Back to kitchen remodel contractors
Art Of Construction Inc
- Based in
- So San Francisco
- On San Francisco permits
- Sep 2001 to Jun 2026
- Last 24 months
- 8 permits filed
160 permits since 2000: 139 completed, 2 in progress, 12 never finaled, 7 expired or cancelled.
Of the 12 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
36 kitchen remodel permits: 31 completed, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2025 | Completed final sign-off Dec 2025 | 1529 Beach St | replacing existing windows and doors in kind, no change to opening, no change in location. kitchen and bath renovation. 5 windows face the street,setback all. others facing side yard or rear yard.Details
replacing existing windows and doors in kind, no change to opening, no change in location. kitchen and bath renovation. 5 windows face the street,setback all. others facing side yard or rear yard. | $150,000 |
| Nov 5, 2024 | Completed final sign-off Aug 2025 | 558 Munich St | cosmetic kitchen remodel. plumbing and electricalDetails
cosmetic kitchen remodel. plumbing and electrical | $22,000 |
| Sep 8, 2023 | Completed final sign-off Jan 2024 | 1487 Greenwich St | kitchen remodel: replacing cabinets, countertops, flooring and appliances with new.Details
kitchen remodel: replacing cabinets, countertops, flooring and appliances with new. | $55,000 |
| Jul 12, 2023 | Completed final sign-off May 2024 | 815 24th Av | kitchen remodel, new cabinets, plumbing, appliances, sink in pantryDetails
kitchen remodel, new cabinets, plumbing, appliances, sink in pantry | $87,000 |
| Oct 25, 2022 | Never finaled issued Nov 2022, no final | 1350 06th Av | rev to pa# 2022-0111-5753: install 2 new skylights one over master bed room and one along the side of the kitchen, add in the remoldel of a (e) bathr room on the garage level. install new door btw garage and living space. install wet bar sinkDetails
rev to pa# 2022-0111-5753: install 2 new skylights one over master bed room and one along the side of the kitchen, add in the remoldel of a (e) bathr room on the garage level. install new door btw garage and living space. install wet bar sink | $26,800 |
| Jan 11, 2022 | Never finaled issued Jan 2022, no final | 1350 06th Av | remodel of kitchen, master bath and powder room. relocate (e) interior stairs. no wall alterations. replace exterior bedroom door with like size. add cabinets to living room.Details
remodel of kitchen, master bath and powder room. relocate (e) interior stairs. no wall alterations. replace exterior bedroom door with like size. add cabinets to living room. | $395,000 |
| Nov 22, 2021 | Completed final sign-off Jun 2022 | 1487 Greenwich St | #32:kitchen remodel, remove & install (n) cabinets, appliances, (n) lighting, sink, faucet & flooring. no moving wallsDetails
#32:kitchen remodel, remove & install (n) cabinets, appliances, (n) lighting, sink, faucet & flooring. no moving walls | $65,400 |
| Jun 29, 2021 | Expired or cancelled withdrawn May 2022 | 601 04th St | interior remodel of (e) unit: new kitchen cabinets, counter, appliances, relocate bathroom (new fixtures. demo some (e) cabinets & partiion. some new partitions. new (e) guardrail replacement at light/loft.Details
interior remodel of (e) unit: new kitchen cabinets, counter, appliances, relocate bathroom (new fixtures. demo some (e) cabinets & partiion. some new partitions. new (e) guardrail replacement at light/loft. | $30,000 |
| Jun 4, 2021 | Completed final sign-off Aug 2024 | 1232 Cortland Av | one kitchen & one bathroom remodel. new cabinets,flooring,and finishes. add outlets per code, add angel stop for ice maker. install 9 additional can lights. replace all existing angle stops. replace shower valve. install new baseboard & trim. non structuralDetails
