B K L Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Mar 2012
- Last 24 months
- 0 permits filed
40 permits since 2000: 34 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2012 | Never finaled issued Mar 2012, no final | 931 Ocean Av | repair dry-rot at the back wall of the house the area about 8'x11'Details
repair dry-rot at the back wall of the house the area about 8'x11' | $1,000 |
| Oct 3, 2011 | Completed final sign-off Dec 2011 | 63 Nebraska St | renew kitchen on 2nd flr, repl old appliances, replace cabinet, counter, sink, upgrade electrical, ligthing must comply with cec 150(k)Details
renew kitchen on 2nd flr, repl old appliances, replace cabinet, counter, sink, upgrade electrical, ligthing must comply with cec 150(k) | $6,500 |
| Jul 26, 2011 | Completed final sign-off Aug 2011 | 327 Kirkham St | install new 1" x 10" pipe siding over the existing plywood siding on west wall (side wall) size of 46' x8'.Details
install new 1" x 10" pipe siding over the existing plywood siding on west wall (side wall) size of 46' x8'. | $4,000 |
| Jun 22, 2011 | Completed final sign-off Jul 2011 | 416 Bartlett St | repair back stairs less then 20%. replace dry rot wood stringer against extg wall and replace damaged hand rail wood post. repair in kind. to comply with his nov#201104742 6/7/11. no structural changes.Details
repair back stairs less then 20%. replace dry rot wood stringer against extg wall and replace damaged hand rail wood post. repair in kind. to comply with his nov#201104742 6/7/11. no structural changes. | $500 |
| Feb 22, 2011 | Completed final sign-off Jun 2011 | 63 Nebraska St | remodel a bathroom on 2/f no change to walls, windows, doors. lighting to comply with cec150(k)Details
remodel a bathroom on 2/f no change to walls, windows, doors. lighting to comply with cec150(k) | $5,000 |
| Dec 30, 2010 | Completed final sign-off Sep 2011 | 1245 30th Av | add 3 bedrooms, 2 bathrooms, family room at ground floor (garage)tile for front deck and front stairsDetails
add 3 bedrooms, 2 bathrooms, family room at ground floor (garage)tile for front deck and front stairs | $25,000 |
| Jul 6, 2010 | Completed final sign-off Sep 2010 | 2050 Taylor St | work in unit #2058-replace kitchen cabinets and install new appliance. install wall to enclose as a heater and water heater room. 2nd flDetails
work in unit #2058-replace kitchen cabinets and install new appliance. install wall to enclose as a heater and water heater room. 2nd fl | $12,000 |
| Jul 1, 2010 | Completed final sign-off Dec 2010 | 318 06th Av | replace 6 front wall windows use wood windows (windsor) to match the (e) windows, same size u-factor 0.40 maxDetails
replace 6 front wall windows use wood windows (windsor) to match the (e) windows, same size u-factor 0.40 max | $3,500 |
| Jun 1, 2010 | Completed final sign-off Dec 2010 | 318 06th Av | remodel kitchen, remove partition wall between dining and kitchen. add full bath room at 3rd level.Details
remodel kitchen, remove partition wall between dining and kitchen. add full bath room at 3rd level. | $12,000 |
| Feb 25, 2010 | Completed final sign-off Jul 2010 | 885 Noriega St | remodeling 2-bathrooms on 2nd. floor. in-kind, non-structural.Details
remodeling 2-bathrooms on 2nd. floor. in-kind, non-structural. | $1,200 |
| Feb 2, 2010 | Never finaled issued Feb 2010, no final | 2520 Greenwich St | repair 1st floor stair handrail at back & repair 2nd floor balcony handrail at the back, all work less than 50%Details
repair 1st floor stair handrail at back & repair 2nd floor balcony handrail at the back, all work less than 50% | $2,000 |
| Jan 15, 2010 | Completed final sign-off Feb 2010 | 2056 Taylor St | install a 10 ft. wall to enclose asa heating room next to the water heater on 3rd. floor.Details
