Back to kitchen remodel contractors
Bayshore Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2007 to Nov 2021
- Last 24 months
- 0 permits filed
31 permits since 2000: 30 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2016 | Completed final sign-off Oct 2016 | 501 Oak St | apt. # 7: kitchen remodel: replace cabinets and countertop in same layout. electrical upgrade, inc new lighting,new subpanel. patch drywall. maintain continunity of fire graded horizontal assembley at ceiling. no walls moved, removed, added or infilled. all existing layouts to remain.Details
apt. # 7: kitchen remodel: replace cabinets and countertop in same layout. electrical upgrade, inc new lighting,new subpanel. patch drywall. maintain continunity of fire graded horizontal assembley at ceiling. no walls moved, removed, added or infilled. all existing layouts to remain. | $15,000 |
| Oct 31, 2014 | Completed final sign-off Mar 2015 | 315 16th Av | kitchen remodel_ new cabinets, flooring, electrical/lighting and plumbing fixtures, new appliances. widened door opening btwn kitchen and dining room.Details
kitchen remodel_ new cabinets, flooring, electrical/lighting and plumbing fixtures, new appliances. widened door opening btwn kitchen and dining room. | $50,000 |
| May 6, 2013 | Completed final sign-off Jun 2013 | 44 Powers Av | remove post in kitchen area, install steel c channel, screwed to existing wood beam, pour new concrete footings under (2) existing postsDetails
remove post in kitchen area, install steel c channel, screwed to existing wood beam, pour new concrete footings under (2) existing posts | $6,000 |
| Apr 15, 2013 | Completed final sign-off Oct 2015 | 17 Coleridge St | replace existing 2nd level rear deck & stairs w/ new smaller deck and metal spiral stairs. 1st fl; replace (e) bath tub & lavatory, replace water tank w/ tank less heater.2nd fl; kitchen & bath remodel, replace water tank w/ tank less heater. 3rd fl; bathroom remodel & 3 replace in kind windows.Details
replace existing 2nd level rear deck & stairs w/ new smaller deck and metal spiral stairs. 1st fl; replace (e) bath tub & lavatory, replace water tank w/ tank less heater.2nd fl; kitchen & bath remodel, replace water tank w/ tank less heater. 3rd fl; bathroom remodel & 3 replace in kind windows. | $98,000 |
| May 8, 2007 | Completed final sign-off Oct 2007 | 47 South Park | kitchen remodel:new cabinetry, flooring, electrical upgrade throughout. relocate water heater. new kichn sink, bath vanity.repair plaster walls and ceiling. hardwood floor 2 rooms, hallDetails
kitchen remodel:new cabinetry, flooring, electrical upgrade throughout. relocate water heater. new kichn sink, bath vanity.repair plaster walls and ceiling. hardwood floor 2 rooms, hall | $50,000 |