Back to kitchen remodel contractors
Bartley Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2004 to Sep 2024
- Last 24 months
- 0 permits filed
60 permits since 2000: 49 completed, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 15 completed, 3 never finaled. Typically 0 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2024 | Completed final sign-off Mar 2025 | 2248 Sloat Bl | remodel existing kitchen & 2nd bathroom inkind. remove sheetrock in back 2 bedrooms and replace with new insulation & sheetrock.Details
remodel existing kitchen & 2nd bathroom inkind. remove sheetrock in back 2 bedrooms and replace with new insulation & sheetrock. | $65,000 |
| Mar 18, 2024 | Completed final sign-off Mar 2025 | 4630 18th St | remodel (e) bathroom and kitchen in kind update (e) electricalDetails
remodel (e) bathroom and kitchen in kind update (e) electrical | $60,000 |
| Mar 25, 2022 | Completed final sign-off May 2023 | 1327 06th Av | 2 unit kitchen & bath remodel. 1329: remodel kitchen & bathroom in kind. 1327: remodel kitchen & bathroom in kind. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
2 unit kitchen & bath remodel. 1329: remodel kitchen & bathroom in kind. 1327: remodel kitchen & bathroom in kind. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5. | $70,000 |
| Dec 28, 2021 | Completed final sign-off Sep 2022 | 2856 Washington St | update layout of (e) kitchen, no structural change. update layout of (e) master bathroom. electrical & plumbing move in kitchen master bathroom. (e) bathroom #1 like for like replacement. no electrical & plumbing will be moved. add washer/dryer.Details
update layout of (e) kitchen, no structural change. update layout of (e) master bathroom. electrical & plumbing move in kitchen master bathroom. (e) bathroom #1 like for like replacement. no electrical & plumbing will be moved. add washer/dryer. | $150,000 |
| Jun 9, 2021 | Completed final sign-off Aug 2021 | 91 Seward St | add 4 new double pane 2'x2' skylights in (e) kitchen ceiling. skylight to be min 5 ft off from inside property line wall. skylights to fit in between (e) roof members. existing roof is torch down flat.Details
add 4 new double pane 2'x2' skylights in (e) kitchen ceiling. skylight to be min 5 ft off from inside property line wall. skylights to fit in between (e) roof members. existing roof is torch down flat. | $6,000 |
| Jun 1, 2021 | Completed final sign-off Feb 2023 | 2115 California St | kitchen remodel- remove of wall between kitchen and living room.Details
kitchen remodel- remove of wall between kitchen and living room. | $30,000 |
| Jan 22, 2021 | Completed final sign-off Aug 2023 | 616 02nd Av | 1st floor: convert front storage to garage. add garage door and relocate entry door at front. 2nd floor: remodel kitchen, add powder room and replace sunroom windows. 3/f: add master bath & remodel master suite, add dormer at master bath. new split furnace at 1st floor & attic.Details
1st floor: convert front storage to garage. add garage door and relocate entry door at front. 2nd floor: remodel kitchen, add powder room and replace sunroom windows. 3/f: add master bath & remodel master suite, add dormer at master bath. new split furnace at 1st floor & attic. | $140,000 |
| Sep 9, 2020 | Completed final sign-off Aug 2021 | 91 Seward St | one kitchen and one bathroom remodeling: kitchen remodeling on 2nd fl like for like. bathroom remodeling on 1st fl like for like. nw lighting shall comply with cec 150.0 (k) 3 & k(5). no walls alterations. no nw wall & no extg wall relocations. all new plumbing fixtures retain in same location.Details
one kitchen and one bathroom remodeling: kitchen remodeling on 2nd fl like for like. bathroom remodeling on 1st fl like for like. nw lighting shall comply with cec 150.0 (k) 3 & k(5). no walls alterations. no nw wall & no extg wall relocations. all new plumbing fixtures retain in same location. | $80,000 |