install a 10 ft. wall to enclose asa heating room next to the water heater on 3rd. floor. | $1,000 |
| May 14, 2008 | Completed final sign-off Sep 2008 | 1259 34th Av | remodel rooms at ground floor, convert (e) game room to family room, (e) storage into a new bath and new closet; (e) family into storageDetails
remodel rooms at ground floor, convert (e) game room to family room, (e) storage into a new bath and new closet; (e) family into storage | $30,000 |
| Aug 14, 2007 | Completed final sign-off Oct 2007 | 2050 Taylor St | replace ktichen cabient,new sink, new faucet, new tile floor. relocate water heater within kitchen area for unit above basement, replace the existing floor heat to install a new central heat in basement for unit above basement.Details
replace ktichen cabient,new sink, new faucet, new tile floor. relocate water heater within kitchen area for unit above basement, replace the existing floor heat to install a new central heat in basement for unit above basement. | $9,000 |
| Jun 1, 2007 | Completed final sign-off Feb 2008 | 477 46th Av | upgrade (e) kitchen (e) bathroom tiles replacement, replace plumbing fixtures (aka bathrooom remodel). replace (e) skylightDetails
upgrade (e) kitchen (e) bathroom tiles replacement, replace plumbing fixtures (aka bathrooom remodel). replace (e) skylight | $14,000 |
| May 30, 2007 | Completed final sign-off Jul 2007 | 2056 Taylor St | replace cabinets on the kitchen, one kitchen remodel. new countertop & flooring, new sink, (new appliances, non structural. renovtion to comply with title 24 energy codes.Details
replace cabinets on the kitchen, one kitchen remodel. new countertop & flooring, new sink, (new appliances, non structural. renovtion to comply with title 24 energy codes. | $4,000 |
| Jun 9, 2006 | Completed final sign-off Feb 2007 | 1639 18th Av | remodeling of first floor of a single family dwelling, addition of a rear deck ( + 250 sf), horizontal addition, electrical & plumbing & mechanical under separate permitDetails
remodeling of first floor of a single family dwelling, addition of a rear deck ( + 250 sf), horizontal addition, electrical & plumbing & mechanical under separate permit | $28,000 |
| Mar 10, 2006 | Completed final sign-off Sep 2006 | 1922 30th Av | build new bedroom, bathroom & family room in (e) garage level.Details
build new bedroom, bathroom & family room in (e) garage level. | $40,000 |
| Jun 24, 2005 | Expired or cancelled expired Apr 2009 | 151 Lansdale Av | ground floor bathroom tile replacement; upstair bathroom tile replacementDetails
ground floor bathroom tile replacement; upstair bathroom tile replacement | $2,500 |
| Mar 15, 2005 | Completed final sign-off May 2005 | 3040 Taraval St | put 1 inch concrete over the extg kchn floor to make it smoothDetails
put 1 inch concrete over the extg kchn floor to make it smooth | $5,000 |
| Mar 1, 2005 | Completed final sign-off Feb 2006 | 482 46th Av | (e) kitchen cabinets replacement, and (e) bathroom tiles replacement.Details
(e) kitchen cabinets replacement, and (e) bathroom tiles replacement. | $6,500 |
| Aug 16, 2004 | Completed final sign-off Nov 2004 | 1456 Sacramento St | kitchen remodeling- replace plaster of sheetrock on the ceiling & walls. replace existing cabs, instDetails
kitchen remodeling- replace plaster of sheetrock on the ceiling & walls. replace existing cabs, inst | $4,500 |
| Jan 30, 2004 | Never finaled issued Jan 2004, no final | 1334 44th Av | rev. to appl#200311210883 change laryout & add bathDetails
rev. to appl#200311210883 change laryout & add bath | $7,000 |
