Back to bathroom remodel contractors
Barry M Nadell Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Oct 2003 to Mar 2019
- Last 24 months
- 0 permits filed
55 permits since 2000: 43 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 15 days from filing to permit and 646 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2017 | Completed final sign-off Feb 2019 | 3026 Clay St | interior remodel addition of conditioned space, to a sfincluding a remodel of the 1st flr utility space to include a new workshop,storage room, bathroom & family rm, interior (e) garageDetails
interior remodel addition of conditioned space, to a sfincluding a remodel of the 1st flr utility space to include a new workshop,storage room, bathroom & family rm, interior (e) garage | $148,500 |
| Sep 12, 2014 | Completed final sign-off Aug 2016 | 572 Eureka St | convert (e) basement storage & mech space into habitable space 757 s.f. contain bedroom, bathroom, media room, & storage. add new wondows and door at rear facade. add new open stair to new basement space , add opening w/guardrail below 1st & 2nd floor.Details
convert (e) basement storage & mech space into habitable space 757 s.f. contain bedroom, bathroom, media room, & storage. add new wondows and door at rear facade. add new open stair to new basement space , add opening w/guardrail below 1st & 2nd floor. | $40,000 |
| Jun 23, 2014 | Completed final sign-off Mar 2015 | 335 Surrey St | add family room, bedroom & full bath @ basement and with stair to ground floorDetails
add family room, bedroom & full bath @ basement and with stair to ground floor | $30,000 |
| Jul 25, 2012 | Never finaled issued Jul 2012, no final | 2009 Vallejo St | apt #1 - install new conc ret wall @ garage & 2nd floor (not visible form street), lower existing 2nd floor by 14 inches. relcoate two bedroom to 2nd floor & kitchen & living room to 3rd floor. remodeled kitchen & bathroom.Details
apt #1 - install new conc ret wall @ garage & 2nd floor (not visible form street), lower existing 2nd floor by 14 inches. relcoate two bedroom to 2nd floor & kitchen & living room to 3rd floor. remodeled kitchen & bathroom. | $40,000 |
| Feb 23, 2012 | Completed final sign-off Feb 2015 | 1 Spruce St | interior remodel & horizontal addition @ rear on 1st & 2nd stories. includes: 1st (e) garage - renovated, 3 bedrooms & 3 baths & playroom. 2nd: kitchen, living, dining, den, office & bath.Details
interior remodel & horizontal addition @ rear on 1st & 2nd stories. includes: 1st (e) garage - renovated, 3 bedrooms & 3 baths & playroom. 2nd: kitchen, living, dining, den, office & bath. | $300,000 |
| Apr 1, 2011 | Completed final sign-off Jun 2014 | 463 Eureka St | enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck.Details
enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck. | $105,000 |
| Oct 16, 2008 | Completed final sign-off Mar 2009 | 722 21st Av | replace cabinet & install diswasher under cabinet, install two new elect circuits in kitchen & bathrm, remove partition wall at toilet, move existing toilet & add sink to make half bath.Details
replace cabinet & install diswasher under cabinet, install two new elect circuits in kitchen & bathrm, remove partition wall at toilet, move existing toilet & add sink to make half bath. | $15,000 |