Back to bathroom remodel contractors
Baxter Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2017 to Aug 2026
- Last 24 months
- 23 permits filed
109 permits since 2000: 67 completed, 8 in progress, 27 never finaled, 7 expired or cancelled.
Of the 27 never-finaled permits, 7 are 3 to 5 years old, 20 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
47 bathroom remodel permits: 30 completed, 3 in progress, 9 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Aug 2026 | 2190 Broadway | unit# 9w: remodel kitchen and (3) bathrooms. new hardwood flooring remove non-bearing wall between kitchen & dining room. move closet in primary bath. cap bar sink in entry and replace all fixtures in kind. electrical and plumbing under separate permits.Details
unit# 9w: remodel kitchen and (3) bathrooms. new hardwood flooring remove non-bearing wall between kitchen & dining room. move closet in primary bath. cap bar sink in entry and replace all fixtures in kind. electrical and plumbing under separate permits. | $125,000 |
| Jun 22, 2026 | In progress issued Jun 2026 | 611 Washington St | unit 2402- interior remodel to include electrical and plumbing. kitchen appliances and finishes replaced in kind. one kitchen wall with door to be reconfigured. 3xbathrooms remodeled in kind. one wall with two doors between guest bedroom and primary bathroom to be reconfigured. casework throughoutDetails
unit 2402- interior remodel to include electrical and plumbing. kitchen appliances and finishes replaced in kind. one kitchen wall with door to be reconfigured. 3xbathrooms remodeled in kind. one wall with two doors between guest bedroom and primary bathroom to be reconfigured. casework throughout | $200,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 3537 23rd St | kitchen and bathroom remodel. replace sink in kitchen, remove tub in bathroom and cap off area. update electrical and plumbing as needed.Details
kitchen and bathroom remodel. replace sink in kitchen, remove tub in bathroom and cap off area. update electrical and plumbing as needed. | $75,000 |
| Feb 6, 2026 | Completed final sign-off Feb 2026 | 1 Steuart Ln | revision to pa #2025-0226-1137: new wall & soffit in kitchen. new soffit in bedroom & remove bathroom plumbing from scope.Details
revision to pa #2025-0226-1137: new wall & soffit in kitchen. new soffit in bedroom & remove bathroom plumbing from scope. | $78,000 |
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 280 Spear St | apt 39b: open drywall in 3 bathrooms to accomodate plumbing, remove and replace three toilets, two tubs. all in kind.Details
apt 39b: open drywall in 3 bathrooms to accomodate plumbing, remove and replace three toilets, two tubs. all in kind. | $45,000 |
| Jun 27, 2025 | Completed final sign-off Jul 2026 | 1960 Vallejo St | unit 2: remodel kitchen, remodel (3) baths, new stone and tile. refinish floors, replace and refurbish interior door hardware, new office and bedroom, cabinetry, electrical/ plumbing under seperate permits.Details
unit 2: remodel kitchen, remodel (3) baths, new stone and tile. refinish floors, replace and refurbish interior door hardware, new office and bedroom, cabinetry, electrical/ plumbing under seperate permits. | $125,000 |
| Feb 26, 2025 | Completed final sign-off Feb 2026 | 1 Steuart Ln | unit 1406: remodel existing kitchen and remodel guest bath in kind. new plumbing fixtures, appliances, counter tops.Details
unit 1406: remodel existing kitchen and remodel guest bath in kind. new plumbing fixtures, appliances, counter tops. | $78,000 |
| Feb 20, 2025 | Completed final sign-off Sep 2025 | 301 Mission St | remodel existing primary bathroom in kind.Details
remodel existing primary bathroom in kind. | $45,000 |
| Aug 20, 2024 | Completed final sign-off Mar 2025 | 765 Market St | unit 23-g: remodel 3 existing bathrooms-in kind. no relocation of plumbing lines. new cabinets & lights in 1-kitchen. no relocation of wall, window or doorDetails