one kitchen & one bathroom remodel. new cabinets,flooring,and finishes. add outlets per code, add angel stop for ice maker. install 9 additional can lights. replace all existing angle stops. replace shower valve. install new baseboard & trim. non structural | $20,000 |
| Nov 10, 2020 | Completed final sign-off Feb 2023 | 1723 29th Av | 1st fl rear yard add & interior renov, (n)bedrm w/ deck above. 2nd fl interior alteration, add bathrm, renov kitchen & (e) bathrm, renov (2)back bedrm. expand (e) bldg envelope. (n)aluminum clad wood to replace wood window inkind front facade. not increase height of bldgDetails
1st fl rear yard add & interior renov, (n)bedrm w/ deck above. 2nd fl interior alteration, add bathrm, renov kitchen & (e) bathrm, renov (2)back bedrm. expand (e) bldg envelope. (n)aluminum clad wood to replace wood window inkind front facade. not increase height of bldg | $120,000 |
| Jan 15, 2020 | Completed final sign-off Jul 2020 | 2 Kronquist Ct | kitchen remodel consisting of new cabinets, new countertops, installing new appliances. replace existing skylights for like size and typeDetails
kitchen remodel consisting of new cabinets, new countertops, installing new appliances. replace existing skylights for like size and type | $80,000 |
| Nov 14, 2019 | Completed final sign-off Jun 2022 | 1032 Broadway | revision to pa 2019-0326-6241 interior remodel to (e) residence including kitchen and bathrooms, and reconfigured floor plan. no exterior changes. no increase habitable area or conditioned volumeDetails
revision to pa 2019-0326-6241 interior remodel to (e) residence including kitchen and bathrooms, and reconfigured floor plan. no exterior changes. no increase habitable area or conditioned volume | $300,000 |
| Mar 26, 2019 | Expired or cancelled expired Jan 2023 | 1032 Broadway | interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maherDetails
interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maher | $100,000 |
| Feb 6, 2019 | Completed final sign-off Jun 2019 | 325 China Basin St | unit 104: kitchen remodel in-kind, install new cabinetry, plumbing fixtures, reinstall (e) appliances.Details
unit 104: kitchen remodel in-kind, install new cabinetry, plumbing fixtures, reinstall (e) appliances. | $45,000 |
| Sep 27, 2018 | Completed final sign-off Jan 2019 | 51 Shawnee Av | kitchen remodel. remodel bathroom - tile shower, new fixtures. replacing 7 windows at rear & light well. u factor max. .32 same size.Details
kitchen remodel. remodel bathroom - tile shower, new fixtures. replacing 7 windows at rear & light well. u factor max. .32 same size. | $63,500 |
| Jul 27, 2018 | Completed final sign-off May 2019 | 140 Commonwealth Av | remodel (2) bathrooms, (2) kitchenttes/bars, in-kind; new plumbing/electrical fixtures throughout; new tile/cabinetry; replace (6) windows non-street facing in-kind; no wall additions/relocations, no structural workDetails
remodel (2) bathrooms, (2) kitchenttes/bars, in-kind; new plumbing/electrical fixtures throughout; new tile/cabinetry; replace (6) windows non-street facing in-kind; no wall additions/relocations, no structural work | $115,000 |
| Feb 23, 2018 | Completed final sign-off Sep 2018 | 1487 Greenwich St | remodel: demo/replace like-for-like, kitchen - new appliances, cabinetry, counter top. install (n) ceiling canlights & gfci outlets per code. master & guest bath. install (n) plumbing fixtures gfci outlets & electrical fixtures per code. new shower pan and new tub. (1) kitchen. (2) bathrooms.Details
remodel: demo/replace like-for-like, kitchen - new appliances, cabinetry, counter top. install (n) ceiling canlights & gfci outlets per code. master & guest bath. install (n) plumbing fixtures gfci outlets & electrical fixtures per code. new shower pan and new tub. (1) kitchen. (2) bathrooms. | $82,000 |
