Back to bathroom remodel contractors
Atlas Constr& Dev. Dba:Good Fellas Const
- Based in
- Encino
- On San Francisco permits
- Jul 2013 to Feb 2018
- Last 24 months
- 0 permits filed
50 permits since 2000: 41 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 23 completed, 2 never finaled. Typically 0 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2018 | Completed final sign-off Mar 2018 | 1556 Jones St | complete bathroom remodel with wall removal and shower additionDetails
complete bathroom remodel with wall removal and shower addition | $8,000 |
| Nov 13, 2017 | Completed final sign-off Jan 2018 | 20 Westwood Dr | bathroom like-like complete reminder. replace tile, new flooring, instsall new tub, shower pan & toilet. upgrade plumbing & electrical by code. no change to walls locations.Details
bathroom like-like complete reminder. replace tile, new flooring, instsall new tub, shower pan & toilet. upgrade plumbing & electrical by code. no change to walls locations. | $8,000 |
| Nov 13, 2017 | Completed final sign-off Feb 2018 | 37 Ashbury Tr | bathroom remodel in same location. demo entire bathroom to include pcking open house. remove all (e) & hard debris by code. pass all inspections by code. instal new tile for flooring walls, shower pans, install new showers system, install new vanity (sink) toilet, mirror & all finished materials.Details
bathroom remodel in same location. demo entire bathroom to include pcking open house. remove all (e) & hard debris by code. pass all inspections by code. instal new tile for flooring walls, shower pans, install new showers system, install new vanity (sink) toilet, mirror & all finished materials. | $8,000 |
| Oct 27, 2017 | Completed final sign-off May 2018 | 476 21st Av | upper unit - master bath- replace tiles flooring, new toilet & light fixtures, exchange new new fan w/ humidity sensor, paint (same location). powder room-replace floor tiles and paintDetails
upper unit - master bath- replace tiles flooring, new toilet & light fixtures, exchange new new fan w/ humidity sensor, paint (same location). powder room-replace floor tiles and paint | $7,500 |
| Oct 12, 2017 | Completed final sign-off Dec 2017 | 1263 14th Av | (1) bathroom remodeling, downstairs only. install new gfci outlet, new shower pan, new tiles, new shower valve, same location fixtures.Details
(1) bathroom remodeling, downstairs only. install new gfci outlet, new shower pan, new tiles, new shower valve, same location fixtures. | $7,000 |
| May 18, 2017 | Completed final sign-off Jul 2017 | 327 Hill St | remodel master and guest bathrooms: remove/replace like for like. tub/shower "temp doors. led recessed lights, update outlets to gfi's as needd, fans, flooring, paint, vanities, toilets. "no walls", no windows", "no structural work".Details
remodel master and guest bathrooms: remove/replace like for like. tub/shower "temp doors. led recessed lights, update outlets to gfi's as needd, fans, flooring, paint, vanities, toilets. "no walls", no windows", "no structural work". | $15,000 |
| Jan 20, 2017 | Never finaled issued Jan 2017, no final | 35 Beideman St | master bathroom remodel; like for like; same layout; elec, mech, plumbing, fan, led lights, tub, vanityDetails
master bathroom remodel; like for like; same layout; elec, mech, plumbing, fan, led lights, tub, vanity | $11,000 |
| Jan 20, 2017 | Completed final sign-off Aug 2017 | 350 Church St | unit c -remodel bathroom & kitchen; like for like; same layout; ; no window ; no bearing walls. fan, lights, counter tops, flooringDetails
unit c -remodel bathroom & kitchen; like for like; same layout; ; no window ; no bearing walls. fan, lights, counter tops, flooring | $50,000 |
| May 12, 2016 | Never finaled issued May 2016, no final | 1001 Pine St | unit 512: bathroom remodel, in-kind; change shower pan, upgrade some electricalDetails
unit 512: bathroom remodel, in-kind; change shower pan, upgrade some electrical | $4,000 |
| Mar 28, 2016 | Completed final sign-off May 2016 | 425 01st St | replace (e) recessed lights (led, compliant); install new ceiling lights in kichen & bathroom; install like-for-like new shower.Details
replace (e) recessed lights (led, compliant); install new ceiling lights in kichen & bathroom; install like-for-like new shower. | $5,500 |
| Mar 25, 2016 | Completed final sign-off Oct 2018 | 432 Vallejo St | unit a & b: partial interior renovation on (e) 2 units 432 a&b: demo of interior walls, relocation of bathrooms, new & expanded kitchen, new interior stairs to roof and lower level & roof deckDetails
unit a & b: partial interior renovation on (e) 2 units 432 a&b: demo of interior walls, relocation of bathrooms, new & expanded kitchen, new interior stairs to roof and lower level & roof deck | $150,000 |
| Oct 30, 2015 | Completed final sign-off Jan 2016 | 2159 47th Av | bathroom remodel. no layout changes. (4) led recessed lights, replace fan (1) gfi. no structural work. now change to walls or doors.Details
bathroom remodel. no layout changes. (4) led recessed lights, replace fan (1) gfi. no structural work. now change to walls or doors. | $10,000 |
