Basec
- Based in
- Oakland
- On San Francisco permits
- Mar 2000 to Jul 2020
- Last 24 months
- 0 permits filed
63 permits since 2000: 46 completed, 2 never finaled, 15 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 expired or cancelled. Typically 2 days from filing to permit and 37 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 1, 2019 | Completed final sign-off Jul 2020 | 4211 Moraga St | repair extg deck, stair and railing with like kind. not related to app#201909101245. this is a different stair.Details
repair extg deck, stair and railing with like kind. not related to app#201909101245. this is a different stair. | $24,500 |
| Sep 10, 2019 | Expired or cancelled withdrawn Nov 2019 | 4211 Moraga St | replace existing exterior stair with a new stairDetails
replace existing exterior stair with a new stair | $36,000 |
| Aug 17, 2018 | Expired or cancelled expired Jul 2022 | 1945 Clay St | to comply with nov# 201865501. legalize existing alterations performed without permit. including kitchen remodel at unit numbers 2,3,4,5,7,8,11 and 12. and add 1 bedroom in each unit. add window escape/rescue emergency stairway (exterior).Details
to comply with nov# 201865501. legalize existing alterations performed without permit. including kitchen remodel at unit numbers 2,3,4,5,7,8,11 and 12. and add 1 bedroom in each unit. add window escape/rescue emergency stairway (exterior). | $5,000 |
| Apr 26, 2002 | Completed final sign-off May 2002 | 4130 Cesar Chavez St | revision to app#2002/04/03/2975. replace 16 more steps w/ like kind (front stair)concrete step. attcDetails
revision to app#2002/04/03/2975. replace 16 more steps w/ like kind (front stair)concrete step. attc | $1,000 |
| Apr 3, 2002 | Completed final sign-off May 2002 | 4130 Cesar Chavez St | rev. appl#200201318219 replace 10 steps w/like kind @ front stair, concrete steps attch to (e) strinDetails
rev. appl#200201318219 replace 10 steps w/like kind @ front stair, concrete steps attch to (e) strin | $1,000 |