Barry M Nadell Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Oct 2003 to Mar 2019
- Last 24 months
- 0 permits filed
55 permits since 2000: 43 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 38 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2009 | Completed final sign-off Apr 2009 | 32 Margaret Av | revision to permit#200902202491. replace existing garage door. fix extra dryrot found at deck slider wall and 2nd floor front window wall.Details
revision to permit#200902202491. replace existing garage door. fix extra dryrot found at deck slider wall and 2nd floor front window wall. | $4,000 |
| Feb 20, 2009 | Completed final sign-off Apr 2009 | 32 Margaret Av | remove and replace 4x12 garage header (dry rot) approx 18', existing post to remain. remove dry rot from existing cantilevered joists at small front deck (4x12)Details
remove and replace 4x12 garage header (dry rot) approx 18', existing post to remain. remove dry rot from existing cantilevered joists at small front deck (4x12) | $2,500 |