Back to kitchen remodel contractors
Basec
- Based in
- Oakland
- On San Francisco permits
- Mar 2000 to Jul 2020
- Last 24 months
- 0 permits filed
63 permits since 2000: 46 completed, 2 never finaled, 15 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2018 | Expired or cancelled expired Jul 2022 | 1945 Clay St | to comply with nov# 201865501. legalize existing alterations performed without permit. including kitchen remodel at unit numbers 2,3,4,5,7,8,11 and 12. and add 1 bedroom in each unit. add window escape/rescue emergency stairway (exterior).Details
to comply with nov# 201865501. legalize existing alterations performed without permit. including kitchen remodel at unit numbers 2,3,4,5,7,8,11 and 12. and add 1 bedroom in each unit. add window escape/rescue emergency stairway (exterior). | $5,000 |
| Mar 16, 2018 | Completed final sign-off Nov 2018 | 950 Bay St | unit # 17 -kitchen & bath remodel, cabinets, sinks, fllor, tub surround, add gfi panel , fixtures, windows (in kind) not visable from the streetDetails
unit # 17 -kitchen & bath remodel, cabinets, sinks, fllor, tub surround, add gfi panel , fixtures, windows (in kind) not visable from the street | $12,000 |
| Mar 16, 2018 | Completed final sign-off Nov 2018 | 950 Bay St | unit # 10 -kitchen & bath remodel, cabinets, sinks, fllor, tub surround, add gfi panel , fixtures, windows (in kind) not visable from the streetDetails
unit # 10 -kitchen & bath remodel, cabinets, sinks, fllor, tub surround, add gfi panel , fixtures, windows (in kind) not visable from the street | $12,000 |
| Mar 16, 2018 | Completed final sign-off Nov 2018 | 950 Bay St | unit # 4 -kitchen & bath remodel, cabinets, sinks, fllor, tub surround, add gfi panel , fixtures, windows (in kind) over garage plumbing steel to copper not visible from the street, no work in common area allw ork within unit, no fire alarm or sprinkler work rqrdDetails
unit # 4 -kitchen & bath remodel, cabinets, sinks, fllor, tub surround, add gfi panel , fixtures, windows (in kind) over garage plumbing steel to copper not visible from the street, no work in common area allw ork within unit, no fire alarm or sprinkler work rqrd | $16,000 |