| Jun 30, 2015 | Completed final sign-off Sep 2015 | 5175 Diamond Heights Bl | 2 bathroom remodel like for like (haal & master) in master instead of shower replace to tub in same location. replace toilet, vanity, tub, add 2 gfci in master bath. no walls moved, removed or added. all layout unchanged remeain intavt.. all fire-ratedDetails
2 bathroom remodel like for like (haal & master) in master instead of shower replace to tub in same location. replace toilet, vanity, tub, add 2 gfci in master bath. no walls moved, removed or added. all layout unchanged remeain intavt.. all fire-rated | $20,000 |
| Jun 10, 2015 | Completed final sign-off Sep 2015 | 105 Palm Av | remodel kitchen and bathroom, interior only. no windows nor door will be removed, open the wall between kitchen & dining room, remodel bathroom, add led lights in dining room, kitchen & bathroom.Details
remodel kitchen and bathroom, interior only. no windows nor door will be removed, open the wall between kitchen & dining room, remodel bathroom, add led lights in dining room, kitchen & bathroom. | $25,000 |
| Jun 8, 2015 | Completed final sign-off Jul 2015 | 2125 Bryant St | remove non bearing wall to convert master bedroom and bath to study and great roomDetails
remove non bearing wall to convert master bedroom and bath to study and great room | $13,000 |
| May 8, 2015 | Completed final sign-off Jan 2016 | 4397 25th St | relocate kitchen, demo walls, new outlets & lighting. remodel (e) bathroom, new walls.Details
relocate kitchen, demo walls, new outlets & lighting. remodel (e) bathroom, new walls. | $50,000 |
| Dec 31, 2014 | Completed final sign-off Jan 2016 | 17 25th North Av | interior remodel of 4 bathrooms. removal of walls, fixture upgrades, new high eff light fixtures and cfci out outlets. relocate toilet approx 3' ft adjacent and shower fixture. compliance with maher ordinance no 155-13 not required.Details
interior remodel of 4 bathrooms. removal of walls, fixture upgrades, new high eff light fixtures and cfci out outlets. relocate toilet approx 3' ft adjacent and shower fixture. compliance with maher ordinance no 155-13 not required. | $80,000 |
| Dec 3, 2014 | Completed final sign-off Oct 2016 | 541 Mississippi St | addition of new master bathroom over (e) deck over 1st floor. addition to master bedroom over (e) 1st floor roof / deck. change garage door wider door.Details
addition of new master bathroom over (e) deck over 1st floor. addition to master bedroom over (e) 1st floor roof / deck. change garage door wider door. | $60,000 |
| Dec 1, 2014 | Completed final sign-off May 2015 | 10 El Sereno Ct | complete remodel of 3 existing bathrooms with all new fixtures and finishes. scope include removal of a sauna, moving one bathtub use from the upper level to the lower level. adding 3 exhaust fansDetails
complete remodel of 3 existing bathrooms with all new fixtures and finishes. scope include removal of a sauna, moving one bathtub use from the upper level to the lower level. adding 3 exhaust fans | $45,000 |
| Nov 3, 2014 | Completed final sign-off Jun 2015 | 635 38th Av | interior remodel. add one media room and new bedroom, one full bathroom and new laundry room on 1st floor. rebuild existing interior stairway.Details
interior remodel. add one media room and new bedroom, one full bathroom and new laundry room on 1st floor. rebuild existing interior stairway. | $60,000 |
| Oct 15, 2014 | Completed final sign-off Feb 2015 | 2125 Santiago St | interior remodel of second floor powder room to a full bath and closet area.Details
interior remodel of second floor powder room to a full bath and closet area. | $12,000 |
| Apr 16, 2014 | Completed final sign-off May 2014 | 695 05th St | bathroom fixture replacement at a live/work loft with plumbing & electrical changing bathtub to shower.Details
bathroom fixture replacement at a live/work loft with plumbing & electrical changing bathtub to shower. | $7,250 |
| Nov 13, 2013 | Completed final sign-off Jun 2014 | 1239 04th Av | remodel 2 existing bathrooms - no new space, new tubs, sinks, gfci outlets, alter plumbing, tile & lighting.Details
remodel 2 existing bathrooms - no new space, new tubs, sinks, gfci outlets, alter plumbing, tile & lighting. | $10,000 |
| Oct 30, 2013 | Completed final sign-off Apr 2014 | 4041 23rd St | 2nd fl, remodel kitchen & bath #1, add 2nd bath. replace hall lighting, remove portion of wall between kitchen and utility roomDetails
2nd fl, remodel kitchen & bath #1, add 2nd bath. replace hall lighting, remove portion of wall between kitchen and utility room | $91,000 |
| Jul 22, 2013 | Completed final sign-off Jul 2014 | 2653 Union St | interior remodel. 1st fl add walls in bedroom, walls to closet, bath remodel, laundry room, new yoga room. 2nd fl: kitchen remodel, walls to be demolished, dining rm. bar demolished & remodel. 3rd fl: remodel 2 baths, add hallway, add walls to bedroom remodelDetails
interior remodel. 1st fl add walls in bedroom, walls to closet, bath remodel, laundry room, new yoga room. 2nd fl: kitchen remodel, walls to be demolished, dining rm. bar demolished & remodel. 3rd fl: remodel 2 baths, add hallway, add walls to bedroom remodel | $15,000 |