Back to bathroom remodel contractors
Bayshore Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2007 to Nov 2021
- Last 24 months
- 0 permits filed
31 permits since 2000: 30 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2019 | Completed final sign-off Jul 2019 | 1082 De Haro St | 3 bathroom remodels, new plumbing fixtures, and lighting. no bearing walls to be removed. no additional fixtures count.Details
3 bathroom remodels, new plumbing fixtures, and lighting. no bearing walls to be removed. no additional fixtures count. | $30,000 |
| Jul 19, 2013 | Completed final sign-off Sep 2013 | 1769 Alabama St | bathroom remodel - install new shower, vanity, toilet. install new pocket door. remove one window. install new flooring. install new fan/lightDetails
bathroom remodel - install new shower, vanity, toilet. install new pocket door. remove one window. install new flooring. install new fan/light | $11,000 |
| Apr 15, 2013 | Completed final sign-off Oct 2015 | 17 Coleridge St | replace existing 2nd level rear deck & stairs w/ new smaller deck and metal spiral stairs. 1st fl; replace (e) bath tub & lavatory, replace water tank w/ tank less heater.2nd fl; kitchen & bath remodel, replace water tank w/ tank less heater. 3rd fl; bathroom remodel & 3 replace in kind windows.Details
replace existing 2nd level rear deck & stairs w/ new smaller deck and metal spiral stairs. 1st fl; replace (e) bath tub & lavatory, replace water tank w/ tank less heater.2nd fl; kitchen & bath remodel, replace water tank w/ tank less heater. 3rd fl; bathroom remodel & 3 replace in kind windows. | $98,000 |
| Apr 1, 2011 | Completed final sign-off May 2011 | 143 Peralta Av | convert pantry to half bath at first floor: install toilet, sink, move door, relocate light switch and install new light switch, gfci.Details
convert pantry to half bath at first floor: install toilet, sink, move door, relocate light switch and install new light switch, gfci. | $11,000 |
| Sep 17, 2010 | Completed final sign-off Dec 2010 | 5 Peters Av | remodel (e) kiotchen and bath incl. cabinets, counter tops, appliances, finishes, new insulation at ext.walls. new high efficency lighting. enclosure of (e) exposed piupe @ laundr rm. no struc. work. no ext work, no change to bldg size,perimeter , hgt or elevDetails
remodel (e) kiotchen and bath incl. cabinets, counter tops, appliances, finishes, new insulation at ext.walls. new high efficency lighting. enclosure of (e) exposed piupe @ laundr rm. no struc. work. no ext work, no change to bldg size,perimeter , hgt or elev | $35,000 |
| Jan 11, 2008 | Completed final sign-off Apr 2008 | 1770 Revere Av | install 2 new solatubes in kithcen and bath. flat roof, top of solatubes does not exceed 12" above roof level.Details
install 2 new solatubes in kithcen and bath. flat roof, top of solatubes does not exceed 12" above roof level. | $1,000 |
| May 8, 2007 | Completed final sign-off Oct 2007 | 47 South Park | kitchen remodel:new cabinetry, flooring, electrical upgrade throughout. relocate water heater. new kichn sink, bath vanity.repair plaster walls and ceiling. hardwood floor 2 rooms, hallDetails
kitchen remodel:new cabinetry, flooring, electrical upgrade throughout. relocate water heater. new kichn sink, bath vanity.repair plaster walls and ceiling. hardwood floor 2 rooms, hall | $50,000 |
| Jan 19, 2007 | Completed final sign-off Mar 2007 | 47 Powers Av | bathroom remodel - dryrot repair as necessary, replace sheetrock. replace dloor sheathing. no structural work. ( 47 powers only. )Details
bathroom remodel - dryrot repair as necessary, replace sheetrock. replace dloor sheathing. no structural work. ( 47 powers only. ) | $4,500 |