B Y U Construction Inc.
- Based in
- Daly City
- On San Francisco permits
- Oct 2011 to Apr 2021
- Last 24 months
- 0 permits filed
25 permits since 2000: 24 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2019 | Completed final sign-off Jan 2020 | 274 10th Av | unit # 2: replace kitchen cabinets in kind and upgrade electrical. convert bathtub to shower, replace vanity and top in kind.Details
unit # 2: replace kitchen cabinets in kind and upgrade electrical. convert bathtub to shower, replace vanity and top in kind. | $18,000 |
| Feb 21, 2019 | Completed final sign-off Jun 2019 | 154 Denslowe Dr | kitchen remodel, cabinets in kind. non structuralDetails
kitchen remodel, cabinets in kind. non structural | $12,000 |
| Feb 21, 2019 | Completed final sign-off May 2019 | 329 25th Av | kitchen remodel non structuralDetails
kitchen remodel non structural | $12,000 |
| Nov 2, 2018 | Completed final sign-off Feb 2019 | 4701 Ocean Av | remodel kitchen and 2 bathroom in kind. replace cabinets, counter, vanity. replace interior finishes w. 5/8 type "x" gyp bd in the kitchen as needed. replace interior finishes w/ dens armor plus in the bathrooms.Details
remodel kitchen and 2 bathroom in kind. replace cabinets, counter, vanity. replace interior finishes w. 5/8 type "x" gyp bd in the kitchen as needed. replace interior finishes w/ dens armor plus in the bathrooms. | $25,000 |
| Dec 30, 2014 | Completed final sign-off Mar 2015 | 1200 Gough St | #8a -revision to pa #201410290238 & 201410179243: wall locations to reflect revised layout. revise kitchen appliance layout & new pony wall @ island. revise bedroom closet layout. relocate laundry doors.Details
#8a -revision to pa #201410290238 & 201410179243: wall locations to reflect revised layout. revise kitchen appliance layout & new pony wall @ island. revise bedroom closet layout. relocate laundry doors. | $2,000 |
| Oct 31, 2014 | Completed final sign-off Jan 2015 | 199 Quintara St | project replaces dry rot portion of front stair case (no addition & less than 50% of front stair); replace kitchen tile; replace tile in 2 bathrooms.Details
project replaces dry rot portion of front stair case (no addition & less than 50% of front stair); replace kitchen tile; replace tile in 2 bathrooms. | $12,000 |
| Oct 29, 2014 | Completed final sign-off Mar 2015 | 1200 Gough St | revision to permit number 201410179243; relocate non load bearing walls at bedroom #1 closet, remove non load bearing walls at kitchen.Details
revision to permit number 201410179243; relocate non load bearing walls at bedroom #1 closet, remove non load bearing walls at kitchen. | $7,500 |
| Oct 17, 2014 | Completed final sign-off Mar 2015 | 1200 Gough St | remodel existing kitchen & 2 existing bathrooms. work limited to replacement of existing fixtures & equipment in existing locations. all new lighting to be high efficacy or on vacancy sensor switchesDetails
remodel existing kitchen & 2 existing bathrooms. work limited to replacement of existing fixtures & equipment in existing locations. all new lighting to be high efficacy or on vacancy sensor switches | $20,000 |