Bay Building Structures Inc
- Based in
- Foster City
- On San Francisco permits
- Jan 2014 to Aug 2026
- Last 24 months
- 9 permits filed
58 permits since 2000: 39 completed, 5 in progress, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 3 completed, 1 never finaled, 2 expired or cancelled. Typically 133 days from filing to permit and 1011 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2022 | Expired or cancelled expired Jul 2025 | 1021 Noe St | rotate rear egress stair 90 degree at lowest lv to match (e) footprint. upgrade rear foundation of 4-sty structure & stair/deck post. (n) rear landscaping retaining wall/stairs infill under (e) rear popout structure.Details
rotate rear egress stair 90 degree at lowest lv to match (e) footprint. upgrade rear foundation of 4-sty structure & stair/deck post. (n) rear landscaping retaining wall/stairs infill under (e) rear popout structure. | $72,000 |
| May 4, 2018 | Completed final sign-off Mar 2022 | 55 Gates St | interior remodel of (e) 2-story single family res. remodel of kitchen & bathroom @ 2nd flr & new 3rd story add. street facing facade will include (n) windows @ 2nd & 3rd flrs (@rear also.) all exterior facades to be refinished. new green roofs & deck to be incorporated @ front of house & upper roof.Details
interior remodel of (e) 2-story single family res. remodel of kitchen & bathroom @ 2nd flr & new 3rd story add. street facing facade will include (n) windows @ 2nd & 3rd flrs (@rear also.) all exterior facades to be refinished. new green roofs & deck to be incorporated @ front of house & upper roof. | $250,000 |
| May 5, 2017 | Completed final sign-off Feb 2020 | 54 Naples St | revise permit 2014-0725-2175/r1 to clarify framing at cantilever deck per request of field inspector to comply with nov#201467981Details
revise permit 2014-0725-2175/r1 to clarify framing at cantilever deck per request of field inspector to comply with nov#201467981 | |
| Aug 11, 2016 | Completed final sign-off Sep 2020 | 1531 06th Av | renovate (e) dwelling, remodel (e) kitchen and bathroom, (n) foundation, (n) lower level family room, deck at grade, (n) windows and doorsDetails
renovate (e) dwelling, remodel (e) kitchen and bathroom, (n) foundation, (n) lower level family room, deck at grade, (n) windows and doors | $220,000 |
| Jul 25, 2014 | Expired or cancelled expired Feb 2020 | 54 Naples St | unit legalization per ordinance 43-14. comply with nov 201467981. rebuild in kind rear deck with pressure-treated lumber. install carbon monoxide and smoke detector alram in sleeping room and hallway at 1st and 2nd fl. install new kitchen at 1st floor per plan.Details
unit legalization per ordinance 43-14. comply with nov 201467981. rebuild in kind rear deck with pressure-treated lumber. install carbon monoxide and smoke detector alram in sleeping room and hallway at 1st and 2nd fl. install new kitchen at 1st floor per plan. | $10,000 |
| Mar 25, 2014 | Never finaled issued Jul 2014, no final | 75 Buena Vista Tr | add condition space @ (e) basement within (e) envelope includes excavation, full bath, (n) int. stair connecting 1/f to basement, remodel kitchen, strl upgrades, repair (e) deck & ext. stair @ north property line to comply with nov#201300439. add operable skylt, stair and new roof deck onDetails
add condition space @ (e) basement within (e) envelope includes excavation, full bath, (n) int. stair connecting 1/f to basement, remodel kitchen, strl upgrades, repair (e) deck & ext. stair @ north property line to comply with nov#201300439. add operable skylt, stair and new roof deck on | $138,000 |