| Nov 28, 2018 | Completed final sign-off Oct 2019 | 447 38th Av | kitchen & bathroom remodel. r/r (e) kitchen & bathroom as-is in same location & layout. new cabinets, tile work, paint, new fixtures.Details
kitchen & bathroom remodel. r/r (e) kitchen & bathroom as-is in same location & layout. new cabinets, tile work, paint, new fixtures. | $45,000 |
| Sep 26, 2018 | Never finaled issued Oct 2018, no final | 2554 Pine St | relocate extg skylight; remodel extg kitchen and open up to family room and dining room; add new master bath and closet; relocate laundry, provide new bedroom, and closet, convert 2 extg baths to closets.Details
relocate extg skylight; remodel extg kitchen and open up to family room and dining room; add new master bath and closet; relocate laundry, provide new bedroom, and closet, convert 2 extg baths to closets. | $85,000 |
| Oct 10, 2017 | Completed final sign-off Apr 2018 | 1480 10th Av | replace 2 bathrooms 2/f & 3/f in-kind. replace kitchen 2/f in kind. update elecrical & plumbing. no exterior work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
replace 2 bathrooms 2/f & 3/f in-kind. replace kitchen 2/f in kind. update elecrical & plumbing. no exterior work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $54,000 |
| Jul 16, 2015 | Completed final sign-off Apr 2017 | 26 Bernard St | remodel the interior of the 2 apartment units: relocate the kitchens and bedrooms, add new bathrooms, replace all windows with new double glazed units.Details
remodel the interior of the 2 apartment units: relocate the kitchens and bedrooms, add new bathrooms, replace all windows with new double glazed units. | $180,000 |
| Mar 16, 2015 | Completed final sign-off Jun 2015 | 261 25th Av | replace kitchen cabinets with new cabinets, 4 new cans, remodel 2 bathrooms as is (in kind); replace carpet and fixtures , 1 bath tub and 1 walk-in shower.Details
replace kitchen cabinets with new cabinets, 4 new cans, remodel 2 bathrooms as is (in kind); replace carpet and fixtures , 1 bath tub and 1 walk-in shower. | $35,000 |
| Feb 14, 2014 | Completed final sign-off May 2014 | 261 25th Av | unit 2 - replace kitchen cabinets & floor, 10' x 10', 4 new cans. 2 bathrooms 1-5' x 8', replace fixtures as is 2- replace fixtures and replace (e) walkin shower. to compley with cec150(k) 8 & 10Details
unit 2 - replace kitchen cabinets & floor, 10' x 10', 4 new cans. 2 bathrooms 1-5' x 8', replace fixtures as is 2- replace fixtures and replace (e) walkin shower. to compley with cec150(k) 8 & 10 | $30,000 |
| Jan 2, 2014 | Never finaled issued Jan 2014, no final | 4259 24th St | revision to pa# 201311252796 kitchen/bath remodel, remove non-bearing wall & extend bathroom wall.Details
revision to pa# 201311252796 kitchen/bath remodel, remove non-bearing wall & extend bathroom wall. | $1,000 |
| Nov 25, 2013 | Never finaled issued Nov 2013, no final | 4259 24th St | replace existing bathroom & kitchen on 2nd floor with new.Details
replace existing bathroom & kitchen on 2nd floor with new. | $24,000 |
| May 21, 2012 | Completed final sign-off Jul 2012 | 2037 Greenwich St | unit #37: replace bathroom 8x5 in kind with new, replace kitchen 10x10 in kind with new, no relocation of walls, lighting msut comply with cec 150(k)Details
unit #37: replace bathroom 8x5 in kind with new, replace kitchen 10x10 in kind with new, no relocation of walls, lighting msut comply with cec 150(k) | $24,000 |
| Dec 2, 2011 | Completed final sign-off Mar 2012 | 6508 California St | remodel 4 and half bathrooms, in kind, update electrical. remodel kitchen, in kind, update eletrical.Details
remodel 4 and half bathrooms, in kind, update electrical. remodel kitchen, in kind, update eletrical. | $32,500 |