- 0 permits filed
50 permits since 2000: 41 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 never finaled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 29, 2017 | Completed final sign-off Jan 2018 | 4711 18th St | kitchen remodel; demo & remove (e) light fixtures, cabinets, coutnertops, open walls as need to upgrade. install new drywall as needed to patch. add recessed lights; paint.Details
kitchen remodel; demo & remove (e) light fixtures, cabinets, coutnertops, open walls as need to upgrade. install new drywall as needed to patch. add recessed lights; paint. | $20,000 |
| Nov 8, 2017 | Completed final sign-off Jan 2018 | 20 Westwood Dr | remodel kitchen, remove load bearing wall per engineer plans, upgrde eled, plumbing, mech to code, install flooring, new cabinets, countertops, replace kitchen windowDetails
remodel kitchen, remove load bearing wall per engineer plans, upgrde eled, plumbing, mech to code, install flooring, new cabinets, countertops, replace kitchen window | $25,000 |
| Oct 12, 2017 | Completed final sign-off Dec 2017 | 1263 14th Av | upgrade kitchen remodeling. make subpanel electrical for kitchen electric circuit and relocate gas stove. no walls to be relocated or removed.Details
upgrade kitchen remodeling. make subpanel electrical for kitchen electric circuit and relocate gas stove. no walls to be relocated or removed. | $9,000 |
| Jan 20, 2017 | Completed final sign-off Aug 2017 | 350 Church St | unit c -remodel bathroom & kitchen; like for like; same layout; ; no window ; no bearing walls. fan, lights, counter tops, flooringDetails
unit c -remodel bathroom & kitchen; like for like; same layout; ; no window ; no bearing walls. fan, lights, counter tops, flooring | $50,000 |
| Mar 25, 2016 | Completed final sign-off Oct 2018 | 432 Vallejo St | unit a & b: partial interior renovation on (e) 2 units 432 a&b: demo of interior walls, relocation of bathrooms, new & expanded kitchen, new interior stairs to roof and lower level & roof deckDetails
unit a & b: partial interior renovation on (e) 2 units 432 a&b: demo of interior walls, relocation of bathrooms, new & expanded kitchen, new interior stairs to roof and lower level & roof deck | $150,000 |
| Jun 10, 2015 | Completed final sign-off Sep 2015 | 105 Palm Av | remodel kitchen and bathroom, interior only. no windows nor door will be removed, open the wall between kitchen & dining room, remodel bathroom, add led lights in dining room, kitchen & bathroom.Details
remodel kitchen and bathroom, interior only. no windows nor door will be removed, open the wall between kitchen & dining room, remodel bathroom, add led lights in dining room, kitchen & bathroom. | $25,000 |
| May 8, 2015 | Completed final sign-off Jan 2016 | 4397 25th St | relocate kitchen, demo walls, new outlets & lighting. remodel (e) bathroom, new walls.Details
relocate kitchen, demo walls, new outlets & lighting. remodel (e) bathroom, new walls. | $50,000 |
| Apr 21, 2015 | Completed final sign-off Jan 2016 | 17 25th North Av | kitchen remodel, replace cabinets and appliances, replace (e0 ducts. instal 8 led recess lights, replace sheetrock. sheetrock garage area where needed. garage run plumbing and electric from outside walls to inside.Details
kitchen remodel, replace cabinets and appliances, replace (e0 ducts. instal 8 led recess lights, replace sheetrock. sheetrock garage area where needed. garage run plumbing and electric from outside walls to inside. | $6,500 |
| Sep 19, 2014 | Never finaled issued Sep 2014, no final | 108 04th Av | minor kitchen alteration project consisting of demo of (e) upper cabinets & replacement with new, upgrade of electrical outlets to gfci, demo of existing soffit above cabinets, reface existing lower cabinets, no plumbing modification, n/a ordinance #155-13.Details
minor kitchen alteration project consisting of demo of (e) upper cabinets & replacement with new, upgrade of electrical outlets to gfci, demo of existing soffit above cabinets, reface existing lower cabinets, no plumbing modification, n/a ordinance #155-13. | $9,000 |
| Dec 26, 2013 | Completed final sign-off Aug 2014 | 794 Great Hy | remove shear wall between living room and kitchen.Details
remove shear wall between living room and kitchen. | $5,000 |
| Oct 30, 2013 | Completed final sign-off Apr 2014 | 4041 23rd St | 2nd fl, remodel kitchen & bath #1, add 2nd bath. replace hall lighting, remove portion of wall between kitchen and utility roomDetails
2nd fl, remodel kitchen & bath #1, add 2nd bath. replace hall lighting, remove portion of wall between kitchen and utility room | $91,000 |
| Jul 22, 2013 | Completed final sign-off Jul 2014 | 2653 Union St | interior remodel. 1st fl add walls in bedroom, walls to closet, bath remodel, laundry room, new yoga room. 2nd fl: kitchen remodel, walls to be demolished, dining rm. bar demolished & remodel. 3rd fl: remodel 2 baths, add hallway, add walls to bedroom remodelDetails
interior remodel. 1st fl add walls in bedroom, walls to closet, bath remodel, laundry room, new yoga room. 2nd fl: kitchen remodel, walls to be demolished, dining rm. bar demolished & remodel. 3rd fl: remodel 2 baths, add hallway, add walls to bedroom remodel | $15,000 |