| Dec 23, 2016 | Completed final sign-off Dec 2019 | 187 15th Av | 3 level rear addition & interior remodel (kitchen, dining, master suite, bath) partial lower level conversion to living space with lowered slab (family room, guest bedroom, bath, laundry) increase from 3 bedroom / 1.5 baths to 4 bedrooms / 3.5 bath home.Details
3 level rear addition & interior remodel (kitchen, dining, master suite, bath) partial lower level conversion to living space with lowered slab (family room, guest bedroom, bath, laundry) increase from 3 bedroom / 1.5 baths to 4 bedrooms / 3.5 bath home. | $425,000 |
| Sep 7, 2016 | Completed final sign-off Mar 2017 | 3 Lupine Av | interior remodel of kitchen, master bathroom, dress room and master bedrom. structural work associated with removal of interior walls.Details
interior remodel of kitchen, master bathroom, dress room and master bedrom. structural work associated with removal of interior walls. | $150,000 |
| Apr 7, 2016 | Completed final sign-off Sep 2016 | 3725 Folsom St | update kitchen cabinets, create open concept for kitchen, dining, and living rm. expand existing master bath into existing closetsDetails
update kitchen cabinets, create open concept for kitchen, dining, and living rm. expand existing master bath into existing closets | $45,000 |
| May 4, 2015 | Completed final sign-off Aug 2015 | 1115 Fell St | apt #3: new kitchen cabinets & floor. new bathroom floor, electrical & plumbing. two walls to be moved in kitchen. structural work. all fire rated assemblies to be maintained. new window in kitchen - in kind. new hardwood in hall, kitchen & living room. reframe kitchen ceilingDetails
apt #3: new kitchen cabinets & floor. new bathroom floor, electrical & plumbing. two walls to be moved in kitchen. structural work. all fire rated assemblies to be maintained. new window in kitchen - in kind. new hardwood in hall, kitchen & living room. reframe kitchen ceiling | $30,000 |
| Apr 17, 2015 | Completed final sign-off Sep 2015 | 35 Madrid St | to comply with nov 201407681: remove shower, reloate toilet & sink. remove wingwall, remove kitchenette - including range & cabintry, replace (e) exterior steps.Details
to comply with nov 201407681: remove shower, reloate toilet & sink. remove wingwall, remove kitchenette - including range & cabintry, replace (e) exterior steps. | $9,500 |
| Nov 18, 2014 | Completed final sign-off May 2015 | 31 Mullen Av | second floor interior remodel, three new windows & one door at rear facade, upper level, relocate new kitchen in new area on 2nd floor.Details
second floor interior remodel, three new windows & one door at rear facade, upper level, relocate new kitchen in new area on 2nd floor. | $25,000 |
| Sep 26, 2014 | Completed final sign-off Nov 2016 | 343 Liberty St | addition to legal unit# 2 (345). extending 15 ft. into rear yard. no change to sq. ft. of (e) non-conforming legal unit# 1 (343) remodel (e) kitchens in both units. sprinkler system under seperate permit.Details
addition to legal unit# 2 (345). extending 15 ft. into rear yard. no change to sq. ft. of (e) non-conforming legal unit# 1 (343) remodel (e) kitchens in both units. sprinkler system under seperate permit. | $350,000 |
| Dec 2, 2013 | Completed final sign-off Jul 2017 | 382 Texas St | renovating & expanding (e) single family dwelling which will include expanding into the front & rear of the (e) structure & adding a partial upper floor. replace (e) windows/door & deck & interior kitchen/bath remodeling.Details
renovating & expanding (e) single family dwelling which will include expanding into the front & rear of the (e) structure & adding a partial upper floor. replace (e) windows/door & deck & interior kitchen/bath remodeling. | $445,000 |
| Nov 8, 2012 | Completed final sign-off Feb 2013 | 12 Sanchez St | remove bearing wall between kitchen & family room, change 2 windows as in kind (same size), kitchen remodeling. level floor at laundry roomDetails
