Permit GraphShortlistSan Francisco building permits since 2000

Bay Building Structures Inc

Contractor license
833066
State license record
Based in
Foster City
On San Francisco permits
Jan 2014 to Aug 2026
Last 24 months
9 permits filed

58 permits since 2000: 39 completed, 5 in progress, 9 never finaled, 5 expired or cancelled.

Of the 9 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllRoof deck 4Deck 6Stairs 8Kitchen remodel 22Bathroom remodel 21

8 stairs permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 82 days from filing to permit and 676 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 31, 2022Expired or cancelled
expired Jul 2025
1021 Noe Strotate rear egress stair 90 degree at lowest lv to match (e) footprint. upgrade rear foundation of 4-sty structure & stair/deck post. (n) rear landscaping retaining wall/stairs infill under (e) rear popout structure.
Details
Permit
202203311265
Status
expired
Filed
Mar 31, 2022
Permit issued
Apr 14, 2022
Declared cost
$72,000
Address
1021 Noe St

rotate rear egress stair 90 degree at lowest lv to match (e) footprint. upgrade rear foundation of 4-sty structure & stair/deck post. (n) rear landscaping retaining wall/stairs infill under (e) rear popout structure.

Open the permit page

$72,000
Nov 27, 2019Completed
final sign-off Dec 2021
4277 23rd Strenovation of sfd cottage at rear of lot. not visible from street. remove rear stair bulkhead and removal of exterior wood stair at rear. new exterior doors to match (e). new kitchen, 2 new baths, 1 new powder rm. relocate interior stair. seismic upgrades throughout.
Details
Permit
201911278345
Status
complete
Filed
Nov 27, 2019
Permit issued
Oct 29, 2020
Final sign-off
Dec 10, 2021
Declared cost
$140,000
Address
4277 23rd St

renovation of sfd cottage at rear of lot. not visible from street. remove rear stair bulkhead and removal of exterior wood stair at rear. new exterior doors to match (e). new kitchen, 2 new baths, 1 new powder rm. relocate interior stair. seismic upgrades throughout.

Open the permit page

$140,000
Jun 11, 2018Completed
final sign-off Sep 2021
328 Eureka Stlegalize (e) attic as habitable space for bedrooms & bath. add dormers @ roof. create new stair to attic, remodel kitchen area, open kitchen to living room @ 2nd fl
Details
Permit
201806111461
Status
complete
Filed
Jun 11, 2018
Permit issued
Aug 2, 2018
Final sign-off
Sep 14, 2021
Declared cost
$117,000
Address
328 Eureka St

legalize (e) attic as habitable space for bedrooms & bath. add dormers @ roof. create new stair to attic, remodel kitchen area, open kitchen to living room @ 2nd fl

Open the permit page

$117,000
Aug 16, 2017Completed
final sign-off Jan 2019
2320 Bryant Streplace extg foundation. reconfigure extg interior stair between levels. convert extg 693 sq ft at garage level to conditioned space. add 1 bathroom and add 1 bedroom.
Details
Permit
201708165040
Status
complete
Filed
Aug 16, 2017
Permit issued
Sep 1, 2017
Final sign-off
Jan 14, 2019
Declared cost
$80,000
Address
2320 Bryant St

replace extg foundation. reconfigure extg interior stair between levels. convert extg 693 sq ft at garage level to conditioned space. add 1 bathroom and add 1 bedroom.

Open the permit page

$80,000
Mar 16, 2016Completed
final sign-off Jul 2018
1612 Castro Strevision to 2015 0918 7465 to include new roof hatch and roof deck per ab-0057, add stair to new roof deck. adjust kitchen location.
Details
Permit
201603162179
Status
complete
Filed
Mar 16, 2016
Permit issued
Mar 24, 2016
Final sign-off
Jul 24, 2018
Declared cost
$50,000
Address
1612 Castro St

revision to 2015 0918 7465 to include new roof hatch and roof deck per ab-0057, add stair to new roof deck. adjust kitchen location.

Open the permit page

$50,000
Mar 12, 2015Completed
final sign-off Jul 2018
1612 Castro Streloc 2/fl unit to gr fl.new kitchen,2 full baths,new entry door. connect garage to 2nd story.remodel kitchen at 2nd story,remove bath,add powder room,remove partition at stair.connect 2nd&3rd story.remodel bath at 3rd story,create new mstr bedrm&bath,new windows at rear,new skylite,remove kitchen.
Details
Permit
201503120715
Status
complete
Filed
Mar 12, 2015
Permit issued
Jul 1, 2015
Final sign-off
Jul 24, 2018
Declared cost
$233,000
Address
1612 Castro St

reloc 2/fl unit to gr fl.new kitchen,2 full baths,new entry door. connect garage to 2nd story.remodel kitchen at 2nd story,remove bath,add powder room,remove partition at stair.connect 2nd&3rd story.remodel bath at 3rd story,create new mstr bedrm&bath,new windows at rear,new skylite,remove kitchen.

Open the permit page

$233,000
Mar 25, 2014Never finaled
issued Jul 2014, no final
75 Buena Vista Tradd condition space @ (e) basement within (e) envelope includes excavation, full bath, (n) int. stair connecting 1/f to basement, remodel kitchen, strl upgrades, repair (e) deck & ext. stair @ north property line to comply with nov#201300439. add operable skylt, stair and new roof deck on
Details
Permit
201403251602
Status
issued
Filed
Mar 25, 2014
Permit issued
Jul 29, 2014
Declared cost
$138,000
Address
75 Buena Vista Tr

add condition space @ (e) basement within (e) envelope includes excavation, full bath, (n) int. stair connecting 1/f to basement, remodel kitchen, strl upgrades, repair (e) deck & ext. stair @ north property line to comply with nov#201300439. add operable skylt, stair and new roof deck on

Open the permit page

$138,000
Jan 8, 2014Completed
final sign-off Jun 2015
2324 19th Strevision to app#201006184828 to add stair to upper roof and create new roof top deck.
Details
Permit
201401085813
Status
complete
Filed
Jan 8, 2014
Permit issued
Jun 16, 2014
Final sign-off
Jun 11, 2015
Declared cost
$15,000
Address
2324 19th St

revision to app#201006184828 to add stair to upper roof and create new roof top deck.

Open the permit page

$15,000