Bach Construction, Inc.
- Based in
- Burlingame
- On San Francisco permits
- May 2000 to Nov 2023
- Last 24 months
- 0 permits filed
70 permits since 2000: 49 completed, 1 in progress, 12 never finaled, 8 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 64 days from filing to permit and 375 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2021 | Completed final sign-off Mar 2022 | 2501 Ocean Av | t.i. of 1st and 2nd floors. install 2 (n) bathrooms on first floor and 1 (n) bathrooms on 2nd floor. (e) medical office to remain on 1st floor. 2nd floor change to accounting. mep deferred.Details
t.i. of 1st and 2nd floors. install 2 (n) bathrooms on first floor and 1 (n) bathrooms on 2nd floor. (e) medical office to remain on 1st floor. 2nd floor change to accounting. mep deferred. | $868,803 |
| Dec 11, 2019 | Completed final sign-off Aug 2022 | 564 Bush St | relocate kitchen wall and ele panel, replace bath finishes, fixtures, fittings in kind, replace e wet bar, add doors in e openings between kitchen storage and hallDetails
relocate kitchen wall and ele panel, replace bath finishes, fixtures, fittings in kind, replace e wet bar, add doors in e openings between kitchen storage and hall | $135,000 |
| Mar 16, 2018 | Completed final sign-off Jan 2021 | 847 Kansas St | interior remodel: update kitchen and bathrooms. remodel kitchen, family room , bathroom on main flr, new stairs to lower floors. lower floor remodel master bedroom, bath, closet and laundry room.Details
interior remodel: update kitchen and bathrooms. remodel kitchen, family room , bathroom on main flr, new stairs to lower floors. lower floor remodel master bedroom, bath, closet and laundry room. | $225,000 |
| Mar 16, 2017 | Never finaled issued Jun 2017, no final | 476 24th Av | includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the buildingDetails
includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the building | $575,000 |
| Dec 19, 2013 | Completed final sign-off Dec 2014 | 1142 Shotwell St | bathroom remodel, approximately 40 sq.ft. and no removal of wallsDetails
bathroom remodel, approximately 40 sq.ft. and no removal of walls | $20,000 |
| Mar 14, 2013 | Completed final sign-off Apr 2013 | 332 Gates St | remodel bath - remove & replace (1) sink, (1) toilet, (1) shower, install new flooring & paint, no change on walls.Details
remodel bath - remove & replace (1) sink, (1) toilet, (1) shower, install new flooring & paint, no change on walls. | $10,000 |