Back to kitchen remodel contractors
B K L Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Mar 2012
- Last 24 months
- 0 permits filed
40 permits since 2000: 34 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 never finaled. Typically 0 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2011 | Completed final sign-off Dec 2011 | 63 Nebraska St | renew kitchen on 2nd flr, repl old appliances, replace cabinet, counter, sink, upgrade electrical, ligthing must comply with cec 150(k)Details
renew kitchen on 2nd flr, repl old appliances, replace cabinet, counter, sink, upgrade electrical, ligthing must comply with cec 150(k) | $6,500 |
| Jul 6, 2010 | Completed final sign-off Sep 2010 | 2050 Taylor St | work in unit #2058-replace kitchen cabinets and install new appliance. install wall to enclose as a heater and water heater room. 2nd flDetails
work in unit #2058-replace kitchen cabinets and install new appliance. install wall to enclose as a heater and water heater room. 2nd fl | $12,000 |
| Jun 1, 2010 | Completed final sign-off Dec 2010 | 318 06th Av | remodel kitchen, remove partition wall between dining and kitchen. add full bath room at 3rd level.Details
remodel kitchen, remove partition wall between dining and kitchen. add full bath room at 3rd level. | $12,000 |
| Aug 14, 2007 | Completed final sign-off Oct 2007 | 2050 Taylor St | replace ktichen cabient,new sink, new faucet, new tile floor. relocate water heater within kitchen area for unit above basement, replace the existing floor heat to install a new central heat in basement for unit above basement.Details
replace ktichen cabient,new sink, new faucet, new tile floor. relocate water heater within kitchen area for unit above basement, replace the existing floor heat to install a new central heat in basement for unit above basement. | $9,000 |
| Jun 1, 2007 | Completed final sign-off Feb 2008 | 477 46th Av | upgrade (e) kitchen (e) bathroom tiles replacement, replace plumbing fixtures (aka bathrooom remodel). replace (e) skylightDetails
upgrade (e) kitchen (e) bathroom tiles replacement, replace plumbing fixtures (aka bathrooom remodel). replace (e) skylight | $14,000 |
| May 30, 2007 | Completed final sign-off Jul 2007 | 2056 Taylor St | replace cabinets on the kitchen, one kitchen remodel. new countertop & flooring, new sink, (new appliances, non structural. renovtion to comply with title 24 energy codes.Details
replace cabinets on the kitchen, one kitchen remodel. new countertop & flooring, new sink, (new appliances, non structural. renovtion to comply with title 24 energy codes. | $4,000 |
| Mar 1, 2005 | Completed final sign-off Feb 2006 | 482 46th Av | (e) kitchen cabinets replacement, and (e) bathroom tiles replacement.Details
(e) kitchen cabinets replacement, and (e) bathroom tiles replacement. | $6,500 |
| Aug 16, 2004 | Completed final sign-off Nov 2004 | 1456 Sacramento St | kitchen remodeling- replace plaster of sheetrock on the ceiling & walls. replace existing cabs, instDetails
kitchen remodeling- replace plaster of sheetrock on the ceiling & walls. replace existing cabs, inst | $4,500 |
| Jun 3, 2003 | Completed final sign-off Jul 2003 | 1456 Sacramento St | kitchen, re-cabinets & replaster in the kitchenDetails
kitchen, re-cabinets & replaster in the kitchen | $5,000 |
| Dec 6, 2002 | Never finaled issued Dec 2002, no final | 2445 Vicente St | kitchen remodelingDetails
kitchen remodeling | $7,000 |
| Jan 28, 2002 | Completed final sign-off Apr 2002 | 552 28th Av | up stair kitchen remodling, both room renew all ceiling replacemtnt of sheet rock.re wireing. (totalDetails
up stair kitchen remodling, both room renew all ceiling replacemtnt of sheet rock.re wireing. (total | $11,000 |