unit 23-g: remodel 3 existing bathrooms-in kind. no relocation of plumbing lines. new cabinets & lights in 1-kitchen. no relocation of wall, window or door | $20,000 |
| Jul 17, 2024 | Completed final sign-off Mar 2025 | 1750 Taylor St | unit 2302: remodel 2 bathrooms & kitchen, replace plumbing fixture in kind. no structural or exterior workDetails
unit 2302: remodel 2 bathrooms & kitchen, replace plumbing fixture in kind. no structural or exterior work | $125,000 |
| Jun 3, 2024 | Completed final sign-off Mar 2025 | 1045 Mason St | #101: remodel of primary bath, guest bath, and kitchen within existing foot print.Details
#101: remodel of primary bath, guest bath, and kitchen within existing foot print. | $250,000 |
| Aug 23, 2023 | Completed final sign-off Dec 2024 | 706 Mission St | remodel to update finishes in (2) bathrooms, (1) powder room, plumbing, miscellaneous electrical work, contractor shall maintain all existing adaptabl features. new work shall comply with the 2022 cbc requirements of chapter 11a. all fire ratings and separations shall be maintained.Details
remodel to update finishes in (2) bathrooms, (1) powder room, plumbing, miscellaneous electrical work, contractor shall maintain all existing adaptabl features. new work shall comply with the 2022 cbc requirements of chapter 11a. all fire ratings and separations shall be maintained. | $250,000 |
| Jun 15, 2023 | Expired or cancelled expired Apr 2025 | 1200 California St | unit 11: remodel 1 (e) bathroom, no relocation of plumbing, install new bienet at kitchen, new countertop and sink. maher n/a. no removal of wallsDetails
unit 11: remodel 1 (e) bathroom, no relocation of plumbing, install new bienet at kitchen, new countertop and sink. maher n/a. no removal of walls | $32,000 |
| Apr 25, 2023 | Expired or cancelled expired Nov 2024 | 2040 Broadway | remodel existing kitchen and 4 bathrooms- new plumbing and light fixtures- new tile- new cabinetsDetails
remodel existing kitchen and 4 bathrooms- new plumbing and light fixtures- new tile- new cabinets | $80,000 |
| Mar 24, 2023 | Completed final sign-off Apr 2023 | 765 Market St | rev to pa# 2021-0602-1430: reduce and remodel (e) master bath, remove (e) guest bathroom to expand (e) guest bedroom reconfigure (e) closet no change in accessibility featuresDetails
rev to pa# 2021-0602-1430: reduce and remodel (e) master bath, remove (e) guest bathroom to expand (e) guest bedroom reconfigure (e) closet no change in accessibility features | $10,000 |
| Feb 28, 2023 | Expired or cancelled cancelled Jul 2023 | 1200 California St | unit 18c: remodel 1 existing bathroom with new fixtures and tile, cabinets and install new kitchen cabinets, countertop. no relocation of plumbing.Details
unit 18c: remodel 1 existing bathroom with new fixtures and tile, cabinets and install new kitchen cabinets, countertop. no relocation of plumbing. | $25,000 |
| Feb 10, 2023 | Completed final sign-off Oct 2025 | 2190 Broadway | remodel (4) bathrooms and (1) kitchen to include new fixtures and finishes in kind - no relocation of plumbing.Details
remodel (4) bathrooms and (1) kitchen to include new fixtures and finishes in kind - no relocation of plumbing. | $160,000 |
| Feb 10, 2023 | Never finaled issued Feb 2023, no final | 1170 Sacramento St | #17a: remodel 3 extg bathrooms to include all new fixtures and finishes. no relocation of plmg lines. remodel in kind.Details
#17a: remodel 3 extg bathrooms to include all new fixtures and finishes. no relocation of plmg lines. remodel in kind. | $80,000 |
| Jan 9, 2023 | Completed final sign-off Apr 2023 | 280 Spear St | #40c: revision to pa#202010136398' additional permit for increase valuation of project. same scope of work as previous permit. modify extg ceilings to accomodate new lighting, remodel kitchen, powder room, master bath and laundry room. all plmg locations remain the same. no relocation.Details
