B Y U Construction Inc.
- Based in
- Daly City
- On San Francisco permits
- Oct 2011 to Apr 2021
- Last 24 months
- 0 permits filed
25 permits since 2000: 24 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 61 days from filing to permit and 1116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2020 | Completed final sign-off Nov 2022 | 3839 Folsom St | rear yard stair removal, bay window improvements, new dormers, replacement of windows, exterior siding, roofing. no horizontal/vertical addition.Details
rear yard stair removal, bay window improvements, new dormers, replacement of windows, exterior siding, roofing. no horizontal/vertical addition. | $235,651 |
| Oct 31, 2014 | Completed final sign-off Jan 2015 | 199 Quintara St | project replaces dry rot portion of front stair case (no addition & less than 50% of front stair); replace kitchen tile; replace tile in 2 bathrooms.Details
project replaces dry rot portion of front stair case (no addition & less than 50% of front stair); replace kitchen tile; replace tile in 2 bathrooms. | $12,000 |
| Jun 16, 2014 | Completed final sign-off Nov 2018 | 1475 39th Av | revision to pa#201310159301: on g/f- add one bedroom on existing family room area under 2/f family room, reduce existing family room, relocate existing full bath. original 2/f plan no change, original interior stairs to remain (no change).Details
revision to pa#201310159301: on g/f- add one bedroom on existing family room area under 2/f family room, reduce existing family room, relocate existing full bath. original 2/f plan no change, original interior stairs to remain (no change). | |
| Oct 15, 2013 | Completed final sign-off Nov 2018 | 1475 39th Av | new bathroom sink, shower/bath, toilet, relocate (e) laundry sink, new wet bar, relocate washer/dryer, repair/replace (e) stair to code, enclose space under 1st floor at garage level.Details
new bathroom sink, shower/bath, toilet, relocate (e) laundry sink, new wet bar, relocate washer/dryer, repair/replace (e) stair to code, enclose space under 1st floor at garage level. | $78,025 |