Bai Construction
- Based in
- Orinda
- On San Francisco permits
- Mar 2014 to Sep 2026
- Last 24 months
- 6 permits filed
297 permits since 2000: 265 completed, 2 in progress, 17 never finaled, 13 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 13 are 5 to 10 years old, 1 is over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 1 in progress, 1 expired or cancelled. Typically 2 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 3691 Market St | replace kitchen cabinetry. remove non-bearing walls in kitchen and bathroom. reconfigure existing bathroom. install washer/dryer. replace bathroom door. kitchen sink stays at same location with new kitchen faucet. bathroom faucet and shower fixture will be replaced. no increase in plumbing fixtures.Details
replace kitchen cabinetry. remove non-bearing walls in kitchen and bathroom. reconfigure existing bathroom. install washer/dryer. replace bathroom door. kitchen sink stays at same location with new kitchen faucet. bathroom faucet and shower fixture will be replaced. no increase in plumbing fixtures. | $20,000 |
| Aug 15, 2025 | Completed final sign-off Aug 2026 | 2100 Van Ness Av | voluntary strenghthening new plywood and lateral ties at roof and new lateral ties at mezzanine, legalize ada bath on the 1st floor and add power door operator in the front door.Details
voluntary strenghthening new plywood and lateral ties at roof and new lateral ties at mezzanine, legalize ada bath on the 1st floor and add power door operator in the front door. | $150,000 |
| Jul 14, 2022 | Completed final sign-off Aug 2022 | 1328 Hyde St | unit #2: one bathroom remodel. replace bath fixtures only. kitchen sink replacement. all in-kind.Details
unit #2: one bathroom remodel. replace bath fixtures only. kitchen sink replacement. all in-kind. | $10,000 |
| Mar 8, 2022 | Completed final sign-off Mar 2022 | 115 Henry St | bathroom remodel. no change to location of fixtures. only replace (e) fixtures. (n) flooring, tiles. no wall or layout changes.Details
bathroom remodel. no change to location of fixtures. only replace (e) fixtures. (n) flooring, tiles. no wall or layout changes. | $2,000 |
| Nov 3, 2020 | Completed final sign-off Apr 2021 | 1301 Stockton St | revision to pa #201809140258 - relocate new steel columns and ada bathroomDetails
revision to pa #201809140258 - relocate new steel columns and ada bathroom | |
| May 10, 2019 | Completed final sign-off Feb 2020 | 1355 Stockton St | add 2 baths, add new walls and infill new floor inthe 1st floor.Details
add 2 baths, add new walls and infill new floor inthe 1st floor. | $120,000 |
| Apr 13, 2018 | Completed final sign-off Jan 2019 | 400 Broadway | revision to 201708043989 and 201708043990. 1st flr. commercial space. add new concrete footing and new floor joist. relocate shear walls and footings. add 3 ada compliant bathroom. spaces remains vacant & separate ti permit.Details
revision to 201708043989 and 201708043990. 1st flr. commercial space. add new concrete footing and new floor joist. relocate shear walls and footings. add 3 ada compliant bathroom. spaces remains vacant & separate ti permit. | $10 |
| Jan 30, 2017 | Expired or cancelled cancelled Mar 2017 | 864 Greenwich St | build out adu, bathroom kit, sutdio sleep hire room, egress ahll extension per ordinance no# 162.16.Details
build out adu, bathroom kit, sutdio sleep hire room, egress ahll extension per ordinance no# 162.16. | $70,000 |
| Mar 8, 2016 | Completed final sign-off Jul 2016 | 65 Guerrero St | interior alteration replace extg 3 bath and kitchen in kind without altering size and rooms. no alteration of wall, window and door.Details
interior alteration replace extg 3 bath and kitchen in kind without altering size and rooms. no alteration of wall, window and door. | $10,000 |