Back to bathroom remodel contractors
Bartley Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2004 to Sep 2024
- Last 24 months
- 0 permits filed
60 permits since 2000: 49 completed, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 21 completed, 6 never finaled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2024 | Completed final sign-off Mar 2025 | 2248 Sloat Bl | remodel existing kitchen & 2nd bathroom inkind. remove sheetrock in back 2 bedrooms and replace with new insulation & sheetrock.Details
remodel existing kitchen & 2nd bathroom inkind. remove sheetrock in back 2 bedrooms and replace with new insulation & sheetrock. | $65,000 |
| Apr 1, 2024 | Completed final sign-off Sep 2024 | 4630 18th St | remodel of extg adu to include replace slab and foundation at rear, install water proofing and drainage. upgrade floor, framing. no exterior work. no additional square footage. (bathroom remodel under permit #202403188050Details
remodel of extg adu to include replace slab and foundation at rear, install water proofing and drainage. upgrade floor, framing. no exterior work. no additional square footage. (bathroom remodel under permit #202403188050 | $15,000 |
| Mar 18, 2024 | Completed final sign-off Mar 2025 | 4630 18th St | remodel (e) bathroom and kitchen in kind update (e) electricalDetails
remodel (e) bathroom and kitchen in kind update (e) electrical | $60,000 |
| Mar 25, 2022 | Completed final sign-off May 2023 | 1327 06th Av | 2 unit kitchen & bath remodel. 1329: remodel kitchen & bathroom in kind. 1327: remodel kitchen & bathroom in kind. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
2 unit kitchen & bath remodel. 1329: remodel kitchen & bathroom in kind. 1327: remodel kitchen & bathroom in kind. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5. | $70,000 |
| Dec 28, 2021 | Completed final sign-off Sep 2022 | 2856 Washington St | update layout of (e) kitchen, no structural change. update layout of (e) master bathroom. electrical & plumbing move in kitchen master bathroom. (e) bathroom #1 like for like replacement. no electrical & plumbing will be moved. add washer/dryer.Details
update layout of (e) kitchen, no structural change. update layout of (e) master bathroom. electrical & plumbing move in kitchen master bathroom. (e) bathroom #1 like for like replacement. no electrical & plumbing will be moved. add washer/dryer. | $150,000 |
| Apr 13, 2021 | Completed final sign-off Aug 2023 | 616 02nd Av | add 158 sf of (n) habitable ground fl space at rear with roof deck at 2nd fl level to replace (e) freestanding deck. convert (e) rear ground fl storage areas to (n) family room, bedroom & bathroom. lower ground fl concrete slab & replace concrete footings. add lowered patio in rear yard.Details
add 158 sf of (n) habitable ground fl space at rear with roof deck at 2nd fl level to replace (e) freestanding deck. convert (e) rear ground fl storage areas to (n) family room, bedroom & bathroom. lower ground fl concrete slab & replace concrete footings. add lowered patio in rear yard. | $52,500 |
| Jan 22, 2021 | Completed final sign-off Aug 2023 | 616 02nd Av | 1st floor: convert front storage to garage. add garage door and relocate entry door at front. 2nd floor: remodel kitchen, add powder room and replace sunroom windows. 3/f: add master bath & remodel master suite, add dormer at master bath. new split furnace at 1st floor & attic.Details
1st floor: convert front storage to garage. add garage door and relocate entry door at front. 2nd floor: remodel kitchen, add powder room and replace sunroom windows. 3/f: add master bath & remodel master suite, add dormer at master bath. new split furnace at 1st floor & attic. | $140,000 |
| Sep 9, 2020 | Completed final sign-off Aug 2021 | 91 Seward St | one kitchen and one bathroom remodeling: kitchen remodeling on 2nd fl like for like. bathroom remodeling on 1st fl like for like. nw lighting shall comply with cec 150.0 (k) 3 & k(5). no walls alterations. no nw wall & no extg wall relocations. all new plumbing fixtures retain in same location.Details
one kitchen and one bathroom remodeling: kitchen remodeling on 2nd fl like for like. bathroom remodeling on 1st fl like for like. nw lighting shall comply with cec 150.0 (k) 3 & k(5). no walls alterations. no nw wall & no extg wall relocations. all new plumbing fixtures retain in same location. | $80,000 |
| Nov 28, 2018 | Completed final sign-off Oct 2019 | 447 38th Av | kitchen & bathroom remodel. r/r (e) kitchen & bathroom as-is in same location & layout. new cabinets, tile work, paint, new fixtures.Details
kitchen & bathroom remodel. r/r (e) kitchen & bathroom as-is in same location & layout. new cabinets, tile work, paint, new fixtures. | $45,000 |
| Sep 26, 2018 | Never finaled issued Oct 2018, no final | 2554 Pine St | relocate extg skylight; remodel extg kitchen and open up to family room and dining room; add new master bath and closet; relocate laundry, provide new bedroom, and closet, convert 2 extg baths to closets.Details
relocate extg skylight; remodel extg kitchen and open up to family room and dining room; add new master bath and closet; relocate laundry, provide new bedroom, and closet, convert 2 extg baths to closets. | $85,000 |
| Dec 11, 2017 | Completed final sign-off Apr 2018 | 1480 10th Av | revision to 201710100816, repair stud wall at 2nd fl bathroom and laundryDetails
revision to 201710100816, repair stud wall at 2nd fl bathroom and laundry | |
