B K L Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Mar 2012
- Last 24 months
- 0 permits filed
40 permits since 2000: 34 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2011 | Completed final sign-off Jul 2011 | 416 Bartlett St | repair back stairs less then 20%. replace dry rot wood stringer against extg wall and replace damaged hand rail wood post. repair in kind. to comply with his nov#201104742 6/7/11. no structural changes.Details
repair back stairs less then 20%. replace dry rot wood stringer against extg wall and replace damaged hand rail wood post. repair in kind. to comply with his nov#201104742 6/7/11. no structural changes. | $500 |
| Dec 30, 2010 | Completed final sign-off Sep 2011 | 1245 30th Av | add 3 bedrooms, 2 bathrooms, family room at ground floor (garage)tile for front deck and front stairsDetails
add 3 bedrooms, 2 bathrooms, family room at ground floor (garage)tile for front deck and front stairs | $25,000 |
| Feb 2, 2010 | Never finaled issued Feb 2010, no final | 2520 Greenwich St | repair 1st floor stair handrail at back & repair 2nd floor balcony handrail at the back, all work less than 50%Details
repair 1st floor stair handrail at back & repair 2nd floor balcony handrail at the back, all work less than 50% | $2,000 |
| Jan 28, 2002 | Completed final sign-off Apr 2002 | 552 28th Av | up stair kitchen remodling, both room renew all ceiling replacemtnt of sheet rock.re wireing. (totalDetails
up stair kitchen remodling, both room renew all ceiling replacemtnt of sheet rock.re wireing. (total | $11,000 |