Bail Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2019 to Sep 2026
- Last 24 months
- 28 permits filed
39 permits since 2000: 34 completed, 2 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 16 completed, 2 in progress. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 882 Florida St | to comply with nov's:202656184,202662070 and 202662102, remove damaged paint and paint the exterior, repair 2 ceiling holes in unit 1. (bathroom) replace water source in unit 1, install tub on shower in unit 1 . repair dryrot as needed.Details
to comply with nov's:202656184,202662070 and 202662102, remove damaged paint and paint the exterior, repair 2 ceiling holes in unit 1. (bathroom) replace water source in unit 1, install tub on shower in unit 1 . repair dryrot as needed. | $15,000 |
| Sep 4, 2026 | In progress issued Sep 2026 | 1807 Divisadero St | ground floor- interior soft demo followed by (n) non bearing partitions, finishes and casework and remodel (e) bathroomDetails
ground floor- interior soft demo followed by (n) non bearing partitions, finishes and casework and remodel (e) bathroom | $350,000 |
| Apr 21, 2026 | Completed final sign-off Jun 2026 | 397 Mangels Av | revision to permit#202604139344. add a new second floor bathroom, replace 10 windows in kind, demo fire place.Details
revision to permit#202604139344. add a new second floor bathroom, replace 10 windows in kind, demo fire place. | $15,000 |
| Apr 13, 2026 | Completed final sign-off Jun 2026 | 397 Mangels Av | convert garage into habitable area to include bedroom, family room, bathroom, and wetbar. no structrual work.Details
convert garage into habitable area to include bedroom, family room, bathroom, and wetbar. no structrual work. | $65,000 |
| Apr 13, 2026 | Completed final sign-off Jun 2026 | 397 Mangels Av | remodel one kitchen and one bathroom in kind at the second floor. no structural work - no wall or framing modifications.Details
remodel one kitchen and one bathroom in kind at the second floor. no structural work - no wall or framing modifications. | $45,000 |
| Apr 9, 2026 | Completed final sign-off Jul 2026 | 677 Spruce St | remodel one kitchen and one bathroom in-kind. rewire 3 rooms, kitchen and bathroom. install two vinyl windows in-kind at the lightwell. install new insulation and new drywall.Details
remodel one kitchen and one bathroom in-kind. rewire 3 rooms, kitchen and bathroom. install two vinyl windows in-kind at the lightwell. install new insulation and new drywall. | $55,000 |
| Apr 9, 2026 | Completed final sign-off May 2026 | 686 19th Av | remodel one bathroom in-kind at the 3rd floor. remove ceiling and walls, plaster cover at the two front bedrooms and rewire, insulation drywall and paint.Details
remodel one bathroom in-kind at the 3rd floor. remove ceiling and walls, plaster cover at the two front bedrooms and rewire, insulation drywall and paint. | $25,000 |
| Dec 8, 2025 | Completed final sign-off Mar 2026 | 146 Rose St | unit 148- remodel kitchen and bathroom in kind, remove all plaster from ceiling and walls due to smell and dryrot. not movement of walls. rewire the entire unit. install 6 vinyl windows in kind at the rear and lightwell. install (n) insulation, drywall, flooring and paint.Details
unit 148- remodel kitchen and bathroom in kind, remove all plaster from ceiling and walls due to smell and dryrot. not movement of walls. rewire the entire unit. install 6 vinyl windows in kind at the rear and lightwell. install (n) insulation, drywall, flooring and paint. | $70,000 |
| Oct 30, 2025 | Completed final sign-off Jan 2026 | 1307 Stevenson St | remodel one kitchen and one bathroom in kind. rewire (2) rooms kitchen and bathroom. install (4) vinyl windows in kind on the rear. install new flooring and paint. u-factor 0.3 max.Details
remodel one kitchen and one bathroom in kind. rewire (2) rooms kitchen and bathroom. install (4) vinyl windows in kind on the rear. install new flooring and paint. u-factor 0.3 max. | $45,000 |
| Aug 29, 2025 | Completed final sign-off Feb 2026 | 1630 09th Av | renovate e) bath, turn e) water closet into full bath, removing wall between. remodel kitchen, open wall to breakfast area, add skylights at bath, infill interior lightwell at bathDetails
