Block 3719, lot 273
301 Mission St
- City’s use
- Single Family Residential
- Built
- 2009
- Stories
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,652 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2022 | Completed final sign-off Jun 2023 | 301 Mission St | Baxter Construction | revision of app# 202208160639: update cost to be $170,000 for project. scope of work remains the same.Details
revision of app# 202208160639: update cost to be $170,000 for project. scope of work remains the same. | $100,000 |
| Nov 21, 2022 | Completed final sign-off Apr 2023 | 301 Mission St | Superior Automatic Sprinkler | lower sprinkler heads due to new ceiling height.Details
lower sprinkler heads due to new ceiling height. | $10,200 |
| Aug 16, 2022 | Completed final sign-off Jun 2023 | 301 Mission St | Baxter Construction | unit 36b: remodel (3) bathrooms and (1) kitchen in kind. non-structural.Details
unit 36b: remodel (3) bathrooms and (1) kitchen in kind. non-structural. | $70,000 |
| Oct 3, 2018 | Completed final sign-off Mar 2021 | 301 Mission St | removal of tub, extend shower to 20" (move (e) wall ) lay tile, add cabinets less than 5'9". maher n/a.Details
removal of tub, extend shower to 20" (move (e) wall ) lay tile, add cabinets less than 5'9". maher n/a. | $20,000 | |
| Sep 14, 2018 | Completed final sign-off Nov 2018 | 301 Mission St | W E Lyons Construction Co | unit# 36b: remove countertop and gyp board under window sill as shown on attached drawing. inspect fire stop. repair if necessary (fire stop) repair wall and countertop. no alteration to curtain wall framing, and structure. maintain (e) fire rating.Details
unit# 36b: remove countertop and gyp board under window sill as shown on attached drawing. inspect fire stop. repair if necessary (fire stop) repair wall and countertop. no alteration to curtain wall framing, and structure. maintain (e) fire rating. | $10,000 |
| Jan 18, 2018 | Never finaled issued Jan 2018, no final | 301 Mission St | W E Lyons Construction Co | remove (e) fire stopping at rise pipes, clean and prep and apply (n) fire stopping.clean and prep surfaces at curtain wall mullions to receive fire seals; install fire blocking inside gaps at vertical mullions; prep, patch and seal exterior wall gaps at curtain wall. ref 201801128507. maher n/a.Details
remove (e) fire stopping at rise pipes, clean and prep and apply (n) fire stopping.clean and prep surfaces at curtain wall mullions to receive fire seals; install fire blocking inside gaps at vertical mullions; prep, patch and seal exterior wall gaps at curtain wall. ref 201801128507. maher n/a. | $10,000 |
| Jan 12, 2018 | Completed final sign-off Jan 2018 | 301 Mission St | W E Lyons Construction Co | ur&r gyp board at floor slab edge to review fire resistive construction and curtain wall, heat pump penetrations, fire-rated demising wall,furred soffit condition,unit 36b only, gyp board to be restored to original condition upon completion of work. any repair wor will be filed under seperate permitDetails
ur&r gyp board at floor slab edge to review fire resistive construction and curtain wall, heat pump penetrations, fire-rated demising wall,furred soffit condition,unit 36b only, gyp board to be restored to original condition upon completion of work. any repair wor will be filed under seperate permit | $10,000 |
| Nov 7, 2014 | Completed final sign-off Feb 2015 | 301 Mission St | Black Mountain Development | remove and replace extg hardwoods and carpet to bldg specs. remove and reuse all baseboards. replace lighting with modern energy efficient units. replace window coverings with new units. replace extg bath fans with modern nergy efficient units. repair drywall as needed. paint unit.n/a for maherDetails
remove and replace extg hardwoods and carpet to bldg specs. remove and reuse all baseboards. replace lighting with modern energy efficient units. replace window coverings with new units. replace extg bath fans with modern nergy efficient units. repair drywall as needed. paint unit.n/a for maher | $90,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.