| Sep 10, 2003 | Completed final sign-off Nov 2003 | 1230 41st Av | replace part of the sidings of the bldg new siding not visible from street approx 4000 sq ft ofDetails
replace part of the sidings of the bldg new siding not visible from street approx 4000 sq ft of | $15,000 |
| Jun 3, 2003 | Completed final sign-off Jul 2003 | 1456 Sacramento St | kitchen, re-cabinets & replaster in the kitchenDetails
kitchen, re-cabinets & replaster in the kitchen | $5,000 |
| Feb 25, 2003 | Completed final sign-off Mar 2003 | 518 37th Av | driveway renew 3 1/2 min conc 566Details
driveway renew 3 1/2 min conc 566 | $3,000 |
| Dec 6, 2002 | Never finaled issued Dec 2002, no final | 2445 Vicente St | kitchen remodelingDetails
kitchen remodeling | $7,000 |
| Nov 4, 2002 | Completed final sign-off Nov 2002 | 226 19th Av | add deck 12x17 at back yard off of unit#2Details
add deck 12x17 at back yard off of unit#2 | $3,000 |
| Oct 18, 2002 | Completed final sign-off Mar 2003 | 518 37th Av | remodel storage rm, bathrm, bedrm and laundry rm at g/fDetails
remodel storage rm, bathrm, bedrm and laundry rm at g/f | $20,000 |
| Apr 22, 2002 | Expired or cancelled expired Oct 2002 | 552 28th Av | proposed upper flr.remodel one bathrm. & convert one toilet room into a bathrm. alternate some partiDetails
proposed upper flr.remodel one bathrm. & convert one toilet room into a bathrm. alternate some parti | $10,000 |
| Jan 28, 2002 | Completed final sign-off Apr 2002 | 552 28th Av | up stair kitchen remodling, both room renew all ceiling replacemtnt of sheet rock.re wireing. (totalDetails
up stair kitchen remodling, both room renew all ceiling replacemtnt of sheet rock.re wireing. (total | $11,000 |
| Jan 7, 2002 | Completed final sign-off Apr 2002 | 552 28th Av | proposed to add 1 bed rm, 1 family rm, 1 bathrm. relocated washer & dryer furnice & water heaterDetails
proposed to add 1 bed rm, 1 family rm, 1 bathrm. relocated washer & dryer furnice & water heater | $12,000 |
| Oct 26, 2001 | Completed final sign-off Jan 2002 | 2318 40th Av | g/f construct 2 bedroom, 1 bath & 1 storage room at grund floor area per plans.Details
g/f construct 2 bedroom, 1 bath & 1 storage room at grund floor area per plans. | $16,000 |
| Jun 7, 2001 | Completed final sign-off Aug 2001 | 1787 33rd Av | proposed ground floor added:2 bedrm, 1bathrm ,1 laundry & storage rm. relocate one & add one window.Details
proposed ground floor added:2 bedrm, 1bathrm ,1 laundry & storage rm. relocate one & add one window. | $12,000 |
| May 25, 2001 | Completed final sign-off Aug 2001 | 1882 38th Av | add @ 1 bedrm, 1 bathrm, replace one window, add 1 windowDetails
add @ 1 bedrm, 1 bathrm, replace one window, add 1 window | $10,000 |
| Jan 12, 2001 | Completed final sign-off Mar 2001 | 4020 Noriega St | construct 1 bathrm, 1 bedrm, 1 storage rm. & 1 family rm at g/floor areaDetails
construct 1 bathrm, 1 bedrm, 1 storage rm. & 1 family rm at g/floor area | $12,000 |
| Nov 7, 2000 | Completed final sign-off Jan 2001 | 809 Delano Av | add 1 bathrm, 1 family rm, 1 bedrm & 1 study rm at ground floor area.relocate furnance & water heateDetails
add 1 bathrm, 1 family rm, 1 bedrm & 1 study rm at ground floor area.relocate furnance & water heate | $12,000 |
| Aug 17, 2000 | Completed final sign-off Oct 2000 | 51 Forest View Dr | reroofingDetails
reroofing | $2,000 |
| Jun 9, 2000 | Completed final sign-off Aug 2000 | 1779 33rd Av | construct 1 bthrm/1 storage rm/1 family rm/lndry rm /1 bdrm at ground floorDetails
construct 1 bthrm/1 storage rm/1 family rm/lndry rm /1 bdrm at ground floor | $18,000 |
| Mar 1, 2000 | Completed final sign-off May 2000 | 2039 42nd Av | add: bathrm and work/storage rm @ ground floorDetails
add: bathrm and work/storage rm @ ground floor | $6,000 |