renovate e) bath, turn e) water closet into full bath, removing wall between. remodel kitchen, open wall to breakfast area, add skylights at bath, infill interior lightwell at bath | $125,000 |
| Aug 28, 2025 | Completed final sign-off Jan 2026 | 146 Rose St | unit 146- remodel kitchen and bathroom in kind, remove all plaster from ceiling and walls due to smell and dryrot. rewire the entire unit. install 6 vinyl windows in kind at the rear and lightwell. install (n) insulation, drywall, flooring and paint.Details
unit 146- remodel kitchen and bathroom in kind, remove all plaster from ceiling and walls due to smell and dryrot. rewire the entire unit. install 6 vinyl windows in kind at the rear and lightwell. install (n) insulation, drywall, flooring and paint. | $65,000 |
| Aug 25, 2025 | Completed final sign-off Jun 2026 | 1750 Mission St | unit 10- remodel kitchen and bathroom in kind. rewire the entire unit. install 4 vinyl windows in kind at the rear and front windows. install (n) insulation, drywall 5/8 type x 500 sq (n) flooring and paint. unit 20- replace 3 windows in kind and rear siding due to fire damage. visible from streetDetails
unit 10- remodel kitchen and bathroom in kind. rewire the entire unit. install 4 vinyl windows in kind at the rear and front windows. install (n) insulation, drywall 5/8 type x 500 sq (n) flooring and paint. unit 20- replace 3 windows in kind and rear siding due to fire damage. visible from street | $45,000 |
| Feb 12, 2025 | Completed final sign-off Jul 2025 | 146 Rose St | unit#154: remodel one kitchen & one bathroom in kind. remove all ceiling & walls. plaster cover due to smell of dryrot. re-wire the entire unit. install 10 vinyl windows in kind (windows: 3-front of house, lightwell,left side of bldg). install new insulation, drywall, new flooring and paint. uf<=0.3Details
unit#154: remodel one kitchen & one bathroom in kind. remove all ceiling & walls. plaster cover due to smell of dryrot. re-wire the entire unit. install 10 vinyl windows in kind (windows: 3-front of house, lightwell,left side of bldg). install new insulation, drywall, new flooring and paint. uf<=0.3 | $50,000 |
| Feb 12, 2025 | Completed final sign-off Jul 2025 | 146 Rose St | unit #152 - kitchen remodel in kind, rewire the entire unit. install 10 vinyl windows, new flooring and paint. unit #156 - remodel one kitchen and one bathroom in kind. rewire the entire unit. install 10 vinyl windows in kind. new flooring and paint. uf<=0.3Details
unit #152 - kitchen remodel in kind, rewire the entire unit. install 10 vinyl windows, new flooring and paint. unit #156 - remodel one kitchen and one bathroom in kind. rewire the entire unit. install 10 vinyl windows in kind. new flooring and paint. uf<=0.3 | $80,000 |
| Dec 16, 2024 | Completed final sign-off Mar 2025 | 339 16th Av | remodel 2 (e) bathrooms in kind on the 3rd fl. and install new recessed lights and new outlets in the 4 bedrooms on the 3rd fl.Details
remodel 2 (e) bathrooms in kind on the 3rd fl. and install new recessed lights and new outlets in the 4 bedrooms on the 3rd fl. | $30,000 |
| Aug 5, 2024 | Completed final sign-off Jan 2025 | 840 Florida St | to comply with nov # 202417588 & 202417591 remodel kitchen & 2 bathrooms in kind. replace 4 windows in rear to vinyl. rewire entire unit. (n) floors & paint repair rear stairs in kind <50% in kindDetails
to comply with nov # 202417588 & 202417591 remodel kitchen & 2 bathrooms in kind. replace 4 windows in rear to vinyl. rewire entire unit. (n) floors & paint repair rear stairs in kind <50% in kind | $50,000 |
| Jul 20, 2021 | Completed final sign-off May 2022 | 762 Faxon Av | replace extg kitchen sink, range, bathroom, vanity, toilet and tub with in kind. no change of utility locations.Details
replace extg kitchen sink, range, bathroom, vanity, toilet and tub with in kind. no change of utility locations. | $3,000 |
| May 13, 2021 | Completed final sign-off Dec 2024 | 775 26th Av | addition of (n) unit on ground level per density; in-fill area under 2nd fl deck to create (n) dwelling unit at 1st fl conforming with allowable 2 unit density. unit to include 1 bedroom, 1 bathroom & kitchen.Details
addition of (n) unit on ground level per density; in-fill area under 2nd fl deck to create (n) dwelling unit at 1st fl conforming with allowable 2 unit density. unit to include 1 bedroom, 1 bathroom & kitchen. | $187,000 |