Bay Building Structures Inc
- Based in
- Foster City
- On San Francisco permits
- Jan 2014 to Aug 2026
- Last 24 months
- 9 permits filed
58 permits since 2000: 39 completed, 5 in progress, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 never finaled. Typically 72 days from filing to permit and 420 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2016 | Completed final sign-off Jul 2018 | 1612 Castro St | revision to 2015 0918 7465 to include new roof hatch and roof deck per ab-0057, add stair to new roof deck. adjust kitchen location.Details
revision to 2015 0918 7465 to include new roof hatch and roof deck per ab-0057, add stair to new roof deck. adjust kitchen location. | $50,000 |
| Sep 16, 2015 | Completed final sign-off Nov 2016 | 2652 21st St | remodel extg upper level dwelling unit, new roof deck, new kitchen and bath. convert commercial ground floor to residential; new kitchen and bathrooms by relocating unit above garage (882 hampshire) to front building existing commercial unit. sprinklers under separate permit.Details
remodel extg upper level dwelling unit, new roof deck, new kitchen and bath. convert commercial ground floor to residential; new kitchen and bathrooms by relocating unit above garage (882 hampshire) to front building existing commercial unit. sprinklers under separate permit. | $400,000 |
| Mar 25, 2014 | Never finaled issued Jul 2014, no final | 75 Buena Vista Tr | add condition space @ (e) basement within (e) envelope includes excavation, full bath, (n) int. stair connecting 1/f to basement, remodel kitchen, strl upgrades, repair (e) deck & ext. stair @ north property line to comply with nov#201300439. add operable skylt, stair and new roof deck onDetails
add condition space @ (e) basement within (e) envelope includes excavation, full bath, (n) int. stair connecting 1/f to basement, remodel kitchen, strl upgrades, repair (e) deck & ext. stair @ north property line to comply with nov#201300439. add operable skylt, stair and new roof deck on | $138,000 |
| Jan 8, 2014 | Completed final sign-off Jun 2015 | 2324 19th St | revision to app#201006184828 to add stair to upper roof and create new roof top deck.Details
revision to app#201006184828 to add stair to upper roof and create new roof top deck. | $15,000 |