov 2021
- Last 24 months
- 0 permits filed
31 permits since 2000: 30 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 1 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2015 | Completed final sign-off Sep 2016 | 572 Rhode Island St | replace approx. 250 square feet of roof deck at the rear of the house. reroute exposed plumbing. replace inkind all front amd rear windows sashes and exteriuor doors. replace furnes, ducts, flue including electrial ciruit. repair in kind (less than 50 percent) front concrete stairs. repair interiorDetails
replace approx. 250 square feet of roof deck at the rear of the house. reroute exposed plumbing. replace inkind all front amd rear windows sashes and exteriuor doors. replace furnes, ducts, flue including electrial ciruit. repair in kind (less than 50 percent) front concrete stairs. repair interior | $20,000 |
| Apr 15, 2013 | Completed final sign-off Oct 2015 | 17 Coleridge St | replace existing 2nd level rear deck & stairs w/ new smaller deck and metal spiral stairs. 1st fl; replace (e) bath tub & lavatory, replace water tank w/ tank less heater.2nd fl; kitchen & bath remodel, replace water tank w/ tank less heater. 3rd fl; bathroom remodel & 3 replace in kind windows.Details
replace existing 2nd level rear deck & stairs w/ new smaller deck and metal spiral stairs. 1st fl; replace (e) bath tub & lavatory, replace water tank w/ tank less heater.2nd fl; kitchen & bath remodel, replace water tank w/ tank less heater. 3rd fl; bathroom remodel & 3 replace in kind windows. | $98,000 |
| Nov 30, 2011 | Completed final sign-off Dec 2011 | 1767 Alabama St | comply with nov# 201171093-correct items on violation notice dated 11/15/11-replace deck & stairs, install front entry light (basement hall), replace damaged floor tiles.Details
comply with nov# 201171093-correct items on violation notice dated 11/15/11-replace deck & stairs, install front entry light (basement hall), replace damaged floor tiles. | $3,500 |
| Feb 4, 2010 | Completed final sign-off Mar 2010 | 45 South Park | to comply with dbi nov 201031482 & 201031476. repair stairs in-kind, provide handrails at rear stairs, repair exterior siding, remove damaged lead paint, remove exterior wood utility ladder at rear.Details
to comply with dbi nov 201031482 & 201031476. repair stairs in-kind, provide handrails at rear stairs, repair exterior siding, remove damaged lead paint, remove exterior wood utility ladder at rear. | $15,750 |