| Oct 10, 2017 | Completed final sign-off Apr 2018 | 1480 10th Av | replace 2 bathrooms 2/f & 3/f in-kind. replace kitchen 2/f in kind. update elecrical & plumbing. no exterior work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
replace 2 bathrooms 2/f & 3/f in-kind. replace kitchen 2/f in kind. update elecrical & plumbing. no exterior work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $54,000 |
| Apr 19, 2017 | Completed final sign-off Sep 2017 | 60 Lower Tr | remodel (e) master bathroom in kind. new shower, tub, double vanity, install pocker door.Details
remodel (e) master bathroom in kind. new shower, tub, double vanity, install pocker door. | $35,000 |
| Apr 13, 2017 | Never finaled issued Sep 2018, no final | 229 28th St | 227 sf addition onto 3rd level. redo bathrooms and add additional bathroom, add new hvac and 1 bedroomDetails
227 sf addition onto 3rd level. redo bathrooms and add additional bathroom, add new hvac and 1 bedroom | $300,000 |
| Jul 5, 2016 | Completed final sign-off Sep 2016 | 310 Hill St | replace (e) 3rd floor master bathroom, in-kind. replace shower, convert tub and cabinets and floor.Details
replace (e) 3rd floor master bathroom, in-kind. replace shower, convert tub and cabinets and floor. | $14,000 |
| Jan 22, 2016 | Completed final sign-off Feb 2016 | 3445 Geary Bl | unit #309 - main unit bathroom replace bathtub & tile surround in kind also replace tile floor inkind. install new vanity.Details
unit #309 - main unit bathroom replace bathtub & tile surround in kind also replace tile floor inkind. install new vanity. | $4,000 |
| Jul 16, 2015 | Completed final sign-off Apr 2017 | 26 Bernard St | remodel the interior of the 2 apartment units: relocate the kitchens and bedrooms, add new bathrooms, replace all windows with new double glazed units.Details
remodel the interior of the 2 apartment units: relocate the kitchens and bedrooms, add new bathrooms, replace all windows with new double glazed units. | $180,000 |
| Mar 16, 2015 | Completed final sign-off Jun 2015 | 261 25th Av | replace kitchen cabinets with new cabinets, 4 new cans, remodel 2 bathrooms as is (in kind); replace carpet and fixtures , 1 bath tub and 1 walk-in shower.Details
replace kitchen cabinets with new cabinets, 4 new cans, remodel 2 bathrooms as is (in kind); replace carpet and fixtures , 1 bath tub and 1 walk-in shower. | $35,000 |
| Feb 14, 2014 | Completed final sign-off May 2014 | 261 25th Av | unit 2 - replace kitchen cabinets & floor, 10' x 10', 4 new cans. 2 bathrooms 1-5' x 8', replace fixtures as is 2- replace fixtures and replace (e) walkin shower. to compley with cec150(k) 8 & 10Details
unit 2 - replace kitchen cabinets & floor, 10' x 10', 4 new cans. 2 bathrooms 1-5' x 8', replace fixtures as is 2- replace fixtures and replace (e) walkin shower. to compley with cec150(k) 8 & 10 | $30,000 |
| Jan 2, 2014 | Never finaled issued Jan 2014, no final | 4259 24th St | revision to pa# 201311252796 kitchen/bath remodel, remove non-bearing wall & extend bathroom wall.Details
revision to pa# 201311252796 kitchen/bath remodel, remove non-bearing wall & extend bathroom wall. | $1,000 |
| Nov 25, 2013 | Never finaled issued Nov 2013, no final | 4259 24th St | replace existing bathroom & kitchen on 2nd floor with new.Details
replace existing bathroom & kitchen on 2nd floor with new. | $24,000 |
| Aug 23, 2012 | Completed final sign-off Oct 2012 | 2115 California St | one full bath remodeling on top level: replace existing bathroom fixtures with new bathtub/shower, toilet, tile work, 8'x10'. no change in wall & opening layout, permanently installed lights shall be high efficacy unless controlled by manual-0n occupancy sensor.Details
one full bath remodeling on top level: replace existing bathroom fixtures with new bathtub/shower, toilet, tile work, 8'x10'. no change in wall & opening layout, permanently installed lights shall be high efficacy unless controlled by manual-0n occupancy sensor. | $13,000 |
| May 21, 2012 | Completed final sign-off Jul 2012 | 2037 Greenwich St | unit #37: replace bathroom 8x5 in kind with new, replace kitchen 10x10 in kind with new, no relocation of walls, lighting msut comply with cec 150(k)Details
unit #37: replace bathroom 8x5 in kind with new, replace kitchen 10x10 in kind with new, no relocation of walls, lighting msut comply with cec 150(k) | $24,000 |
| Dec 5, 2011 | Completed final sign-off Apr 2014 | 1863 32nd Av | 1)basement remodeling. 2)add a new bath and family room on 1st floor. 3)replace extg furnace and water heater. 4)new conc. slab in rear yard.Details
1)basement remodeling. 2)add a new bath and family room on 1st floor. 3)replace extg furnace and water heater. 4)new conc. slab in rear yard. | $8,000 |
| Dec 2, 2011 | Completed final sign-off Mar 2012 | 6508 California St | remodel 4 and half bathrooms, in kind, update electrical. remodel kitchen, in kind, update eletrical.Details
remodel 4 and half bathrooms, in kind, update electrical. remodel kitchen, in kind, update eletrical. | $32,500 |
| Jun 9, 2005 | Never finaled issued Jun 2005, no final | 310 Hill St | remove 2 existing baths on 2nd flr. remove tile, sheet, fixtures, and replace with new. remove 1/2"Details
remove 2 existing baths on 2nd flr. remove tile, sheet, fixtures, and replace with new. remove 1/2" | $12,600 |
| Sep 10, 2004 | Never finaled issued Sep 2004, no final | 2663 23rd Av | remodel existing bathroom on ground floor. replace existing fixtures, tile, trim, and fitting newDetails
remodel existing bathroom on ground floor. replace existing fixtures, tile, trim, and fitting new | $3,400 |