Block 3620, lot 038
310 Hill St
- City’s use
- Single Family Residential
- Built
- 1978
- Stories
- 3
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,609 sq ft
- Lot
- 2,901 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2025 | In progress issued Nov 2025 | 310 Hill St | Cleary Plastering | lath and stucco over existing plywood at neighbor's line wall between two homes. different materials. not street facing.Details
lath and stucco over existing plywood at neighbor's line wall between two homes. different materials. not street facing. | $5,800 |
| Jul 3, 2024 | Completed final sign-off Aug 2024 | 310 Hill St | Bartley Construction | replace top floor front windows 5 and 2 sliding doors with new wood clad to match bottom floor windowsDetails
replace top floor front windows 5 and 2 sliding doors with new wood clad to match bottom floor windows | $8,500 |
| Dec 7, 2023 | Completed final sign-off Jan 2025 | 310 Hill St | Ramirez Roofing Corporation | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,500 |
| Sep 28, 2017 | Completed final sign-off Sep 2018 | 310 Hill St | Bartley Construction | install 3 wood-clad windows at 2nd floor to match 3rd floor windows. apply new ply sheeting, new stucco to ground, 2nd and 3rd floors.Details
install 3 wood-clad windows at 2nd floor to match 3rd floor windows. apply new ply sheeting, new stucco to ground, 2nd and 3rd floors. | $23,000 |
| Jul 5, 2016 | Completed final sign-off Sep 2016 | 310 Hill St | Bartley Construction | replace (e) 3rd floor master bathroom, in-kind. replace shower, convert tub and cabinets and floor.Details
replace (e) 3rd floor master bathroom, in-kind. replace shower, convert tub and cabinets and floor. | $14,000 |
| Nov 7, 2008 | Completed final sign-off Jan 2010 | 310 Hill St | rear expansion of home at 2 levels: for kitchen, bedrooms including new rear decks & stair to grade. interior kitchen remodel, add bedroom, remodel bathroom, closet. reconfigure entry stair and front doorDetails
rear expansion of home at 2 levels: for kitchen, bedrooms including new rear decks & stair to grade. interior kitchen remodel, add bedroom, remodel bathroom, closet. reconfigure entry stair and front door | $165,000 | |
| Jun 9, 2005 | Never finaled issued Jun 2005, no final | 310 Hill St | Bartley Construction | remove 2 existing baths on 2nd flr. remove tile, sheet, fixtures, and replace with new. remove 1/2"Details
remove 2 existing baths on 2nd flr. remove tile, sheet, fixtures, and replace with new. remove 1/2" | $12,600 |
| Jun 30, 2003 | Completed final sign-off Jul 2003 | 310 Hill St | renew app#200211252171 & 200212274269 for final inspectionDetails
renew app#200211252171 & 200212274269 for final inspection | ||
| Dec 27, 2002 | Completed final sign-off Jul 2003 | 310 Hill St | replace 4 aluminum windows & 2 sliding doors in the front deck.Details
replace 4 aluminum windows & 2 sliding doors in the front deck. | $3,000 | |
| Nov 25, 2002 | Never finaled issued Nov 2002, no final | 310 Hill St | dry rot repairDetails
dry rot repair | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.