#40c: revision to pa#202010136398' additional permit for increase valuation of project. same scope of work as previous permit. modify extg ceilings to accomodate new lighting, remodel kitchen, powder room, master bath and laundry room. all plmg locations remain the same. no relocation. | $115,000 |
| Aug 16, 2022 | Completed final sign-off Jun 2023 | 301 Mission St | unit 36b: remodel (3) bathrooms and (1) kitchen in kind. non-structural.Details
unit 36b: remodel (3) bathrooms and (1) kitchen in kind. non-structural. | $70,000 |
| Mar 25, 2022 | Never finaled issued Apr 2022, no final | 42 Rossi Av | remove (e) structural columns in basement, remove (e) interior non bearing wall on the 1st fl. kitchen, and 2 fl. bathroomDetails
remove (e) structural columns in basement, remove (e) interior non bearing wall on the 1st fl. kitchen, and 2 fl. bathroom | $38,000 |
| Jan 27, 2022 | Completed final sign-off Apr 2023 | 75 Howard St | 1 steuart lane: unit 1106: new high efficiency lighting throughout- new finishes in master and guest baths. new built in cabinetry at 2 closets. open and patch drywall for electrical work.Details
1 steuart lane: unit 1106: new high efficiency lighting throughout- new finishes in master and guest baths. new built in cabinetry at 2 closets. open and patch drywall for electrical work. | $75,000 |
| Dec 21, 2021 | Completed final sign-off Dec 2022 | 1190 Sacramento St | apt 8: remodel ktichen:l new cabinets, countertops & appliances. remodel master bath: replace (e) fixtures & finishes with new. no relocation of plumbing or layout.Details
apt 8: remodel ktichen:l new cabinets, countertops & appliances. remodel master bath: replace (e) fixtures & finishes with new. no relocation of plumbing or layout. | $75,000 |
| Aug 25, 2021 | Never finaled issued Aug 2021, no final | 42 Rossi Av | remodel one kitchen and one bathroom, new appliances, cabinets, plumbing fixtures, floor and lighting. h.e. lighting & controlled per cec 150.0(k)Details
remodel one kitchen and one bathroom, new appliances, cabinets, plumbing fixtures, floor and lighting. h.e. lighting & controlled per cec 150.0(k) | $40,000 |
| Aug 20, 2021 | Completed final sign-off Jan 2023 | 188 Minna St | #35b. remodel bathroom - new counter tops, cabinets in kitchen. non-structuralDetails
#35b. remodel bathroom - new counter tops, cabinets in kitchen. non-structural | $40,000 |
| Aug 19, 2021 | Completed final sign-off May 2022 | 75 Howard St | unit#610: remodel master bathroom. remodel in-kind.Details
unit#610: remodel master bathroom. remodel in-kind. | $35,000 |
| Jun 2, 2021 | Completed final sign-off Apr 2023 | 765 Market St | remodel existing master bathroom with new finishes. remove existing guest bathroom to expand existing guest bedroom. reconfigure existing master closet. no walls moving, no change in accessability featuresDetails
remodel existing master bathroom with new finishes. remove existing guest bathroom to expand existing guest bedroom. reconfigure existing master closet. no walls moving, no change in accessability features | $25,000 |
| Apr 2, 2021 | Never finaled issued Apr 2021, no final | 765 Market St | unit 35g: new finishes in kitchen and bathroom. all plumbing fixture locations to remain the same. upgrade (e) halogen lights to led throughout using (e) wiring. remodel in-kind, plumbing fixture & lighting only.Details
unit 35g: new finishes in kitchen and bathroom. all plumbing fixture locations to remain the same. upgrade (e) halogen lights to led throughout using (e) wiring. remodel in-kind, plumbing fixture & lighting only. | $10,000 |
| Dec 11, 2020 | Expired or cancelled expired Jun 2023 | 765 Market St | install new hardwood flooring throughout, install new cabinets at kitchen & master closet, install doors at living room & study, remodel master bath & powder room. no change to plumbing locations. no removing walls. all interiorDetails
install new hardwood flooring throughout, install new cabinets at kitchen & master closet, install doors at living room & study, remodel master bath & powder room. no change to plumbing locations. no removing walls. all interior | $30,000 |
