Back to kitchen remodel contractors
Barry M Nadell Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Oct 2003 to Mar 2019
- Last 24 months
- 0 permits filed
55 permits since 2000: 43 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 6 days from filing to permit and 683 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2014 | Completed final sign-off Aug 2016 | 572 Eureka St | remove bearing wall at 2nd flr, relocate powder room at 2nd flr, revise foundation details approved on pa 201305217500, remodel kitchenDetails
remove bearing wall at 2nd flr, relocate powder room at 2nd flr, revise foundation details approved on pa 201305217500, remodel kitchen | $70,000 |
| Jul 25, 2012 | Never finaled issued Jul 2012, no final | 2009 Vallejo St | apt #1 - install new conc ret wall @ garage & 2nd floor (not visible form street), lower existing 2nd floor by 14 inches. relcoate two bedroom to 2nd floor & kitchen & living room to 3rd floor. remodeled kitchen & bathroom.Details
apt #1 - install new conc ret wall @ garage & 2nd floor (not visible form street), lower existing 2nd floor by 14 inches. relcoate two bedroom to 2nd floor & kitchen & living room to 3rd floor. remodeled kitchen & bathroom. | $40,000 |
| Feb 23, 2012 | Completed final sign-off Feb 2015 | 1 Spruce St | interior remodel & horizontal addition @ rear on 1st & 2nd stories. includes: 1st (e) garage - renovated, 3 bedrooms & 3 baths & playroom. 2nd: kitchen, living, dining, den, office & bath.Details
interior remodel & horizontal addition @ rear on 1st & 2nd stories. includes: 1st (e) garage - renovated, 3 bedrooms & 3 baths & playroom. 2nd: kitchen, living, dining, den, office & bath. | $300,000 |
| Apr 1, 2011 | Completed final sign-off Jun 2014 | 463 Eureka St | enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck.Details
enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck. | $105,000 |
| Oct 16, 2008 | Completed final sign-off Mar 2009 | 722 21st Av | replace cabinet & install diswasher under cabinet, install two new elect circuits in kitchen & bathrm, remove partition wall at toilet, move existing toilet & add sink to make half bath.Details
replace cabinet & install diswasher under cabinet, install two new elect circuits in kitchen & bathrm, remove partition wall at toilet, move existing toilet & add sink to make half bath. | $15,000 |