Art Of Construction Inc
- Based in
- So San Francisco
- On San Francisco permits
- Sep 2001 to Jun 2026
- Last 24 months
- 8 permits filed
160 permits since 2000: 139 completed, 2 in progress, 12 never finaled, 7 expired or cancelled.
Of the 12 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 10 completed, 1 never finaled. Typically 231 days from filing to permit and 453 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2022 | Completed final sign-off Jul 2025 | 115 Belgrave Av | revision to bpa #2017/1004/0424(site)to include the following: adjustments to interior floor plans & window placement,revision to rear deck,revised landscape design & grading.Details
revision to bpa #2017/1004/0424(site)to include the following: adjustments to interior floor plans & window placement,revision to rear deck,revised landscape design & grading. | |
| Nov 10, 2020 | Completed final sign-off Feb 2023 | 1723 29th Av | 1st fl rear yard add & interior renov, (n)bedrm w/ deck above. 2nd fl interior alteration, add bathrm, renov kitchen & (e) bathrm, renov (2)back bedrm. expand (e) bldg envelope. (n)aluminum clad wood to replace wood window inkind front facade. not increase height of bldgDetails
1st fl rear yard add & interior renov, (n)bedrm w/ deck above. 2nd fl interior alteration, add bathrm, renov kitchen & (e) bathrm, renov (2)back bedrm. expand (e) bldg envelope. (n)aluminum clad wood to replace wood window inkind front facade. not increase height of bldg | $120,000 |
| Sep 18, 2019 | Never finaled issued Oct 2019, no final | 31 Mullen Av | revision to bpa #201904057275.remove 2nd floor rear deck, replace with guardrailDetails
revision to bpa #201904057275.remove 2nd floor rear deck, replace with guardrail | $100 |
| Apr 6, 2017 | Completed final sign-off Aug 2020 | 554 Liberty St | horizontal addition & interior remodel to (e) sfr. addition of a bedroom & bathroom @ ground floor. addition of 1 bedroom & 2 bathrooms @ 2nd floor. replace (e) windows in kind. new deck @ rear yard.Details
horizontal addition & interior remodel to (e) sfr. addition of a bedroom & bathroom @ ground floor. addition of 1 bedroom & 2 bathrooms @ 2nd floor. replace (e) windows in kind. new deck @ rear yard. | $200,000 |
| Mar 15, 2017 | Completed final sign-off Aug 2018 | 538 Congo St | exploratory demo to confirm structural conditions in wall. remove 30 sq ft of decking at rear deck to dig pot hole in order to measure the depth of (e) footing at east elevation. remove 30 sq ft of main floor overhang soffit to confirm direction of floor framing. remove 50 sq ft of drywall in bsmtDetails
exploratory demo to confirm structural conditions in wall. remove 30 sq ft of decking at rear deck to dig pot hole in order to measure the depth of (e) footing at east elevation. remove 30 sq ft of main floor overhang soffit to confirm direction of floor framing. remove 50 sq ft of drywall in bsmt | $800 |
| Mar 31, 2016 | Completed final sign-off Oct 2016 | 1772 Dolores St | remove & replace existing dyr-rotted deck (2 floors) @ front of bldg (same size).Details
remove & replace existing dyr-rotted deck (2 floors) @ front of bldg (same size). | $50,000 |
| Dec 2, 2013 | Completed final sign-off Jul 2017 | 382 Texas St | renovating & expanding (e) single family dwelling which will include expanding into the front & rear of the (e) structure & adding a partial upper floor. replace (e) windows/door & deck & interior kitchen/bath remodeling.Details
renovating & expanding (e) single family dwelling which will include expanding into the front & rear of the (e) structure & adding a partial upper floor. replace (e) windows/door & deck & interior kitchen/bath remodeling. | $445,000 |
| Jun 7, 2013 | Completed final sign-off Mar 2015 | 919 Church St | new wooden deck & steps, new concrete patio & concrete steps, new gravel pation, new low rotaining walls, installation of partially in-grade shipping container with deck & planted roof.Details
new wooden deck & steps, new concrete patio & concrete steps, new gravel pation, new low rotaining walls, installation of partially in-grade shipping container with deck & planted roof. | $100,000 |
| Dec 3, 2007 | Completed final sign-off Apr 2009 | 900 Ashbury St | comply compl. #200732050. (n) framing for (e) upper rear balcony to replace damaged & rotted framing - no alter. to size. (n) wood deck @ rear yard - ave. htg. approx. 2'-0" above grade. no point on deck greater than 2'-10" above grade. install stone veneer atop perimeter conc stem wall arounnd deckDetails
comply compl. #200732050. (n) framing for (e) upper rear balcony to replace damaged & rotted framing - no alter. to size. (n) wood deck @ rear yard - ave. htg. approx. 2'-0" above grade. no point on deck greater than 2'-10" above grade. install stone veneer atop perimeter conc stem wall arounnd deck | $36,000 |
| Nov 15, 2007 | Completed final sign-off May 2008 | 900 Ashbury St | remove stucco and dry rot repair to front terrace in kind. revision to appl#200709051790 demo front deck, replace all frame with new, replace floor framing with pt 4x4 floor joist, reuse existing ballusters and caps, and install new floor tiles and 2 floor drains.Details
remove stucco and dry rot repair to front terrace in kind. revision to appl#200709051790 demo front deck, replace all frame with new, replace floor framing with pt 4x4 floor joist, reuse existing ballusters and caps, and install new floor tiles and 2 floor drains. | $7,200 |
| Feb 23, 2006 | Completed final sign-off Apr 2007 | 1039 Cole St | horizontal extension at upper level of a new family room(190 sf)over an extg kchn minor interior remodel including 1 bathrooms and creation of a new powder room on main level (addition of 10 sf)deck at rear is replaced with new enlarged deck.Details
horizontal extension at upper level of a new family room(190 sf)over an extg kchn minor interior remodel including 1 bathrooms and creation of a new powder room on main level (addition of 10 sf)deck at rear is replaced with new enlarged deck. | $95,000 |