Bartley Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2004 to Sep 2024
- Last 24 months
- 0 permits filed
60 permits since 2000: 49 completed, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
3 roof deck permits: 3 completed. Typically 153 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2021 | Completed final sign-off Aug 2023 | 616 02nd Av | add 158 sf of (n) habitable ground fl space at rear with roof deck at 2nd fl level to replace (e) freestanding deck. convert (e) rear ground fl storage areas to (n) family room, bedroom & bathroom. lower ground fl concrete slab & replace concrete footings. add lowered patio in rear yard.Details
add 158 sf of (n) habitable ground fl space at rear with roof deck at 2nd fl level to replace (e) freestanding deck. convert (e) rear ground fl storage areas to (n) family room, bedroom & bathroom. lower ground fl concrete slab & replace concrete footings. add lowered patio in rear yard. | $52,500 |
| Dec 13, 2016 | Completed final sign-off Apr 2017 | 26 Bernard St | revision to app#201512084442 s to substitute glass railing with galvanised open picket railing on roof deck and 2nd floor deck.Details
revision to app#201512084442 s to substitute glass railing with galvanised open picket railing on roof deck and 2nd floor deck. | |
| Dec 8, 2015 | Completed final sign-off Apr 2017 | 26 Bernard St | revision to approve pa# 2015/07/16/1739. replace & enlarge (e) roof deck. extend (e) garage into rear yard & add pair of doors @ rear. provide new deck @ 2nd floor bedroom with 1 hour parapet @ property line.Details
revision to approve pa# 2015/07/16/1739. replace & enlarge (e) roof deck. extend (e) garage into rear yard & add pair of doors @ rear. provide new deck @ 2nd floor bedroom with 1 hour parapet @ property line. | $22,500 |