| Oct 13, 2020 | Completed final sign-off Apr 2023 | 280 Spear St | unit 40c: modify existing ceiligs to accomodate new lighting, remodel kitchen, powder room, master bath and laundry room. all plumbing locations to remain the same. no relocation.Details
unit 40c: modify existing ceiligs to accomodate new lighting, remodel kitchen, powder room, master bath and laundry room. all plumbing locations to remain the same. no relocation. | $85,000 |
| Sep 21, 2020 | Never finaled issued Sep 2020, no final | 181 Fremont St | remove & replace existing wet bar. relocate existing recessed lights, remove master bedroom & bathroom. no structural. electrical, plumbing, and sprinkler work under separate permit.Details
remove & replace existing wet bar. relocate existing recessed lights, remove master bedroom & bathroom. no structural. electrical, plumbing, and sprinkler work under separate permit. | $100,000 |
| Sep 14, 2020 | Expired or cancelled cancelled Nov 2020 | 282 Pixley St | remodel kitchen and 2 bathrooms in-kind. no walls movingDetails
remodel kitchen and 2 bathrooms in-kind. no walls moving | $45,000 |
| Feb 26, 2020 | Never finaled issued Feb 2020, no final | 765 Market St | remodel power room in unit 30f. replace existing fixtures with new in same location. new tile in shower. remodel bathroom no relocation / moving of walls.Details
remodel power room in unit 30f. replace existing fixtures with new in same location. new tile in shower. remodel bathroom no relocation / moving of walls. | $20,000 |
| Dec 5, 2019 | Completed final sign-off Aug 2020 | 1200 California St | remodel 1 kitchen and 2 bathrooms incl new tile, stone, cabinets, light fixtures, plumbing fixtures in (e) locations. no structural work. no relocation of doors or windowsDetails
remodel 1 kitchen and 2 bathrooms incl new tile, stone, cabinets, light fixtures, plumbing fixtures in (e) locations. no structural work. no relocation of doors or windows | $60,000 |
| Aug 19, 2019 | Completed final sign-off Mar 2020 | 181 Fremont St | remodel of (e) kitchen including new appliances, fixtures & cabinets. new finishes in master bathroom. no relocation of walls or doors. no structural work in kitchen & master bath onlyDetails
remodel of (e) kitchen including new appliances, fixtures & cabinets. new finishes in master bathroom. no relocation of walls or doors. no structural work in kitchen & master bath only | $85,000 |
| Apr 23, 2019 | Completed final sign-off Aug 2021 | 2190 Broadway | unit 8e: remodel kitchen & four bathrooms. new hardwood flooring - removing non-bearing wall between kitchen & dining room.Details
unit 8e: remodel kitchen & four bathrooms. new hardwood flooring - removing non-bearing wall between kitchen & dining room. | $90,000 |
| Apr 23, 2019 | Never finaled issued Apr 2019, no final | 690 Market St | remodel existing guest bath, new finishes, fixtures, new hardwood flooring throughout unit. no relocation of walls windowsDetails
remodel existing guest bath, new finishes, fixtures, new hardwood flooring throughout unit. no relocation of walls windows | $25,000 |
| Oct 4, 2018 | Never finaled issued Oct 2018, no final | 1200 California St | replace plumbing fixtures in 2 bathrooms in existing locations install new dining room light fixture, new countertop in kitchen, new kitchen cabinets. kitchen approx 10 x 6 master bath approx 12 x 10 - guest bath -5x6Details
replace plumbing fixtures in 2 bathrooms in existing locations install new dining room light fixture, new countertop in kitchen, new kitchen cabinets. kitchen approx 10 x 6 master bath approx 12 x 10 - guest bath -5x6 | $35,000 |
| Aug 22, 2018 | Completed final sign-off Sep 2020 | 765 Market St | unit 22a. renovate 1 kitchen, 4 bathrooms, laundry, new hardwood rloors throughout, new led recessed lighting, no structural work, new walls and ceilings per plans. maher n/a.Details
