Bail Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2019 to Sep 2026
- Last 24 months
- 28 permits filed
39 permits since 2000: 34 completed, 2 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 0 days from filing to permit and 177 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2026 | Completed final sign-off Jun 2026 | 1437 Quesada Av | to comply with nov 202546379: repair rear stairs less than 50%, siding repair like for like, back of bldg, replace 3 windows at rear, repair 80 sq ft joists se area 1st flr. nothing street visible. install tankless water heater at rear.Details
to comply with nov 202546379: repair rear stairs less than 50%, siding repair like for like, back of bldg, replace 3 windows at rear, repair 80 sq ft joists se area 1st flr. nothing street visible. install tankless water heater at rear. | $10,000 |
| Oct 25, 2024 | Completed final sign-off Sep 2026 | 1808 Newhall St | 1/f: adding kitchen and closing the unit or adding a door to the main stair of the house main entrance to this unit would be from the east. conversion to an accessory dwelling unit. 2/f: in the back of the house adding two rooms on the front adds a room.Details
1/f: adding kitchen and closing the unit or adding a door to the main stair of the house main entrance to this unit would be from the east. conversion to an accessory dwelling unit. 2/f: in the back of the house adding two rooms on the front adds a room. | $25,000 |
| Aug 5, 2024 | Completed final sign-off Jan 2025 | 840 Florida St | to comply with nov # 202417588 & 202417591 remodel kitchen & 2 bathrooms in kind. replace 4 windows in rear to vinyl. rewire entire unit. (n) floors & paint repair rear stairs in kind <50% in kindDetails
to comply with nov # 202417588 & 202417591 remodel kitchen & 2 bathrooms in kind. replace 4 windows in rear to vinyl. rewire entire unit. (n) floors & paint repair rear stairs in kind <50% in kind | $50,000 |