Back to bathroom remodel contractors
B Y U Construction Inc.
- Based in
- Daly City
- On San Francisco permits
- Oct 2011 to Apr 2021
- Last 24 months
- 0 permits filed
25 permits since 2000: 24 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 2 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2018 | Completed final sign-off Feb 2019 | 4701 Ocean Av | add half bath & laundry room in garage levelDetails
add half bath & laundry room in garage level | $15,000 |
| Nov 2, 2018 | Completed final sign-off Feb 2019 | 4701 Ocean Av | remodel kitchen and 2 bathroom in kind. replace cabinets, counter, vanity. replace interior finishes w. 5/8 type "x" gyp bd in the kitchen as needed. replace interior finishes w/ dens armor plus in the bathrooms.Details
remodel kitchen and 2 bathroom in kind. replace cabinets, counter, vanity. replace interior finishes w. 5/8 type "x" gyp bd in the kitchen as needed. replace interior finishes w/ dens armor plus in the bathrooms. | $25,000 |
| Aug 17, 2016 | Never finaled issued Sep 2016, no final | 300 Kansas St | interior lighting title 24 calculations for new bathroom, janitor closet and corridor. ref to 201606240772Details
interior lighting title 24 calculations for new bathroom, janitor closet and corridor. ref to 201606240772 | $5,000 |
| Aug 17, 2016 | Completed final sign-off Jun 2017 | 1333 Jones St | interior renovations to unit 701 - new washer/dryer, convert guest tub to walk-in shower, add new tub in master bath, add new steam generator, new non-rated partitions in master bathroomDetails
interior renovations to unit 701 - new washer/dryer, convert guest tub to walk-in shower, add new tub in master bath, add new steam generator, new non-rated partitions in master bathroom | $60,000 |
| Oct 31, 2014 | Completed final sign-off Jan 2015 | 199 Quintara St | project replaces dry rot portion of front stair case (no addition & less than 50% of front stair); replace kitchen tile; replace tile in 2 bathrooms.Details
project replaces dry rot portion of front stair case (no addition & less than 50% of front stair); replace kitchen tile; replace tile in 2 bathrooms. | $12,000 |
| Oct 17, 2014 | Completed final sign-off Mar 2015 | 1200 Gough St | remodel existing kitchen & 2 existing bathrooms. work limited to replacement of existing fixtures & equipment in existing locations. all new lighting to be high efficacy or on vacancy sensor switchesDetails
remodel existing kitchen & 2 existing bathrooms. work limited to replacement of existing fixtures & equipment in existing locations. all new lighting to be high efficacy or on vacancy sensor switches | $20,000 |
| Jun 16, 2014 | Completed final sign-off Nov 2018 | 1475 39th Av | revision to pa#201310159301: on g/f- add one bedroom on existing family room area under 2/f family room, reduce existing family room, relocate existing full bath. original 2/f plan no change, original interior stairs to remain (no change).Details
revision to pa#201310159301: on g/f- add one bedroom on existing family room area under 2/f family room, reduce existing family room, relocate existing full bath. original 2/f plan no change, original interior stairs to remain (no change). | |
| Oct 15, 2013 | Completed final sign-off Nov 2018 | 1475 39th Av | new bathroom sink, shower/bath, toilet, relocate (e) laundry sink, new wet bar, relocate washer/dryer, repair/replace (e) stair to code, enclose space under 1st floor at garage level.Details
new bathroom sink, shower/bath, toilet, relocate (e) laundry sink, new wet bar, relocate washer/dryer, repair/replace (e) stair to code, enclose space under 1st floor at garage level. | $78,025 |
| Mar 27, 2013 | Completed final sign-off May 2014 | 240 Pope St | revision to pa# 201206283673. convert existing half bathroom to full bath room. enlarge existing playroom (delete existing hallway) on ground floor per plan.Details
revision to pa# 201206283673. convert existing half bathroom to full bath room. enlarge existing playroom (delete existing hallway) on ground floor per plan. |