unit 22a. renovate 1 kitchen, 4 bathrooms, laundry, new hardwood rloors throughout, new led recessed lighting, no structural work, new walls and ceilings per plans. maher n/a. | $150,000 |
| Feb 22, 2018 | Completed final sign-off Nov 2018 | 1200 California St | kitchen remodel, (2) bathrooms, new fixtures in (e) locations, new hardwood flooring throughout unit, no change to walls or openingsDetails
kitchen remodel, (2) bathrooms, new fixtures in (e) locations, new hardwood flooring throughout unit, no change to walls or openings | $75,000 |
| Dec 13, 2017 | Completed final sign-off Sep 2019 | 1960 Broadway | remodel of unit #9 as per plans, include new hardwood flooring throughout & tile & stone floors at kitchen and baths, new plumbing fixtures, new light fixture s remove non bearing wall between kitchen & dining roomDetails
remodel of unit #9 as per plans, include new hardwood flooring throughout & tile & stone floors at kitchen and baths, new plumbing fixtures, new light fixture s remove non bearing wall between kitchen & dining room | $165,000 |
| Oct 12, 2017 | Completed final sign-off Mar 2019 | 1200 California St | #12c: interior remodel, removing & replaxing finishes, including kitchen & bathrooms. maher naDetails
#12c: interior remodel, removing & replaxing finishes, including kitchen & bathrooms. maher na | $500,000 |
| Sep 1, 2017 | Completed final sign-off May 2018 | 765 Market St | new hardwood flooring througout - remodel of 3 bathrooms - new finishes, fixtures, cabinets, no relocation of plumbing, no relocation of walls, no structural work. only in unit #34f. all accessbile features required by cbc chapter 11a shall be maintained.Details
new hardwood flooring througout - remodel of 3 bathrooms - new finishes, fixtures, cabinets, no relocation of plumbing, no relocation of walls, no structural work. only in unit #34f. all accessbile features required by cbc chapter 11a shall be maintained. | $60,000 |
| Aug 1, 2017 | Completed final sign-off Nov 2017 | 235 Divisadero St | remodel (e) bathroom. new fixtures and finishes. no relocation of wall or plumbing. new fixtures in existing locatins. no walls moved, removed, added or infilled. all existing layuts t remain unchanged.Details
remodel (e) bathroom. new fixtures and finishes. no relocation of wall or plumbing. new fixtures in existing locatins. no walls moved, removed, added or infilled. all existing layuts t remain unchanged. | $25,000 |
| Jun 14, 2017 | Completed final sign-off Dec 2017 | 765 Market St | remodel of 1 kitchen and 1 bath - new finishes, fixtures, cubicles, no relocation of plumbing, no relocation of walls, no structural work - only in unit #30cDetails
remodel of 1 kitchen and 1 bath - new finishes, fixtures, cubicles, no relocation of plumbing, no relocation of walls, no structural work - only in unit #30c | $40,000 |
| Jun 12, 2017 | Completed final sign-off Jan 2018 | 1200 California St | remodel of (3) existing bathrooms - all plumbing fixtures in (e) locations, new countertops in kitlchen, new hardwood flooring throughout, no strucutrual, no relocatonof walls, door or windows. work in unit 4c only. high efficacy lighting. n/a maherDetails
remodel of (3) existing bathrooms - all plumbing fixtures in (e) locations, new countertops in kitlchen, new hardwood flooring throughout, no strucutrual, no relocatonof walls, door or windows. work in unit 4c only. high efficacy lighting. n/a maher | $69,000 |
| May 16, 2017 | Never finaled issued May 2017, no final | 765 Market St | unit #22b: remodel (1) kitchen and (1) bath. includes new plumbing fixtures, new tile, new stone, new cabinets, new lighting, new hardwood floors thoughout. in same location. no moving of doors, walls, or windows.Details
unit #22b: remodel (1) kitchen and (1) bath. includes new plumbing fixtures, new tile, new stone, new cabinets, new lighting, new hardwood floors thoughout. in same location. no moving of doors, walls, or windows. | $45,000 |