remove bearing wall between kitchen & family room, change 2 windows as in kind (same size), kitchen remodeling. level floor at laundry room | $45,000 |
| Jul 11, 2012 | Completed final sign-off Sep 2012 | 4331 19th St | kitchen remodel: replace cabinets, applicanes & flooring with new lighting & outlets. replace (e) rear door and window in-kind over sink. no wall relocation. no rough opening changes. u-factor for glazing shall not exceed 0.40.Details
kitchen remodel: replace cabinets, applicanes & flooring with new lighting & outlets. replace (e) rear door and window in-kind over sink. no wall relocation. no rough opening changes. u-factor for glazing shall not exceed 0.40. | $33,500 |
| Jul 20, 2011 | Completed final sign-off Dec 2011 | 105 Liberty St | interior remodel of kitchen, laundry closet, storage areas includes re-cladding an existing wood burning fireplace, replacing lighting fixtures, appliances & relocating an electric panel. no change to footprint, ext walls, or windows.Details
interior remodel of kitchen, laundry closet, storage areas includes re-cladding an existing wood burning fireplace, replacing lighting fixtures, appliances & relocating an electric panel. no change to footprint, ext walls, or windows. | $95,000 |
| Mar 29, 2011 | Completed final sign-off Jul 2011 | 2635 15th Av | kitchen remodel replace window in light well with like sizeDetails
kitchen remodel replace window in light well with like size | $22,000 |
| Oct 4, 2010 | Completed final sign-off Feb 2012 | 631 Ofarrell St | kitchen and bathroom remodel. no structural. no doors/windows/walls under this permitDetails
kitchen and bathroom remodel. no structural. no doors/windows/walls under this permit | $20,000 |
| Jul 29, 2009 | Completed final sign-off Nov 2009 | 33 Pond St | kitchen remodel. no exterior work. no wall changes. no lightingDetails
kitchen remodel. no exterior work. no wall changes. no lighting | $15,000 |
| Sep 19, 2008 | Completed final sign-off Feb 2009 | 2360 09th Av | remove existing cabinets & sheetrock behind, rewire per code , re-sheet and install new cabinets, add passthrough opening to dining room, move kitchen sink 1 foot to right. electrical/plumbing on separate permit.Details
remove existing cabinets & sheetrock behind, rewire per code , re-sheet and install new cabinets, add passthrough opening to dining room, move kitchen sink 1 foot to right. electrical/plumbing on separate permit. | $10,000 |
| Mar 28, 2008 | Completed final sign-off Nov 2008 | 2360 09th Av | kitchen remodel, change sink, countertop and cabinets.Details
kitchen remodel, change sink, countertop and cabinets. | $25,000 |
| Sep 5, 2007 | Expired or cancelled expired Apr 2009 | 900 Ashbury St | interior remodel@unit#2/ remodel kitchen-1st floor/two bathrooms 2nd floor/add new headers @ 1st and 2nd floor/reconfigure non-load bearing partitions/replace in kind windoows @ street face/create new window openings @ rear.Details
interior remodel@unit#2/ remodel kitchen-1st floor/two bathrooms 2nd floor/add new headers @ 1st and 2nd floor/reconfigure non-load bearing partitions/replace in kind windoows @ street face/create new window openings @ rear. | $127,500 |
| Oct 12, 2005 | Completed final sign-off Mar 2006 | 1526 25th Av | kitchen remodel new cabs, appliances, drywall repairs, and flooring, electric permit pulled before oct 1 2005, lighting under electrical permitDetails
kitchen remodel new cabs, appliances, drywall repairs, and flooring, electric permit pulled before oct 1 2005, lighting under electrical permit | $41,000 |
| Oct 9, 2002 | Completed final sign-off Mar 2003 | 1848 Pine St | kitchen remodel:new appliances,new cabinets,new counter top,new plumbing fixts & upgrade to electricDetails
kitchen remodel:new appliances,new cabinets,new counter top,new plumbing fixts & upgrade to electric | $32,700 |