Atlas Constr& Dev. Dba:Good Fellas Const
- Based in
- Encino
- On San Francisco permits
- Jul 2013 to Feb 2018
- Last 24 months
- 0 permits filed
50 permits since 2000: 41 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 228 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2015 | Completed final sign-off Jan 2016 | 7 Carpenter Ct | 40% repair of front wood deck - no change in design or construction.Details
40% repair of front wood deck - no change in design or construction. | $8,000 |
| Dec 3, 2014 | Completed final sign-off Oct 2016 | 541 Mississippi St | addition of new master bathroom over (e) deck over 1st floor. addition to master bedroom over (e) 1st floor roof / deck. change garage door wider door.Details
addition of new master bathroom over (e) deck over 1st floor. addition to master bedroom over (e) 1st floor roof / deck. change garage door wider door. | $60,000 |