Bai Construction
- Based in
- Orinda
- On San Francisco permits
- Mar 2014 to Sep 2026
- Last 24 months
- 6 permits filed
297 permits since 2000: 265 completed, 2 in progress, 17 never finaled, 13 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 13 are 5 to 10 years old, 1 is over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 7 completed, 1 expired or cancelled. Typically 4 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2022 | Expired or cancelled cancelled Jan 2026 | 2171 Pacific Av | (e) 2 decks replace in-kind. update cost of construction. work previously completed.Details
(e) 2 decks replace in-kind. update cost of construction. work previously completed. | $61,800 |
| Nov 3, 2020 | Completed final sign-off Jun 2021 | 258 Red Rock Wy | less than 50% repair of front existing wood decks (2)Details
less than 50% repair of front existing wood decks (2) | $20,000 |
| Dec 27, 2019 | Completed final sign-off Jun 2020 | 1730 Vallejo St | repair wood deck in the rear of the building to comply with nov 201906282Details
repair wood deck in the rear of the building to comply with nov 201906282 | $35,000 |
| Nov 21, 2019 | Completed final sign-off Oct 2020 | 1301 Stockton St | portion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replaceDetails
portion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replace | $70,000 |
| Dec 17, 2018 | Completed final sign-off Feb 2019 | 215 Crestmont Dr | repair in kind 2 deck at rear of building < 50%Details
repair in kind 2 deck at rear of building < 50% | $10,000 |
| Sep 24, 2018 | Completed final sign-off Nov 2018 | 2171 Pacific Av | repair/replace (e) middle deck at roof, in kind w/ pt wood. no more than 50%Details
repair/replace (e) middle deck at roof, in kind w/ pt wood. no more than 50% | $5,000 |
| Jul 19, 2017 | Completed final sign-off Aug 2018 | 2010 Pacific Av | repair balcony/deck and guardrail in kind in the rear of the building, 50% of repair or less,Details
repair balcony/deck and guardrail in kind in the rear of the building, 50% of repair or less, | $35,000 |
| Aug 11, 2014 | Completed final sign-off Oct 2014 | 160 Lansdale Av | repair at rear deck by contructing 5 new 16" piers 15' deep, (n) grade beams, columns & floor beam. existing decking & joists and railing to remain.Details
repair at rear deck by contructing 5 new 16" piers 15' deep, (n) grade beams, columns & floor beam. existing decking & joists and railing to remain. | $40,000 |