Bach Construction, Inc.
- Based in
- Burlingame
- On San Francisco permits
- May 2000 to Nov 2023
- Last 24 months
- 0 permits filed
70 permits since 2000: 49 completed, 1 in progress, 12 never finaled, 8 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 20 days from filing to permit and 476 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2018 | Completed final sign-off Jan 2021 | 847 Kansas St | interior remodel: update kitchen and bathrooms. remodel kitchen, family room , bathroom on main flr, new stairs to lower floors. lower floor remodel master bedroom, bath, closet and laundry room.Details
interior remodel: update kitchen and bathrooms. remodel kitchen, family room , bathroom on main flr, new stairs to lower floors. lower floor remodel master bedroom, bath, closet and laundry room. | $225,000 |
| Sep 28, 2016 | Never finaled issued Oct 2016, no final | 50 Thomas More Wy | revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam.Details
revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam. | |
| Jun 18, 2013 | Completed final sign-off Nov 2013 | 826 30th Av | demolitoin of (e) stairs & landing, (n) construction of wood stairs & landing/1-hr wall @ prop line, (n) construction of roof & skylight, replacement of (e) windows w/tempered glass.Details
demolitoin of (e) stairs & landing, (n) construction of wood stairs & landing/1-hr wall @ prop line, (n) construction of roof & skylight, replacement of (e) windows w/tempered glass. | $15,000 |