Bay Building Structures Inc
- Based in
- Foster City
- On San Francisco permits
- Jan 2014 to Aug 2026
- Last 24 months
- 9 permits filed
58 permits since 2000: 39 completed, 5 in progress, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 82 days from filing to permit and 676 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2022 | Expired or cancelled expired Jul 2025 | 1021 Noe St | rotate rear egress stair 90 degree at lowest lv to match (e) footprint. upgrade rear foundation of 4-sty structure & stair/deck post. (n) rear landscaping retaining wall/stairs infill under (e) rear popout structure.Details
rotate rear egress stair 90 degree at lowest lv to match (e) footprint. upgrade rear foundation of 4-sty structure & stair/deck post. (n) rear landscaping retaining wall/stairs infill under (e) rear popout structure. | $72,000 |
| Nov 27, 2019 | Completed final sign-off Dec 2021 | 4277 23rd St | renovation of sfd cottage at rear of lot. not visible from street. remove rear stair bulkhead and removal of exterior wood stair at rear. new exterior doors to match (e). new kitchen, 2 new baths, 1 new powder rm. relocate interior stair. seismic upgrades throughout.Details
renovation of sfd cottage at rear of lot. not visible from street. remove rear stair bulkhead and removal of exterior wood stair at rear. new exterior doors to match (e). new kitchen, 2 new baths, 1 new powder rm. relocate interior stair. seismic upgrades throughout. | $140,000 |
| Jun 11, 2018 | Completed final sign-off Sep 2021 | 328 Eureka St | legalize (e) attic as habitable space for bedrooms & bath. add dormers @ roof. create new stair to attic, remodel kitchen area, open kitchen to living room @ 2nd flDetails
legalize (e) attic as habitable space for bedrooms & bath. add dormers @ roof. create new stair to attic, remodel kitchen area, open kitchen to living room @ 2nd fl | $117,000 |
| Aug 16, 2017 | Completed final sign-off Jan 2019 | 2320 Bryant St | replace extg foundation. reconfigure extg interior stair between levels. convert extg 693 sq ft at garage level to conditioned space. add 1 bathroom and add 1 bedroom.Details
replace extg foundation. reconfigure extg interior stair between levels. convert extg 693 sq ft at garage level to conditioned space. add 1 bathroom and add 1 bedroom. | $80,000 |
| Mar 16, 2016 | Completed final sign-off Jul 2018 | 1612 Castro St | revision to 2015 0918 7465 to include new roof hatch and roof deck per ab-0057, add stair to new roof deck. adjust kitchen location.Details
revision to 2015 0918 7465 to include new roof hatch and roof deck per ab-0057, add stair to new roof deck. adjust kitchen location. | $50,000 |
| Mar 12, 2015 | Completed final sign-off Jul 2018 | 1612 Castro St | reloc 2/fl unit to gr fl.new kitchen,2 full baths,new entry door. connect garage to 2nd story.remodel kitchen at 2nd story,remove bath,add powder room,remove partition at stair.connect 2nd&3rd story.remodel bath at 3rd story,create new mstr bedrm&bath,new windows at rear,new skylite,remove kitchen.Details
reloc 2/fl unit to gr fl.new kitchen,2 full baths,new entry door. connect garage to 2nd story.remodel kitchen at 2nd story,remove bath,add powder room,remove partition at stair.connect 2nd&3rd story.remodel bath at 3rd story,create new mstr bedrm&bath,new windows at rear,new skylite,remove kitchen. | $233,000 |
| Mar 25, 2014 | Never finaled issued Jul 2014, no final | 75 Buena Vista Tr | add condition space @ (e) basement within (e) envelope includes excavation, full bath, (n) int. stair connecting 1/f to basement, remodel kitchen, strl upgrades, repair (e) deck & ext. stair @ north property line to comply with nov#201300439. add operable skylt, stair and new roof deck onDetails
add condition space @ (e) basement within (e) envelope includes excavation, full bath, (n) int. stair connecting 1/f to basement, remodel kitchen, strl upgrades, repair (e) deck & ext. stair @ north property line to comply with nov#201300439. add operable skylt, stair and new roof deck on | $138,000 |
| Jan 8, 2014 | Completed final sign-off Jun 2015 | 2324 19th St | revision to app#201006184828 to add stair to upper roof and create new roof top deck.Details
revision to app#201006184828 to add stair to upper roof and create new roof top deck. | $15,000 |